Notice of Violation from Insp on 930817-0925. Violations Noted:Inspector Identified That Radwaste Technician Had Exited RCA W/O Properly Frisking Through Portal Monitor
ML20059C354
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/15/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20059C327 List:
References
50-352-93-22, 50-353-93-22, NUDOCS 9311010124
Download: ML20059C354 (1)


Text

y ,

a APPENDIX A NOTICE OF VIOLATION E

Philadelphia Electric Company Docket No. 50-352 and 50-353 Limerick Generating Station License No. NPF-39 and NPF-85 Units 1 and 2 During an NRC inspection conducted on August 17 to September 25,1993, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:

Technical Specification (TS), Section 6.11, states that procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure. ,

i Administrative Procedure A-C-107, Revision 14, Radiation Work Permit Program and Radiological Controlled Area Access Requirements, Step 5.4, written to comply with TS 6.11, states, in part, that it is all workers' responsibility to comply with established postings in the RCA. Posted requirements for personnel exiting the RCA ,

are that all personnel shall pass through a portal monitor before stepping across a stepoff pad. .

Contrary to the above, on August 23,1993, the inspectors identified that a radwaste technician had exited the RCA without properly frisking through a portal monitor.

This is a Severity Level IV Violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is hereby ,

required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

< Dated at King of Prussia, Pennsylvania this 151bday of October 1993 9311010124 931015 PDR ADOCK 05000352 0 PDR