ML20245C249
| ML20245C249 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 04/17/1989 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20245C241 | List: |
| References | |
| 50-352-89-08, 50-352-89-8, NUDOCS 8904270074 | |
| Download: ML20245C249 (2) | |
Text
,___-
APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket Nos.
50-352 Limerick Generating Station, Unit 1 License Nos. NMP-39 As a result of the inspection conducted on March 7-9 and 20-23,1989, and in accordance with the General Statement of Policy Procedure for NRC Enforcement Actions,10 CFR Part 2, Appendix C (Enforcement Policy 1988),
the following violation was identified.
THIS PAUSENI Ceml5S SAFEGUANS
!SIDEh!!2?LC3 IS IGT l'OR PJBLIC DiSCLGEUIE, li IS isTSTI0liALLY LEFIDLAE.
This is a Severity Level IV Violation.
(Supplement III)
No response to this violation is required since prompt and effective corrective action was taken during the inspection.
Ohk $ffjy m3 0FFICIAL RECORD COPY SG CIR PEC0 89-08/14 - 0005.0.0 04/14/89 I
. t::u r 37: >,
CWmvG
../ JL A..-
p.v : a y,- ' u.. ::)
?1..$fP/Cd
....... S ( 7_~ U g r
- 1.. o.
~ :1 m
n-APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket Nos.
50-352 Limerick Generating Station, Unit 1 License Nos. NMP-39 As a result of the inspection conducted on March 7-9 and 20-23,1989, and in accordance with the General Statement of Policy Procedure for NRC Enforcement Actions,10 CFR Part 2, Appendix C (Enforcement Policy 1988),
' the following violation was identified.
11115 P!3FEi CUT!B MEcppgs
':T? W 6 !Di iOl EJJ.10 Uo'UE,J, II C !SiihCilllY (Bi W d This is a Severity Level IV Violation.
(Supplement III)
No response to this violation is required since prompt and effective corrective action was taken during the inspection.
i
)
-