Notice of Violation from Insp on 871012-1115.Violation noted:26-inch Diameter Emergency Diesel Generator Air Intake Piping Depicted on Isometric JBD-461-2 Installed as non-ASME Matl
ML20237A521
Person / Time
Site: Limerick, 07100012 Constellation icon.png
Issue date: 12/07/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20237A512 List:
References
50-353-87-14, NUDOCS 8712150061
Download: ML20237A521 (1)


Text

_ _ _ _ _

.

APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket No. 50-353 Limerick Unit 2 License No. CPPR-107 As a result of the inspection conducted on October 12, 1987 to November 15, 1987, and in accordance with 10 CFR 2, Appendix C (Enforcement Policy 1987),

the following violation was identifie CFR 50 Appendix B, Criterion III requires that measures shall be established to assure that regulatory requirements and the design basis specified in the license application are correctly translated into specifications and drawings. The Limerick Construction Quality Assurance Program Appendix D-6.2 specifies that Final Safety Analysis Report requirements will be translated into appropriate engineering specifications, drawings and purchase orders. The Limerick Final Safety Analysis Report Section 3.2.2.d states that field installed ANSI B3 emergency diesel generator auxiliary piping will be procurred as ASME )

material, that welds greater than two inches diameter will be radiographer and that pneumatic tests will be performed at 1.25 times the design pressur Contrary to the above, on November 4,1987, the 26 inch diameter emergency diesel generator air intake piping depicted on isometric JBD-461-2 was installed as non-ASME material, the welds had not been radiographer and pneumatic tests had not been performed on the pipin These supplementary FSAR requirements had not been incorporated in the applicable piping design and installation specifications P-300, P-301-2, P-305 or P-32 This is a Severity Level V Violation (Supplement II). 5 Pursuant to the provision of 10 CFR 2.201, Philadelphia Electric Company is hereby required to submit to tnis office within 30 days of the date of the letter transmitting this Notice, a written statement of explanation in reply to the violation to include: (1) the corrective steps which have been taken and the results achieved; (2) the corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending tim PDR ADOCK05000gg3 G

0FFICIAL RECORD COPY IR LIM 2 87-14 - 0003. /07/87