05000348/LER-1979-030, Forwards LER 79-030/03L-0

From kanterella
(Redirected from ML20125A931)
Jump to navigation Jump to search
Forwards LER 79-030/03L-0
ML20125A931
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/14/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20125A932 List:
References
NUDOCS 7908200311
Download: ML20125A931 (1)


LER-2079-030, Forwards LER 79-030/03L-0
Event date:
Report date:
3482079030R00 - NRC Website

text

' = - ... a e i

  • Mehema Posser C: ; T,-

t30 North 18th Street Poet Otace Boa 2641 8 rmmgham, Alesema 35291 Telephone 205 323-5341 hh%2Rii AlabamaPower en souten enc:nc sysen August 24, 1979 Docket No. 50-348 U. S. Nuclear Regulatory Couaission Office of Inspection & Enforcement Region II 101 Marietta Street, N. W.

Suite 3100 Atlanta, ".eorgia 30303 -

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1. Licensee Event Report No. LER 79-030/03L-0 is forwarded herewith with three (3) copies each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurrence.

If you have any questions, please advise.

Yours very truly.

.L la .

i FLCj r/ KAP /m::b i

Enclosure l

cc: Director, IE (30 copies)/

i Director, MIPC (3 copies) i d

1

- s 7908200 3//

l