ML20099L625

From kanterella
Jump to navigation Jump to search
Forwards Limerick Generating Station Units 1 & 2 Annual 10CFR50.59 & Commitment Rev Rept for 940701 - 950630
ML20099L625
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/29/1995
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099L628 List:
References
NUDOCS 9601020199
Download: ML20099L625 (1)


Text

_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Robtrl W. Egyce

. . Plant Manager

, i. Limerick Generating Station PECO ENERGY "= e~ c -

Limerick Generating Station PO Box 2300 Sanatoga, PA 19464-0920 215 3271200 Ext. 2000 December 29, 1995 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nucl_U Regulatory Commission Attn: Do- .ient Control Desk washingtor., DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Annual 10CFR50.59 and Commitment Revision Report for the period July 1, 1994 through June 30, 1995 Attached is the Annual 10CFR50.59 Report as required by 10CFR50.59(b). Additionally, this report provides a summary of revisions to commitments previously made to the NRC as recommended in the NEI Commitment Management Guideline.  ;

If you have any questions or require additional information, please contact us.

Sincerely, 5Db Dbu-DBN:bdd cc: T. T. Martin, Administrator Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector, LGS E

020079 9601020199 951229 r g

PDR R

ADOCK 05000352 PDR Il

. _ _ _ _ _ _ _ _