Text
g
=-
H) 9. ;.,
M -35 l hmes J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 Vice President '-
Engineering and Construction August 16, 1984 Dr. Thomas E. Murley, Administrator U.
S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Dr. Murley:
POTENTIAL CONSTRUCTION DEFICIENCY G. H. BETTIS HVAC DAMPER ACTUATORS HOPE CREEK GENERATING STATION On May 3,1984, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr.
E.
C.
McCabe, advising of a potentially significant construction deficiency concerning four (4) actuators manufactured by G. H. Bettis and installed on HVAC dampers supplied by American Warming and Ventilating, Inc.
On June 1, 1984, an interim report was sent to your office.
The following information is provided in accordance with 10CFR50.55(e).
Our Architect / Engineer and Constructor, Bechtel, has evaluated the reported condition to determine its potential effect on safe operation of the plant.
It was determined that the affected dampers are to be installed in the Reactor Building Filtration, Recirculation and Ventilating System (FRVS) and the Containment Prepurge Clean-up System (CPCS).
In operation, the dampers are normally closed and would fail closed.
Since the dampers are used only for FRVS testing or drywell purge, they are only operated manually under administrative control.
All of the danipers are provided with position switches and pilot lights to indicate the full open or closed position.
The plant operator would be alerted to a problem with abnormal damper operating time or failure to achieve full open or closed position by observing the damper position pilot lights.
Oh
~
As
/C A f
q c 'e. : i..
e i
.Dr..T.
E. Murley 2.
8/16/84 Based on the above evaluation, we have determined that, had the deficiency gone undetected and. uncorrected, it would not have adversely -affected safe operation of the plant.
-We, therefore, withdraw this ' item as not reportable in accordance with 10CFR50.55(e).
Very-truly yours, C Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.
C.
20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l
.