Forwards Master Equipment Lists & Equipment Qualification Rept Status & Schedule List to Support 840813 Onsite Audits by Sqrt & Pump & Valve Operability Review Team.W/O Encls
ML20091J865
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/29/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8406060231
Download: ML20091J865 (2)


Text

O r  : PinMp i < ,' s.

t: ,

D:o n u (s o '. n. a  !

m n'. o " (s ! .'

ii u ' s

, l l

P.O. box 5000 - CLEVELAND. oHlo 44101 - TEL FPHONE (216) (22-9800 - ILLUMINATING BLDG. - 55 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR May 29, 1984 PY-CEI/NRR-0116 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant, Units 1 & 2 Docket Nos. 50-440; 50-441 Information For Seismic Review Team and Pump and Valve Operability '

. Review Team Audits

Dear Mr. Youngblood:

In our April 5, 1984 letter, (PY-CEl/NRR-0104 L), we requested that ::he on-site audits by the Seismic Qualification Review Team (SQRT) and the Pump and Valve Operability Review Team (PVORT) be scheduled for the week of August 13, 1984.

To support that audit date, the following information is being provided to the NRC Equipment Qualification Branch reviewer.

2) Master equipment lists sorted by equipment number and procurement
specification.

(4) Equipment qualification report status and schedule lists for the NSSS and balance of plant equipment specifications, for both operability and seismic qualification.

As previously committed, the equipment installation status as of May 18, 1984 .

is shown on the master equipment lists. Those items highlighted reflect the equipment which meets the installation acceptance criteria except for status of specific hangers for associated equipment. Pipe hanger installation is reported on a bulk basis and is presently 85% complete.

0406060231 840529 '[

PDR ADOCK 05000440 A pop h6

Mr. B. J. Youngblood May 21, 1984 We hope this information assists you in your selection of equipment and preparation for the audits. If you have questions, please contact us.

Very truly yours,

' Y fk Murray R. Edelman Vice Presidant Nuclear Group MRE
nje Attachments cc: G. Bagchi with attachments Jay Silberg, Esq.