ML20114A188

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1984
ML20114A188
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/30/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F128403, NUDOCS 8501250588
Download: ML20114A188 (5)


Text

.- - . . _ . . .. - -.. . _ . .

o .

. -* o I

OPERATING DATA REPORT DOCKETNO. 302 DATE 19/d/Ad__

COMPLETED sy D. Grana TELEPHONE Mm3802 OPERATING STATUS I. Unit Name: Crvatal River Unit 3 N*t**

2. Reporting Period: 11/1/84 - 11/30/84 i
3. Licensed ThermalPower(MWr): 2544
4. Nameplate Rating (Gross MWe): 290 S. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Grom MWe): 860
7. Maximum Dependable capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,1f Any (Not MWe): NA i
10. Reasons For Restrictions,if Any: NA This Month Yr..to Dete Cumulative
11. Hours in Reporting Feriod --

720 8040 67680

12. Number Of Hours Resctor Was Critical 597.5 _ -

7602.5 45171.7

13. Rasctor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 591.S 7554.8 44173.a
15. Unit Reserve Shutdown Hours _0 0 0
16. Gross Thermal Energy Generated (MWH) 1339092 17982310 99946645 .
17. Gross Electrical Energy Generated (MWH) 464806 , 6202404 34129140
18. Net Electrical Energy Generated (MWH) 441303 5910038

~

32427121

19. Unit Service Factor 82.2 % 94.0 % 85.3%
20. Unit Availability Factor 82.2 % 94.0 % 65.3%
21. Unit Capacity Factor (Using MDC Net) 74.7 % 89.5%

~

60.4 %

22. Unit capacity Factor (Using DER Net) -- 74.3 % 89.1 % 58.1 %
23. Unit Forced Outage Rare 0% 1.0% '

20.4 %

+ 24. Shutdowns Scheduled Over Nest 6 Months tType.Date.and Duration of Eacht:

__ Refueling outare scheduled to begin March 9,1985, and last 20 weeks.

28. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test 5:stus lPrior to Commercial Operation 1:

Forecast Achieved INITIAL CRITICALITY .

1/14/77 INITIAL ELECTRICITY _

1/30/77 7

8501250588 841130 PDR ADOCK 05000302 R PDR ggj773 1

(!

/


e-n,-

. ~ .. . . . . . . - - .

.. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 302 UNIT F LORP-3 __

DATg 12/4/84 _

COMPLETED BY D. Graham TELEPHONE --(904) 795-3802

)

MONTy November 1984 -_

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe. Net)

I 753 ggg 37 __

2 780 is _

812 3 338 795 1, _

4 __

369 805 20 5 73 21 798 6 0 '

22 808 h.s 7 0 23 -

789 s 0 24 808 9 0 808 25

10 182 805 26 II -

760 27 798 12 A14 28 A03 13 808

  • 2, 795
14 873 30 -

803 15 816 3, __

16 813 l

l l

INSTRUCTIONS On this format. list the serage daily unit power leselin MWe. Net for each day in the repiirting month. Compu the nearest whole megawatt, 193771 w .,n , - . - , . .

WO2 **

UNITSHUTDOWNS ANDFOWER REDUCDONS WRT NO.

UNIT NAME -FLCR P-3 ,

DATE 12/4/84 REPORT afDNTH 11/84 00hrLETED BY S. A. Stewart TELEFIGOFE (904) 795-3802

-, 5E 3 $ Exensee h Cause & Gwiective

. Dene

[- 35 i 155 Everit y gO~$ Actism sie b

$E E 5 g =g Repose a mO u

o Presens Recurrence o

-30 11/2/84 F 0.0 A 5 NA RB CRDRVE Control Rod dropped into core auto-matically. Plant operated at reduced q power.

-31 11/5/84 S 128.5 B 1 NA RB CRDRVE Shutdown to replace the control rod drive stator.

-32 11/14/84 F 0.0 A , 5 NA RB CRDRVE High control rod stator temperature.

l i 3 4 Ftweed Reasua: heetiuml; Exhsist G. Instemnnes Sciminled A li imponent t Failuse(Emplain) I4Eanual few Pseparatiant of Dass 548mietermace niTest 2-Manual Sceasi. Emisy Sheets few Licensee C-Refuchag 3 Ausonnalec Sciasm. Event Repswa ILER)FileiNURIG-D-Regulasory Resirietiun 4Osbe:(Explasn) 0161i E4pesatar Training & tiense Exasninacite F-Adsunistridive 5 G4perational Ereig (Emplain) I~xksing I . Sanw Source

1) llosher(Emplain)

G

e MONTHLY OPERATIONAL SUNNARY STATEMENT DOCKET No. 50-302 UNIT PLCRP-3 l

DATE 12/4/84 i

COMPLETED BY 8. A. Stewart TELEPHONE (904) 795-3802 MONTH November 1984

SUMMARY

STATEMENT: The plant operated with one outage during the month to repair a control rod drive stator and two periods of reduced power to satisfy Technical Specifications for dropped rod occurrences. The plant was limited to 95%

power throughout the month by steam generator levellimits.

1 e

e l

l

408 Disraza' mon A .M. Sell DF39 J. H. stone w d AFC W. L. Reetfeld NUJ3 (j  :

C E'i ** "" '

V 3

R 2:2"

5. L. Celffin 2,

A4B <

  • * .' M. How d 33 YI*u'*.u.*.'*' N$
o. c. ooe,e m

. e H9 w=-

K. R. Tileen NUJ)

December 7,1984 3P1284-03 g,wu ,,, g,

n. saw or en:y) NRC '

A. Osfi AIP 3.Pasher N5AC/EPR A. N11sei Calytic Mr. R! chard C. DeYoung, Director *

!.' E;E,'L" Bi'r Office of Inspection and Enforcement L. D. Greer NUs U.S. Nuclear Regulatory Commission S. N.ph.n. $a*w Attn: Document Control Desk R. E. Naw cow Washington, DC 20333

Subject:

Crystal River Unit 3 Docket No.30-302 Operating License No. DPR-72 Monthly Operating Report

Dear Slr:

( Attached are twelve (12) copies of the Crystal River Unit 3 November 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, t o G. R. Westafer [

Manager. Nuclear Operations Licensing and Puel Management .

AEP/feb Attachments cct Mr. J. P. O'Reilly Reglonal Administrator, Region !!

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission g], -

101 Marletta Street N.W., Suite 2900 i l Atlanta, GA 30323 isaL 87 estou** * ,he O C ca s e s, e e , m,c s m, m,,,_,, ,... ,. .s , e ,,. . m , .e.-.,, . i ,io. m,- m--sm