1
., s .
f
Dd
.
November 15, 1996
i
,
Mr. D. M. Smith, President
PECO Nuclear
I
Nuclear Group Headquarters
Correspondence Control Desk
-
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-352/96-07,
50-353/96-07; AND NOTICE OF VIOLATION
Dear Mr. Smith:
i
'l
On August 27 through October 21,1996, the NRC completed an inspection at your
-
Limerick 1 & 2 reactor facilities. The enclosed report presents the results of that inspec-
tion,
j
During the 8-week period covered by this inspection period, conduct of activities at the
Limerick 1 & 2 facilities was generally characterized by safe and conservative operations.
.
The inspectors noted that operators and maintenance personnel conducted activities very
<
well. Engineering support of activities was excellent. System managers were seen to be
very involved in activities for their systems, which resulted in the resolution of issues
quickly, and limited the time for systems to be in technical specification limiting conditions
for operation. Additionally, management appeared to be involved in making conservative
decisions and in supporting plant personnel in resolving issues. This resulted in, among
other things, reducing the non-outage corrective maintenance backlog from approximately
900 in June 1996, to approximately 600 in October 1996.
'
Based on the results of this inspection, the NRC has determined that a violation of NRC
,
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice)
I
and the circumstances surrounding it are described in the subject inspection report. A
temporary change was made to a transient response implementation plan procedure and
,
was not reviewed and approved by the appropriate manager designated by administrative
procedures within 14 days of implementation. Additionally, the inspector identified other
concerns with your procedure temporary change process. The process did not assure the
fidelity of temporary changes to programmatic controls for certain higher level procedures
listed as plant impact procedures. Also, your controls for maintaining designated
i
individuals with the authority to approve procedure changes were weak.
The NRC has concluded that information regarding the reason for the violation, the
corrective actions taken and planned to correct the violation and prevent its recurrence are
,
already adequately addressed on the docket in the subject inspection report. Therefore,
4
you are not required to respond to this letter unless the description therein does not
I
.
40I
(
'
9612040147 961115
s
ADCCK 05000352
O
-'
.
.,
e
6
Mr. D. M. Smith '
2
accurately reflect your corrective actions or your position. In that case, or if you choose to
provide additional information, you should follow the instructions specified in the enclosed
Notice,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
,
ORIGINAL SIGNED BY:
Walter J. Pasciak, Chief
Projects Branch 4
1
Division of Reactor Projects
Docket Nos.: 50-352, 50-353
Enclosures:
Inspection Report 50-352/96-07, u0-353/96-07
i
'
1
.
. _ _ _ , . . _ . . _ _ _ . - . _ . - . . ._. _ ...._
.....
... . . _ . . _ . _.__ . . _ . _ . _ . _ . . . _ . _ . . .
__ ._ _. _ _ _ _ . _ . . __ _ _ _ ,
j
2
-
. .
.~
i
!
.
i,-
.
'
l
i
Mr. D. M. Smith
3
4
i
,
cc w/enci:
.
,
j
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
W. MacFarland, Vice President - Limerick Generating Station
i
'
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
t
Secretary, Nuclear Committee of the Board
'
'
Nuclear Safety Information Center (NSIC)
!
Commonwealth of Pennsylvania
i.
4
1
l
.
4, .
.,
l
-
i
.5
i
i
4
1
.
ll
$
I
r
J
4
)
l
4
1
I
f
!
k'
,
g :
i
4
4
4
4
+
'
.
1
,
1
.
4
i
,
t
--
e-,-,_...,+w-.-
w
-
- - -
.- . . - ~v-
--,,
w..
< ,
-
g
--
w,
.
.-.
. .-
..
. --
- -
- ..
.
..
.
.
..
.,
.
Mr. D. M. Smith
4
Distribution w/ encl:
Region i Docket Room (with concurrences)
K. Gallagher, DRP
D. Screnci, PAO (1)
NRC Resident inspector
PUBLIC
,
Distribution w/ encl: (Via E-Mail)
W. Dean, OEDO
F. Rinaldi, NRR
J. Stolz, PDI-2, NRR
inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: g:\\bratsh4\\9607.r
!
To rea.elve e copy of this document, in ate in the boa: 'C
= Co y without attachment / enclosure
"E" = Copy with attachment / enclosure
'
- N' = No copy
,
OFFICE
Rl/DRP/g/ f
Rl/Df%'
,
NAME
PERRY [///)[M
PASC)A$
DATE
10/ /16
'E
11/ Q96'
O\\ l2 /
OFFICIAL RECORD COPY
'
!