Applicant Exhibit A-105,consisting of 791031 Response to Violations Noted in Insp Repts 50-352/79-07 & 50-353/79-07 on 790705,06 & 09.Repair Work for Both Pipe Restraints Will Be Completed by 841116
ML20099H164
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/07/1984
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
OL-A-105, NUDOCS 8411280048
Download: ML20099H164 (4)


Text

]gL -4 APPL E-

...l@[ '

" . , ,, -):

'. ' E[

f.t,,s _ s tr' ' i' .

lh gig g jgg4 p '

EE.' h

(~ .

coCzETmc &

x' q. SUMCE ERANCH SECY-NEC g

'O

/ %s \

2\

l'r.,Poyce Grier, 'lir e c t o r United Sta tes !?uclen: "crulstory Con icsion Office.of-I*.spection.ond : pre recec= t , -egion I 631 Terk Avenus' King of Frussia, PA l 'i 4 P 6

Subject:

U S 'iRC IT "crien I Letrer dated Septenber 27, 1979 R T. : Site Instiec tions oi ' July 5, 6 and 9,'1979 Inspection enort !* o . 50-352/79-07 L 333/79-07 Lit erick Ccncrating Station - f.' nits 1.and 2 File e- QUAL 1-2-2-1 (332/79-07)

- 7, _ 7: ctAL_1-2-A.2_033/79-07)

Des: lir. Grier:

I, .

In responce to the s u'o ,! c e t letter recstdinc itens fdentified durin;; the subject icureetide cf con:truction activities ruthorized

(: b y ;;'.'.C Li c ens e lie s . CTFP-100 end -10 7, t c t ra n si-i t herewith thd f ollowin;;:

Attachae.nt I - ! ccponec to Ap p endi:: A Should you have'acy questions cencerning these items, we I

would'be pleased to discuss tb'en with you.

f l Sincerely, . .

W Y j /1 f,_ga p;& RJL/gre

/' Mr'

'[ j v Ateach=ent t-bec:

  • R. H. Elias, Sechtel .
i. E. R. Klossin, Bechtel i

J. S. Kemper E. J. Bradley.

G. White E. C. Kistner H. R. Walters/Lecal File (2} ,

/ J. J. Clarey l O R. A. Mulford I

~

.l M M. Corcoran 8411280048 840507 D. ,Aarano PDR ADOCK 05000352 G ~.

  • f R. H. :' on g PDR ~~~~

l Project File (2) .

. ,7 1 Attachean: I

, s; .

- , Resoonse^te Areendix A h r- - ... .

V '-

! tem ef Noncereliance A-

[C Infrac: ion

.Appandix.3.of-10CFR30, cri:erion V, states, in-par::

'" Activities affecting quality... shall be acconplished in accordance with these instrue: ions, procedures or drawings."

The Limerick PSAR, Appendix D, Quality Assurance Progra=,

Paragraph D.6.4, s'tates, in part, : hat: Bechtel Construe: ion Department... is responsible for construe: ion of the plant to approved engineering specifications, drawings, and procedures..."

Sechtel.Powe$ Corporation Project Special Provision Procedure C-6.1, Revision 2, states in Section 4.4,

" Engineering changes which effect compla:ed work that requires further construction, shall have a new inspection record initiated by construction QC. The new. inspection-record is developed to cover the inspection of the work

~

required to accomplish the engineering change."

Contrary'to the above, as of July 6, 1979, a' Field Design i , .

Change Notice No. 5 to Design Drawing C-292 effected the completed and QC accepted weld joint ~on a pipe restraint,

.({') identified as PR-9. A new inspection' record was not developed f' to cover the inspec: ion of the work required to acco=plish E -' the engineering change. As a result, the. work required'by the engineering change was not accomplished on PR-9.

Resoonse to Infraction A Bechtel Quality Control inspected .PR-9 and the nonconforming conditions were documented-for Engineering disposition.

Project Engineering dispositioned the nonconfor=ing conditions by specifying a rep, air procedure that will meet specification and structural design requriscents.

[-

Subsequently, Quality Control re-inspected all restraints affected by Field Design Change Notice No. 5 to Dws. C-292

and identified similar conditions on pipe rest sin
PR-45.

The same repair procedure as above was specified by ?rojec:

Engineering.

Repair werk'for both pipe restraints will be completed by-November 16, 1979.

Development of corrective action to preclude recurrence is in progress and wil.'. be fully imple=ented by January 1, 1980.

I 1/2

-- ,. 50-352/79-07 '

50'353/79-07

% '*p

.t.

e.  ; t e.'
n ce= of
:encenelianca 3 O a~ ^* '

Infraction em e A) Appeddix S of 10CFR50, Cri:erion V, sea:es, in.part:

^.I.

L

'"Ac:ivities affec:ing cuali:y... shall'be acce=plished'in accordance wi:h these ins::ue: tons, procedures cr drawings."

The Li=erick ?SAR, Appendix 3, Quality Assurance Progra=,

-Paragraph D.6.4,.sta:es, in part, : hat: "Sech:el Construction Departmen:... is responsible for construe: ion of the plant to approved engineering specifications, drawings, and -

procedures..."

Bechtel-Prisary' Containment Specification C2 (Revision 9),

Section 10 .~ 1.14 , applies :o temporary bracke:s among other things, and states that: " Preheat at~ 20 Co F.minimu= shall be applied to-all. carbon steel seams'whose thickness exceeds

~

1-1/4"'regardless of a:bient temperature."

Contrary to the above, as of July 6, 1979,. temporary brackets were welded at several locations on the liner plate, where the place thickness was 1-1/2 inches, and no preheat was applied.

~

Response to Infraction 3 Weld documentation (WR-NC-1 Forms) has been reconstructed fro =

existing Quality Control records of the subject welds to the g(~ containmen: liner place. The documentation and control forms *-

\) ,..

(WR-NC-1) have been fastened to the temporary attachments. For

( ;.

.these temporary attachments WR-NC-1 requires a visual examination-i and a~ dye penetrant test of the affected base metal-after the removal of the temporary attachments. This dye penetrant test will' assure that any indications resulting from the lack of preheat

  • will be discovered and dispositioned. ,

As a matter ~of-interest, Weld Request (WR) Forms and Wald Filler Metal Authori:ation (WR-NC-2). Forms existed for the subject vsids and show that the welding was performed by qualified welders.

Additionally, a letter of instruction was issued to require l

L-Quality Control Inspection / Records to be issued. prior to performing temporary attachment welding to the containment liner.- This will I ' insure compliance with specified requirements such as preheat L

prior to welding.

1 t

l I 2/2 i

' . 50-352/79-07

- 50-353/79-07 O(_-

t a

cs_. . . .

l

% e

- . _ - . . _ -