MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License ML20196J7651999-06-29029 June 1999 Provides Updated Info Re Loss of Feedwater & Loss of Electric Power Accident Analyses to Support TS Change Request 279 Re Core Protection Safety Limit,As Discussed at 990616 Meeting ML20196J7701999-06-29029 June 1999 Forwards LAR 285 for License DPR-50,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20209C0391999-06-29029 June 1999 Forwards LAR 77 to License DPR-73,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-2 License to Amergen,Radioactive Matl May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20196G2061999-06-23023 June 1999 Requests That NRC Update Current Service Lists to Reflect Listed Personnel Changes That Occurred at TMI 05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements1999-06-23023 June 1999 Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements ML20196D2171999-06-17017 June 1999 Forwards Pmpr 99-9, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990508- 0604.New Summary Personnel Table Was Added to Rept Period.Matl Scientist Joined Staff Period ML20196A0431999-06-15015 June 1999 Providess Notification That Design Verification Activities Related to Calculations Supporting Analytical Values Identified in Gpu Nuclear Ltr to NRC Has Been Completed 05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT1999-06-0909 June 1999 Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT ML20212K2541999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20212K2671999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20195E2751999-06-0404 June 1999 Informs That PCTs & LOCA Lhr Limits Submitted in Util Ltr for LOCA Reanalysis Performed in Support of TMI-1 20% Tube Plugging Amend Request Have Been Revised.Revised PCT & LOCA Lhr Limit Values Are Provided on Encl Table 1 ML20195E3281999-06-0404 June 1999 Forwards Application for Amend to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20195C5721999-06-0202 June 1999 Forwards Description of Gpu Nuclear Plans for Corrective Actions for 1 H Fire Barriers in Fire Zones AB-FZ-3,AB-FZ-5, AB-FZ-7,FH-FZ-2 & Previous Commitments for Fire Zones CB-FA-1 & FH-FZ-6 ML20207E2561999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Change in ECCS Analyses at TMI-1 ML20195B2461999-05-21021 May 1999 Forwards Itemized Response to NRC 990506 RAI for TS Change Request 279 Re Core Protection Safety Limit ML20206R6461999-05-13013 May 1999 Forwards Rev 39 of Modified Amended Physical Security Plan for TMI 05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC1999-05-0707 May 1999 Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC ML20206K6301999-05-0707 May 1999 Provides Addl Info Re TMI-1 LOFW Accident re-analysis Assumptions for 20% Average SG Tube Plugging as Discussed on 990421 ML20206H0781999-04-30030 April 1999 Forwards Rev 0 to 1092, TMI Emergency Plan. Summary of Changes Encl ML20206J4811999-04-30030 April 1999 Provides Summary of Activities at TMI-2 During First Quarter of 1999.TMI-2 RB Was Not Inspected During Quarter.Routine Radiological Surveys of Auxiliary & Fuel Handling Bldgs Did Not Identify Any Significant Adverse Trends ML20206E4121999-04-27027 April 1999 Requests That TS Change Request 257 Be Withdrawn ML20206C5211999-04-23023 April 1999 Requests Mod to Encl Indemnity Agreement Number B-64,on Behalf of Gpu & Affiliates,Meed,Jcpl,Penelec & Amergen Energy Co,Llc.Ltr Supersedes & Withdraws 990405 Request Submitted to NRC ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 1999-09-09
[Table view] |
Text
I 1
{ GPU Nuclear. inc.
( Route 441 South NUCLEAR Post Office Box 480 Middletown, PA 17057-0480 Tel 717-944-7621 6710-96-2309 October 1, 1996 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:
I
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DDR-50 Docket No. 50-289 i Core Reload Methoovi. 3y In accordance with previous discussions, this letter provides additional amdavits from both GPU Nuclear and Framatome Technologies, Inc. (FTI) certifying the basis for application for withholding GPU Nuclear Topical Report TR-092P, Revision 0, dated December 8,1995 from public disclosure. It is our understanding that the enclosed individual amdavits from both GPU w- Nuclear and FTI, each identifying the specific proprietary material within TR-092P, Revision 0 and basis, is required in order to further process GPU Nuclear's original request to withhold this topical report from public disclosure. TR-092P, Revision 0 was previously submitted for NRC review and approval on February 27,1996 (6710-96-2033) with a GPU Nuclear a5 davit l certifying the basis for request from public disclosure due to material in the topical report being l proprietary to both GPU Nuclear and FTI.
If any additional information is required, please contact Mr. David J. Distel, GPU Nuclear Regulatory Affairs at (201) 316-7955.
Sincerely, 9610070329 961001 PDR ADOCK 05000289 J. Knubel P PDR Vice President and Director, TMI I JK/DJD/ pip Attachments: Amdavit ofJ. II. Taylor y Amdavit of G. R. Bond s Exhibit A & B Of l c: Administrator, Region 1 NRC TMI Senior Resident inspector NRC Senior Project Manager, TMI
[Tl ( r tk, c h qr:M OmGn MLL P1. I /M8
i i
AFFIDAVIT OF JAMES H. TAYLOR A. My name is James H. Taylor. I am Manager of Licensing Services for Framatome Technologies, Inc. (FTI). Framatome Cogema Fuels is administratively responsible to Framatome Technologies, Inc. Therefore, I am authorized to execute this Affidavit.
B. I am familiar with the criteria applied by FTI to determine whether certain information of FTI is proprietary and I am familiar with the procedures established within FTI to ensure the proper application of these criteria.
C. In determining whether an FTI document is to be classified as proprietary information, an initial determination is made by the Unit Manager, who is responsible for originating the document, as to whether it falls within the criteria set forth in Paragraph D hereof. If the information falls within any one of these criteria, it is classified as proprietary by the originating Unit Manager.
This initial determination is reviewed by the cognizant Section Manager. If the document is designated as proprietary, it is reviewed again by Licensing personnel and other management within FTI as designated by the Manager of Licensing Services to assure that the regulatory j requirements of 10 CFR Section 2.790 are met.
D. The following information is provided to demonstrate that the provisions of 10 CFR Section 2.790 of the Commission's regulations have been considered:
(i) The information has been held in confidence by FTI. Copies of the document are clearly identified as proprietary. In addition, whenever FTI transmits the information to a customer, customer's agent, potential customer or regulatory agency, the l
transmittal requests the recipient to hold the information as proprietary. Also, in order to strictly limit any potential or actual customer's use of proprietary information, the substance of the following provision is included in all agreements entered into by FTI, and an equivalent version of the proprietary provision is included in all of FTI's proposals:
i
]
i i
AFFIDAVIT OF JAMES H. TAYLOR (Cont'd.)
4
] "Any proprietary information concerning Company's or its Supplier's products or manufacturing processes which is so designated by Company or
- its Suppliers and disclosed to Purchaser incident to the performance of such contract shall remain the property of Company or its Suppliers and is disclosed in confidence, and Purchaser shall not publish or otherwise disclose j it to others witt.out the written approval of Company, and no rights, implied
(-
or otherwise, are granted to produce or have produced any products or to j practice or cause to be practiced any manufacturing processes covered
{ thereby.
]
Notwithstanding the above, Purchaser may provide the NRC or any other
! regulatory agency with any such proprietary information as the NRC or such
- other agency may require; provided, however, that Purchaser shall first give l Company written notice of such proposed disclosure and Company shall have l the right to amend'such proprietary information so as to make it non-proprietary. In the event that Company cannot amend such proprietary f information, Purchaser shall, prior to disclosing such information, use its best
- efforts to obtain a commitment from NRC or such other agency to have such
, information withheld from public inspection.
1
! Company shall be given the right to participate in pursuit of such confidential
] treatment." !
I l
3 i ,
i i
i 2
4
?
AFFIDAVIT OF JAMES H. TAYLOR (Cont'd.)
(ii) The following criteria are customarily applied by FTI in a rational decision process j to determine whether the information should be classified as proprietary. Information may be classified as proprietary if one or more of the following criteria are met:
i
- a. Information reveals cost or price information, commercial strategies, I production capabilities, or budget levels of FTI, its customers or suppliers, i
i
- b. The information reveals data or material concerning FTI research or l development plans or programs of present or potential competitive advantage
! to FTI. ,
1 i l 1
- c. The use of the information by a competitor would decrease his expenditures, i in time or resources, in designing, producing or marketing a similar product.
j d. The information consists of test data or other similar data concerning a process, method or component, the application of which results in a competitive advantage to FTI.
4
- e. The information reveals special aspects of a process, method, component or
- the like, the exclusive use of which results in a competitive advantage to FTI.
- f. The information contains ideas for which patent protection may be sought.
The document (s) listed on Exhibit "A", which is attached hereto and made a part ;
hereof, has been evaluated in accordance with normal FTI procedures with respect ;
to classification and has been found to contain information which falls within one or 3
AFFIDAVIT OF JAMES H. TAYL.OR (Cont'd.)
more of the criteria enumerated above. Exhibit "B", which is attached hereto and made a part hereof, specifically identifies the criteria applicable to the document (s) listed in Exhibit "A".
(iii) The document (s) listed in Exhibit "A", which has been made available to the United States Nuclear Regulatory Commission was made available in confi<!ence with a request that the document (s) and the information contained therein be withheld from public disclosure.
(iv) The information is not available in the open literature and to the best of our knowledge is not known by Combustion Engineering, EXXON, General Electric, Westinghouse or other current or potential domestic or foreign competitors of Framatome Technologies, Inc. ,
(v) Specific information with regard to whether public disclosure of the information is likely to cause harm to the competitive position of FTI, taking into account the value of the information to FTI; the amount of effort or money expended by FTI developing the information; and the ease or difficulty with which the information could be properly duplicated by others is given in Exhibit "B".
E. I have ,:ersonally reviewed the document (s) listed on Exhibit "A" and have found that it is considered proprietary by FTI because it contains information which falls within one or more of thecriteria enumerated in Paragraph D, and it is information which is customarily held in confidence and protected as proprietary information by FTI. This report comprises information 4
l l
l l
AFFIDAVIT OF JAMES H. TAYLOR (Cont'd.) I
{
l utilized by FTI in its business which afford FTI an opportunity to obtain a competitive l
advantage over those who may wish to know or use the information contained in the document (s).
hVY AMES H. TAYLOR State of Virginia)
) SS. Lynchburg City of Lynchburg) l James H. Taylor, being duly sworn, on his oath deposes and says that he is the person who subscribed his name to the foregoing statement, and that the matters and facts set forth in the statement are true.
Arrab .
/ /&
7 MAMES H. TAYLOR l Subscribed and sworn before me this ISiay of 01m a 1996.
l Atwhr 6 . o euv Notary Public in and for the City of Lynchburg, State of Virginia.
My Commission Expires duly31. lM9 5
i
l AFFIDAVIT OF G. R. BOND A. My name is G. R. Bond. I am Manager of Nuclear Fuels for GPU Nuclear, Inc. (GPUN). l B. I am making this affidavit in conformance with the provisions of 10 CFR 2.790 of the ;
regulations of the Nuclear Regulatory Commission ("NRC") and in conjunction with GPUN's application for withholding which accompanies this affidavit.
1 C. I have knowledge of the criteria used by GPUN in designating information as proprietary or confidential. l D. Pursuant to the provisions of paragraph (b)(4) of 10 CFR 2.790, the following is furnished for consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld.
(i). The information sought to be withheld from public disclosure is either owned by GPUN or is information owned by Framatome Technologies, Inc. (FTI) for which GPUN is contractually obligated to protect from public disclosure, and has been held in confidence by GPUN and its consultants.
(ii). The proprietary information sought to be withheld is that which is contained in the proprietary version of the attached Topical Report TR-092P, Revision 0, dated l December 8,1995,"TMI-1 Reload Design and Setpoint Methodology," as indicated and omitted from the non-proprietary version, both of which were submitted to NRC via GPUN letter dated February 27,1996 (6710-96-2033).
(iii). The information is of a type that would customarily be held in confidence by l GPUN, portions of which GPUN is contractually obligated to protect from public l disclosure. The information consists of analysis methodology details, analysis results, cupporting data, and aspects of development programs, relative to a method of analysis that provides a competitive advantage to GPUN. Information may be classified as proprietary if one or more of the following cri'eria are met:
- a. Information reveals cost or price information, commercial strategies, production capabilities, or budget levels of GPUN, its customers or suppliers.
- b. The information reveals data or material concerning GPUN research or development plans or programs of present or potential competitive advantage to GPUN.
- c. The use of the information by a competitor would decrease his expenditures, in time or resources, in designing, producing or marketing a similar product.
1 71096309Aw
I 1
AFFIDAVIT OF G. R. BOND l I
(Continued)
- d. The information consists of test data or other similar data concerning a j process, method or component, the application of which results in a '
competitive advantage to GPUN. i 1
l
- e. The information reveals special aspects of a process, method, component or the like, the exclusive use of which results in a competitive advantage to GPUN.
- f. The information contains ideas for which patent protection may be sought.
l The document (s) listed on Exhibit "A", which is attached hereto and made a part j hereof, has been evaluated in accordance with normal GPUN procedures with l respect to classification and has been found to contain information which falls l within one or more of the criteria enumerated above. Exhibit "B", which is !
attached hereto and made a part hereof, specifically identifies the criteria applicable to the document (s) listed in Exhibit "A" l
(iv). The document (s) listed in Exhibit "A", which has been made available to the United States Nuclear hegulatory Commission was made avalisle in confidence with a request that the document (s) and the information contained therein be withheld from public disclosure.
(v). The information sought to be protected is nct available in public to the best of our knowledge and belief.
(vi). Specific information with regard to whether public disclosure of the information is likely to cause harm to the competitive position of GPUN, taking into account the value of the information to GPUN; the amount of effort or money expended by
, GPUN developing the information; and the ease or difficulty with which the information could be properly duplicated by others is given in Exhibit "B" E. I have personally reviewed the document (s) listed on Exhibit "A" and have found that it is considered proprietary by GPUN because it contains information which falls within one or more of the criteria enumerated in Paragraph D. Public disclosure of this information is likely to cause harm to GPUN because it would allow competitors in the nuclear industry to benefit from the results of a significant development program without requiring a commensurate expense or allowing GPUN to recoup a portion ofits expenditures or benefit from the sale of the information.
2 71096309 doc
l AFFIDAVIT OF G. R. BOND i (Continued) l l
l G. R. Bond, being duly sworn, on his oath deposes and says that he is the person who subscribed his name to the foregoing statement, and that the matters and facts set forth in the statement are true.
l
l Sworn to and subscribed before me this /3 day of 367 T 1996. Witness my h and official seal
/h ;
. . JUUENNE J. SCHOFFST/.
My comm.ission expires erany pinu in or ww .: -
MyCommission Emp6res Tutt)g 2y, F}9 f 3
71096309 &w