Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be PerformedML20199H241 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
01/28/1998 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20199G181 |
List: |
---|
References |
---|
NUDOCS 9802040450 |
Download: ML20199H241 (7) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] |
Text
-
- to NRC 98 0008 ENCLOSURE 3 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NPF-43 REQUEST TO REVISE TECilNICAL SPECIFICATIONS TECliNICAI, SPECIFICATION CliANGE Attached is a mark up of the existlag Technical Specifications (TSs), indicating the proposed changes (Part 1) and a typed version of the TSs incorporating the proposed changes with a list ofincluded pages (Part 2).
9002040450 990128 PDR ADOCK 05000341 P
PDR m
' to NRC-98 0008 Page 2 ENCLOSURE 3 - PART I PROPOSED TECliNICAL SPECIFICA TION PAGE MARK UP
)
o-DFFINITIONS
[
e TABLF 1.2 OPTRATIONAL CONDITf0NS MODE SW17CH AVERAGE REACTOR CONDITION P05fTION COOLANT TEMPERATU E i
'. POWER OPERATION Run Any temperature 2,
STARTUP Startup/ Hot Standby Any temperat're u
3.
HDT SH' TDOWN Shutdown' "
> 200* F 4.
C01.D SHIJTDOWN Shutdown','I,*"
s 200' F "**
5.
REFUELINt*
Shutdown or Refuel",#
s 140' F i
i
'The reactor mode switch may be placed in the Run. Startup/ Hot S Refuel position to test the switch interlock functions and related instrumentation provideo that the control rods are verified to remain f inserteesby a second licensed operator or other technically qualified me i
(
of the unit technical staff.
88 control rod trive is being removed from the reacto Specification 3.9.10.1.
4
- Fuel in the reactor vessel with the vessel head closure bolts less t ten:ioned or with the head removed.
"See Special Test Exceptions 3.10.] and 3.10.3.
""Tne reactor mode switch may be placed in the Refuel position while centrol rod is being recoupled or withdrawn provided that the one-rod-out l
interlock is OPERABLE.
'"'See Special Test Excepiton 3.1c.7.
in core, ell.s confarniy one of !"M N 'l O"" N"'
FERMI - UNIT 2 j.10 4 -
Amendment No. JE. 114 11/20/97
.W y
REFUELING OPERATIONS
~
SURVE!LLANCE REQUIREMENTS 4.9.1.1 The reactor mode' switch shall be verified to be locked in the Shutdown or Refuel position as specified:
Within 2, hours prior to:
a.
1.
SednningCOREALTERATIONS,and l
2.
Resuring CORE ALTERATIONS when the reactor mode switch has been unlocked.
b.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
l Each of the above required reactor mode switch Refuel position
- 4. 9.1. 2 interlocks" shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the start of and at least once per 7 days during control rod withdrawal or CORE ALTERATIONS, as applicable.
Each of the above required reactor mode' switch Refuel position 4.9.1.3 interlocks" thrc. is affected shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL 1EST prior to resuming control rod withdrawal or CORE ALTERATIONS, as applicable', following repair, maintenance or replacement of any component that could affect the Refuel position interlock.
d The reactor mode switch may be'placed in the Run or Startup/ Hot Standby a
position to test the switch interlock functions provided that all control s-rods are verified to remain fully insertedsby a second Itcensed operator or
(;
other technically qualified member of tne' unit technical staff.
fuel a.uem4/.es, in c ore-calls c on h o />,,3, o n e.
w more-FERMI - UNIT 2 3/4 9-2
NRL 98 000F Page 3 ENCLOSURE 3 - PART 2 PROPOSED TECIINIC A.L SPECIFICATION REVISED PAGES INCLUDED PAGl@
l-10 3/492
4 DEFINITIONS TABLE 1.2 OPERATIONAL CONDITIONS MODE SWITCH AVERAGE REACTOR CONDITION POSITION _i COOLANT TEMPERATURE 1.
POWER OPERATION Run Any temperature 2.;STARTUP Startup/HotStandby Any temperature 8
3.
HOT SHUTDOWN Shutdown,***
> 200* F E4.- COLD SHUTDOWN Shutdown,88,***
s 200' F****
8 5.
REFUELING
- Shutdown or Refuel **,8 s 140' F 8The reactor mode switch may be placed in the Run, Startim/90t Standby, or Refuel position to test the switch interlock functions and related instrun.entation provided that the control rods are verified to remain fully inserted in core cells containing one or more fuel assemblies by a second l
licensed operator or other technically qualified member of the unit technical staff.
88The reactor mode switch may be placed in the Refuel position while a single l
control rod drive is-being removed from-the reactor pressure vessel per Specification 3.9.10.1.
- Fuel in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.
- See Special Test Exceptions 3.10.1 and 3.10.3.
- The reactor mode switch may be placed in the Refuel position while a single contrril rod is being recouplea or withdrawn provided that the one-rod-out interlock is OPERABLE.
- See Special-Test. Exception 3.10.7.
-FERMI - UNIT 2-1-10 Amendment No. JJ, JJJ
0 REFUELING OPERATIONS 31VIILLMCf_EIMIRBENTS 4.9.1.1 The reactor mode switch shall be verified to be locked in the Shutdown or Refuel position as specified:
a.
Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prior to:
1.
Beginning CORE ALTERATIONS, and 2.
Resuming CORE ALTERATIONS when the reactor mode switch has been unlocked.
b.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.9.1.2 Each of the above required reactor mode switch Refuel position interlocks
- shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior.to the start of and at least once per 7 days during control rod withdrawal or CORE ALTERATIONS, as applicable.
4.9.1.3 Each of the above required reactor mode switch Refuel position interlocks
- that is affected shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST prior to resuming control rod withdrawal or CORE ALTERATIONS, as applicable, following repair, maintenance or replacement of any component that could affect the Refuel position interlock,
- -The-reactor mode switch may be placed in the Run or Startup/ Hot Standby position to test the' switch interlock functions provided that all control rods are verified to remain fully inserted in core cells containing one or more fuel assemblies by a second licensed operator or other technically
_ qualified member of the unit technical staff.
-FERMI - UNIT 2
'3/49-2 Amendment No.
w ~