Notice of Violation from Insp on 970528-0721.Violation Noted:As of 960726,licensee Did Not Implement & Maintain in Effect Certain Provisions of Approved FP Program as Described in UFSAR for Facility
ML20198Q918
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/29/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20198Q873 List:
References
50-352-97-06, 50-352-97-6, 50-353-97-06, 50-353-97-6, EA-97-340, NUDOCS 9711130086
Download: ML20198Q918 (2)


Text

.

1 0-ENCLotuRE .

NOTICE OF VIDLATION PECO Nuclear Docket Nos. 50 352150 353 Limerick Nuclear Generet'no Station Lloonee Nos. NPF-39; NPF 85 Units 1 and 2 EA No. 97 340 During an NRC Inspection conducted between May 28,1997 through July 21,1997, a .

violation of NRC requirements was identified, in accordance with the " General 4tatement of .

Policy and Procedure for NRC Enforcement Actions,' NUREG 1600, the violation is set forth )

below Limerick Ocnerating Station (LOS) Unit 2 License Condition 2.C.(3) requires that the l licensee shall implement and maintain in effect all provisions of the approved Fire  !

Protection Program as described in the Updated Final Safety Analysis Report (UFSAR)  ;

for the facility.

]

LGS UFSAR Section 9A.3.2.2 describes repair actions that may be needed in order to compensate for the of fects of fire caused damage to equipment and systems involved in achieving and maintaining t ec wn condition. Section 9A.3.2.2,' Item 33.a, describes as a repair action the Installation of a temporary cable to provide power to the Automatic Depressurization System (ADSl solenoid pilot valves. -

LOS UFSAR Section 9A.3.1.2, item 108, etates that fixed self-contained lighting units with Individual 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> battery power supplies are provided in all ereas to which socess may ba needed for manual actuation of safe shutdown equipment, and in access and -

ooress routes thereto.

Contrary to the above, as of July 28,1996, the lleences did not implement and maintain in effect certain provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report (UFSAR) for the facility in that

-1.- a temporary cable to provide power to the Unit 2 AD3 solenoid pilot valves did not exist; and

2. . the pathways for the installation of the temporary cables for both Unit 1 and Unit 2, areas to which access may be needed for manual actuation of safe shutdown equipment, were not provided with fixed self contained lighting units with Individual 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> battery power supplies. (01013)

This is a Severity Level lli violation (Supplement 1).

. The NRC has concluded that information rsgarding the reason for the violation, the corrective 7 actione taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in Lloensee Event Report No.96-015, a': well as your September 12,1997 letter to the NRC. However, you are
required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the KO 2 SO/PO*d- PSES/EE019= I ddQ riiB0 tE61-OC-d3E

e SO'd 7J101

\

Iinolosure 2 description therein does not accurately reflect your corrective actions or your position, in that case, or if you choose to respond, clearly mark your response as a " Reply to a Hotice of Violation,' and send itto the U.S.Nucicar Regulatory Commisslor., ATTN Document Control

' Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Hesident inspector at the fscility that is the subject of this Notice, within 30 days of the date of the letter transmining this Notice of Violation (Notice).

! i Dated at King of Prussia, Penneytvania ,

this29t.hday of September 1997  ;

{.

I i

6

$0/S0*d ' KTC>m19 M pit 80 4661-DE-d3S

_. . .