Proposed Tech Specs Surveillance 4.7.2.1.h Re Control Room Emergency Filtration Sys Duct in-leakage Testing & InspML20091E784 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
11/14/1991 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20091E774 |
List: |
---|
References |
---|
NUDOCS 9111210325 |
Download: ML20091E784 (6) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] |
Text
- -
= _.
a, from DECO to the Director of Regulation, dated August 13, 1971, arid the letter from Richard W. McLaren, Assistant Attorney General, Antitrust Division, U. S. Department of Justice, to
. Bertram H. Schur,-. Associate General: Counsel, Atomic Energy Commission, dated August 16, 1971.
(4)
Safetv/Reliqf Valve In-Plant Testina (Section 3.8.1. SSER #5)*
Prior to completing the startup test program, Deco shall perforu a series of in-plant tests of the safety / relief valves (SRVs),
The acceptance criteria for these tests are contained in Section 2.13.9, "SRV Load Assessment by In-Plant Tests" of NUREG 0661, "NRC Acceptance Criteria for the Marx I Containment Long-Term Program." The results of these tests shall be reported to the NRC staff within six months of completing this test series.
(5) 31!npression Pool Temperatureligasurements (Section 3.8.1. SSER #51 Deco shall accomplish during the first fuel cycle, all the tasks described in its letter dated March 6, 1985, regarding the series of SRV tests which will confirm its methodology for measuring the suppression pool bulk temperature.
(6)
Environmental Qualification (Sectign_3dL_SSER #El No later than November 30, 1985, Deco shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49.
(7)
Deleted i
l i
l l
i I
i
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.
FERMI - UNIT 2 Amendment No.
9111210325 911114 PDR -ADOCK 05000341 P
_PDR
~-
g.
JMll UST OF _ TABLES (Continued)
IMLL PEE 3.3.7.9-1 DELETED..........................................
3/4 3-68 3.3.7.11-1 RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION..................................
3/4 3-72 4.3.7.11-l' RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS........
3/4 3-74 3.3.7.12-1 RADIOACTIVE GASE0US EFFLUENT MONITORING INSTRUMENTATION..................................
3/4 3-77 4.3.7.12-1 RADI0 ACTIVE GASE0US EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS........
3/4 3-81 3.3.9-1 FEEDWATER/ MAIN TURBINE TRIP SYSTEM ACTUATION INSTRUMENTATION..................................
3/4 3-87 3.3.9-2 FEEDWATER/ MAIN TURBINE TRIP SYSTEM ACTUATION INSTRUMtNTATION SETP0lNTS........................
3/4 3-88 4.3.9.1-1 FEEDWATER/ MAIN TURBINE TRIP SYSTEM ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........
3/4 3-89 3.3.11-1 APPENDIX R ALTERNATIVE SHUTDOWN INSTRUMENTATION..
3/4 3-91 4.3.11.1-1 APPENDIX R ALTERNATIVE SHUlDOWN INSTRUMENTATION SURVEILLANCE REQUIREMENTS........
3/4 3 92 3.4.3.2-1 REACTOR COOLANT SYSTEM PRESSURE ISOLATION VALVES...........................................
3/4 4-12 3.4.3.2-2 REACTOR COOLANT SYSTEM INTERFACE VALVES LEAKAGE PRESSURE MONITORS.............
3/4 4-12 3.4.4-1 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS..........
3/4 4 15 4.4.5-1 PRIMARY COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PR0 GRAM.................................
3/4 4-18 4. 4. 6.1 -. 3 - 1 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM--
WITHDRAWAL SCHEDULE..............................
3/4 4-22 4.6.1.1-1 PRIMARY CONTAINMENT ISOLATION VALVES / FLANGES LOCATED IN LOCKED HIGH RADIATION AREAS...........
3/4 6-lb 3.6.3-1 PRIMARY CON 1AINMENT-ISOLATION VALVES.............
3/4 6-22 3.6.5.2-1 SECONDARY CONTAINMENT VENTILATION SYSTEM AUTOMATIC ISOLATION DAMPERS......................
3/4 6-53 4.7.2.1-1 CONTROL ROOM EMERGENCY FILTRATION SYSTEM OUCT LEAK TESTING SURVEILLANCE REQUIREMENTS...........
3/4 7-10b 3.7.3-1 SURVEY POINTS FOR SHORE BARRIER..................
3/4 7-12 3.7.7.5-1 DELETED..........................................
3/4 7-32 3.7.7.6-1 DELETED..........................................
3/4 7-37 4.8.1.1.2-1 DIESEL GENERATOR TEST SCHEDULE...................
3/4 8-8 FERMI - UNIT 2 xxiv Amendment No. f9,E9,E/,
PLANT SYSTEMS SURVEILLANCE RE0VIREMENTS 4.7.P.1 The control room emergency filtration system shall be demonstrated l
OPERABLE:
a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to 95*F.
b.
At least once per 31 days by:
1.
Initiating fan operation from the control room with ecch subsystem, establishing flow for at least 15 minutes through the HEPA filters and charcoal adsorbers.
2.
Verifying flow through the HEPA filters and charcoal adsorbers for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the associated emergency makeup inlet air heater OPERABLE. The subsystem used to establish the 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> of flow through the HEPA filters and charcoal adsorbers shall be staggered such that each subsystem is utilized at least once per 62 days, c.
At least once per 18 months or (1) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire, or chemical release in any ventilation zone communicating with the system by:
1.
Verifying that the system satisfies the in-place penetration testing acceptance criteria of less than 1.0% and uses the test procedure guidance in Regulatory Positions C.5.a, C.S.c, and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978, while operating the system at a flow rate of 1800 cfm i 10% through the makeup filter and 3000 cfm i 10% through the recirculation filter.
2.
Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978, for a methyl iodide penetration of less than 1.0%; and 3.
Verifying a system flow rate of 3000 cfm i 10% during system operation when tested in accordance with ANSI N510-1980.
d.
Af ter every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978, for a methyl l
iodide penetration of less than 1.0%.
FERMI - UNIT 2 3/4 7-9 Amendment No.
l-
PJANT SYSTfilS SURVEILLANCE REQUIREMENTS (Continued) e.
At least once per 18 months by:
1.
Verifying that the pressure drop across the recirculation train and across the makeup train combined HEPA filters and charcoal adsorber banks is less than 8 inches and 6 inches water gauge respectively while operating the system at a flow rate of 3000 cfm 3 10% through the recirculation filter train and 1800 cfm i 10% through the makeup filter train.
2.
Verifying that the system will automatically switch to the recirculatior, mode of operation on each of the below actuation test signals and verifying that on any one of the below recirculation mode actuation test signals, the system automatically switches to the recirculation mode of operation, the isolation valves close within 5 seconds and the control room is maintained at a positive pressure of at least 0.125 inch water gauge relative to the outside atmosphere during system operation at a flow rate less than or equal to 1800 cfm through the emergency makeup air filter:
a)
Control center inlet radiation monitor.
b)
Fuel pool ventilation exhaust radiation monitor.
l c)
Low reactor water level.
d)
High drywell pressure.
3.
Verifying that on-the chlorine mode actuation signal, the system automatically switches to the chlorine mode of operation, the isolation valves close within 4 seconds, and a minimum of 1200 cfm emergency recirculation is established.
4.
Verifying that each of the emergency makeup inlet air heaters dissipate 12.0 i 2.0 kW when tested in accordance with ANSI N510-1980.
f.
After each complete or partial replacement of a train llEPA filter bank by verifying that the train HEPA filter bank satisfies the inplace penetration and bypass leakage testing acceptance criteria
.of less than 1.0% in accordance with ANSI N510-1980 while operating the system at a flow rate of 1800 cfm t 10% for the makeup train and 3000 cfm i 10% for the recirculation train.
g.
After each complete or partial replacement of a train charcoal adsorber bank by verifying that the train charcoal adsorber bank satisfies the inplace penetration and bypass leakage testing acceptance criteria of less than 1.0% in accordance with ANSI N510-1980 for a halogenated hydrocarbon refrigerant test gas while operating the system at a flow rate of 1800 cfm i 10% for the makeup train and 3000 cfm i 10% for the recirculation train.
FERMI - UNIT 2 3/4 7-10 Amendment No. 7,
~-
PLAf;T SYSTEMS SyV1VEll{ANCEREQUIREMENTS(Continued)
- h. -
At least once per 36 months by verifying that the sections of-Control Room Emergency Filtration System duct listed in Table-4.7.2,1-1, when leak tested in accordance with ASME N510-19898 exhibit inleakage less than the acceptance criteria listed in Table 4.7.2-1-1 for the associated pressures.
4.7.2.2 The portions of the Contral_ Room Emergency filtration System duct listed below, which are accessible during normal operation, shall be visually e
inspected at least once.per 366 days for cracking, debonding, or other abnormal degradation of the applied silicone sealant. Any such cracking, debonding, or other abnormal degradation shall be reported in accordance-with Specification 6.9.2 within 14 days in a Special Report describing the findings and giving the intended course of action, including evaluation of and-justification for continued plant operation, j
a.
- Normal intake between damper T4100F042 and the Control Room wall (Penetration V-430) b',
Normal exhaust-between damper T4100F044 and the Control Room wall (PenetrationV429) c.
Discharge of recirculation fans 14100C047, 48 between the discharge flanges on filter train T4100D016 and the 5th Floor CCHVAC Equipment Room wall (Penetration V-5048) d.
Division II supply plenum between the Control Room wall (Penetration V-431)~and the 4th Floor Aux Building ceiling (Penetration V-9014) e.
Emergency intake between the discharge flange on filter train T4100D0ll _ and the inlet flange on filter train T41000016 I
f.
Recirculation duct between the 5th Floor CCHVAC Equipment Room wall (Penetration V-504A) and the inlet flange on-filter train T41000016 l
L u
- ests performed in accordance with ANSI N510-1980 prior to the implementation j
L T
of this requirement satisfy this requirement until the next required performance of the test.
FERMI - UNIT 2 3/4 7-10a Amendment No.
l
l P
TABLE'4.7.2.1-1 CONTROL ROOM EMERGEf1CY FILTRATION SYSTEM DUCT LEAK TESTING SURVEILLAfiCE REQUIREMENTS E
DUCTS p
1.
Normal intake between damper T4100F042 and the Control Room wall (Penetration V-430) 2.
Normal exhaust between damper T4100F044 and the Control Room wall (Penetration V-429) 3.
Discharge of recirculation fans T4100C047, 48 between the discharge flanges on filter train T41000016 and the 5th Floor CCHVAC Equipment Room wall (Penetration V-504B) 4.
Division II supply plenum between the Control Room wall (Penetration V-431) and the 4th Floor Aux.
j
~
g Building ceiling (Penetration V-9014) er Leakage Determined at Maximum Leakage Determined at Maximum Negative Pressure Expected For Negative Pressure Expected For Each Specific Duct During Each Specific Duct During Operation Acceptance Criteria flormal System Operation tlith a Single Darper Failure E
k Cumulative Total for g
all four ducts (SCFM) 11 34 E
E
.