Revised Monthly Operating Rept for Oct 1991 for Hope Creek Unit 1,correcting Typo Contained in Gross Electrical Energy Generated
ML20094E283
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/31/1991
From: Zabielski V
Public Service Enterprise Group
To:
Shared Package
ML20094E260 List:
References
NUDOCS 9201230054
Download: ML20094E283 (1)


Text

. ..

. . - ~ . _ - - .-

e OPERATING DATA REPORT DOCKET-NO. 50-354 UNIT HoDe Creek DATE 1/15/92 COMPLETED BY V. Zabiglski .

TELEPHONE (609) 339-3506

OPERATING STATUS 1._ Reporting Period October 1991 Gross Hours in Report Period 211 3293
2. . Currently Authorized Power Level (MWt)

Max. Depend. Capacity (MWe-Net) 1911 Design Electrical Rating (MWe-Net) 1067

3. Power Level to which restricted (if any) (MWe-Net) None 4.- Reasons-for restriction (if any)

This Yr To Month Qate Cumulative

5. No. of-hours reactor was critical 745.0 5915.8 35.697.3

-6. Reactor reserve shutdown hours 22a 222 929

7. Hours _ generator on line ,

745.0 5817.5 35.110.6

8. Unit reserve shutdown hours 2A2 DAA 222
9. Gross thermal energy generated 2.459.202 18.846.500 111.388.907 (MWH) 10.. Gross electrical energy 814.760 6.200,361 36.822.034 generated-(MWH) l
11. Net electrical energy generated 780.535 5.926.488 35.185.172

.(MWH) la. Reactor service factor 100.0 81.1 83.7 13.-Reactor availability factor 1R222 81.1 83.7

14. Unit-service factor 100'0. 79.7 82.3  ;
15. Unit availability factor 100.0 79.7. 82.3  !
16. Unit capacity factor (using-MDC) 101.6 lE&R 80.0 I17. Unit capacity factor 98.2 76.1 77.3 (Using Design MWe) 18.-Unit' forced outage rate 92A 52A 521
19. Shutdowns scheduled over next 6 months (type, date, & duration):

None ,

30. If shutdown at end of report. period, estimated date of start-up: )

N/A o 01:30054 ?20115, 3