Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] |
Text
. _ _ - _ _ - - _ _ - _ _ _ _ _ _ _ _ _ _ _
Enclosur: 3 NRC-98-0002 Page1 ENCLOSURE 3 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NPF-43 REQUEST TO REVISE 'l ECilNICAL SPECIFICATIONS:
TECilNICAL SPECIFICATION CII ANGE
\\
)
[
Attached is a mark-up of the existing Technical Specifications, indicating the l
proposed cha.,ges (Part 1) and a typed version of the TSs incorporating the proposed changes with a list ofincluded pages (Part 2).
'l r
9802040443 900128 PDR AlsOCK 05000341 p
PDR 4
k
I NitC-98-0002 Page 2 4
ENCLOSURE 3-PART1 PROPOSED TECilNICAL SPECIFICATION P/.GE MAllK-UP O
(
n',
4
E L?iRICAL POWEP SYSTfw!
3 /4. 2. 2 0.C. SOURCES O.C. COURCES OPE 9aTING 4
LIMITING CONDITf0N FOR OproattoN 3.8.2.1 As a minimur., the following D.C. electrical power sources shall be OPERABLE:
a.
Diviaton 1, consisting of:
1.
130 VDC Battery 2A 1.
2.
130 VDC Battery 2A 2.
3.
Two 130 VDC full capacity chargers.
b.
Division 11, consisting of:
1.
130 VDC Cattary 281.
2.
130 VDC Battery 28-2.
3.
Two 130 VDC full capacity chargers.
APPtitABIL1TY:
OPERATIONAL CDNDITIONS 1, 2, and 3.
ACTtDN:
With a battery charger in eithtr Division I or Division II of the atove n.
D.C. ske'.rical power sources inoperable, restore the inoperable battery charger to OPERABLE status or replace with the spare battery charger within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least H0T SHUTDOWN within the r. ext 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD 5HUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With either Division I or Division !! of the above required D.C.
electrical power sources otherwise inoperable restore the inoperable division to OPERABl.E status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> er,be in at least H0T SHUTDDWN within thg next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDDWN within the following 24 hoors.
'i SURVEILLANCE REOUTREMENTS 1.? 2.1 Each of the above required 130-volt batteries and chargers shall be demonstrated OPERABLE:
At least once per 7 days by verifying that:
a.
1.
The p:rametais in Table 4.8.2,. I :neet the Category A limits,
-M and 1
2.
Total battery terminal voltage is greater than or equal to 130 volts an finat sharge.
a F00t D1W torJ AOD 40C-ATGE TpM 6tM_TC 115~.~1 VctT.5 f;ct nce per fZ asys anu wunin i cays aner a catte
-dischargt with battery terminal volta s' W-05 voi or hat D101510N.i overcharge with battery terminal v ~
d;::ji0 fed.. by f
a verifyingtha:g]
1.
The parame ers in
'lhis ACTION may be delayed fo "//, Tab
.s.2.1-1 meet the Category B limits, Linoperable due to less of to 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for battery chargers made 3.7.1.2 are taken' W cooling provided the ACTIONS of Specification
~ - -
~~~-
sCTA ice TMAM 150' VOLTI FOE bW1510M I. 4WD TERMI - UNIT 2 4EEA 5E TNM MS VOLT.5 FOE blVIILOM II
- /4 B-10 v 4
.amena o.80 i
-o
6 O
[LECTltICAL l0!ER MYST'fMS puRVE.LLANCEtEDU:REMYS(Continued) 2.
There is no visible corrosion at either terminals or connectors, or the connection resistance of these iteen is less than 150 x 10 ' ohn, and 3.
The average electrolyte temperature of ten of the connected cells is above 60*F.
At least once per 18 months by verifying that:
c.
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, 2.
The cell-to cell and terminal connections are clean,' tight, free of corrosion and coated with anticorrosion material, 3.
Th* resistance of each cell-to-cell and terminal connection is
+--bb less than or equal to 150 x 10 8 ohn, and
- \\
4.
Thebatterychargerwillsup{yatleast100amperesata
\\ --
minimum of_129 volts fer at _ att 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C'FBE M5 ton LAMB AT-A MINIMOM QF (24.73d_TS FOF DIO)SloN'JI a
u.
m
..... vm.s pur J 5 suun 6ne ey vus s uy any 6ns 6 w i tner. w -
1.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for the design duty cycle (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) when the battery is subjected to a battery service test, or 2.
The battery capacity is adequate to supply a dunny load of the following profile while maintaining the battery terminal voltage greater than or equal to 105 or 210 volts, as applicable:
a)
Patteries 2PA and 2PB greater than or equal t: 710 amperes during the initiel 6 seconds of the test.
b)
Batteries 2PA and 2PB greater than 182 amperes during the next 42 seconds of the test.
c)
Batteries 2PA and 2P8 greater than or equal to 54 amperes during the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the test.
d)
Batteries 2PA and 2P8 greater than or equal to 480 amperes during the last 6 seconds of the test.
At least once per 60 months during shutdown by verifying that the c.
~
battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. At this once per 60-month interval, this performance discharge test may be performed in lieu of the battery service test.
f.
At least once per 18 months performance diccharge tests of battery
[
capacity shall be given to any battery that shows signs of degradation or has reached 85% of the service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below go% of the manufacturer's-rating.
FERMI - UNIT 2 3/4 8-11 Amendment No. 95 1
/w C___Z T______
- - ~-
NRC-98-0002 Page 3 l
ENCLOSURE 3 - PART 2 PROPOSED TECIINICAL SPECIFICATION REVISED PAGES INCLUDED PAGES:
3/4 8-10 3/48-11 i
~.
ELECTRICA. POWER SYSTEMS 3/4.8.?
0.C. SOURCES D.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 As-a minimum,- the following D.C, electrical power-sources shall be OPERABLE:
a.
Division I, consisting of:
2.
' 130 VDC Battery 2A-1.
1.
130 VDC Battery 2A-2.
3.
Two 130 VDC full capacity chargers.
i b;
Division II, consisting of:
1 1.
130 VDC Battery 28-1, 2.
130 VDC Battery 28-2.
3.
Two 130 VDC full capacity chargers.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:-
a.
With a battery charger in either Division I or Division II of the above D.C. electrical power sources inoperable, restore the inoperable battery charger to OPERABLE status or replace with the spare battery charger within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With either Division I or Divistor. II of the above required D.C.
electrical power sources otherwise inoperable, restore the inoperable 4
division to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the'next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.8 i
SURVEILLANCE REOUIREMENTS 4.8.2.1 Each of the above required 130-volt batteries and chargers shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The parameters in Table 4.8.2.1-1 meet the Category A limits.
and 2.
Total battery terminal voltage is greater than or equal to 130 volts for-Division I and' greater than or equal to 125.7 volts for Division:II on float charge, b.
At least once per 92 days and within 7 days after a battery discharge with battery terminal voltage less than 105 volts, or battery overcharge with battery-terminal voltage greater than 150 volts fe-Division. I-and greater. than 145 volts for Division II, by verifying that:
i 1.
The parameters in Table 4.8.2.1-1 meet the Category _B limits,-
m
'This. ACTION may be' delayed for up to 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> for battery chargers made-inoperable due~ to loss of EECW cooling provided the ACTIONS of Specification 1
3.7.1.2'are taken, i
l FERMI
- UNIT 2 3/4.8-10 Amendment No. pp,
ELECTRICAL POWER SYSTEMS SURVEILLANCE REOUIREMENTS (Continued) 2.
There is no visible corrosion at either terminals or connectors, or the connection resistance of these items is less than 150 x 10 6 ohm, and 3.
The average electrolyte temperature of ten of the connected cells is above 60*F.
c.
At least once per 18 months b) verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage cr abnormal deterioration, 2.
The cell-to cell and terminal connections are clean, tight, free of corrosion and coated with anticorrosion material, 3.
The resistance of ear.h cell-to-cell and terminal connection is less than or equal to 150 x 10 6 ohm, and 4.
The battery chargar will supply at least 100 amperes at a minimum of 129 volts for Division I and at a minimum of 124.7 volts for Division 11 for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
d.
At least once per 18 months by verifying that either:
1.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for the design duty cycle (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) when the battery is subjected to a battery service test, or 2.
' The bat %ry capacity is adequate to supply a duuy load of the follewing profile while maintaining the battery terminal voltage greater than or equal to 105 or 210 volts, as applicable:
a)
Batteries 2PA and 2PB greater than or equal to 710 amperes during the initial 6 seconds of the test.
b)
Batteries 2PA and 2PB greater than 132 amperes during the next 42 seconds of the test.
c).
Batteries 2PA and 2PB greater than or equal to 54 amperes during the aext 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the test.
d)
Batteries 2PA and 2PB greater than or equal to 480 amperes during the last 6 seconds of the test.
At least once per 60 months during shutdown by verifying that the e.
battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharga test. At this once per 60-month interval, this performance discharge test may be performed in lieu of the battery service test.
f.
At least once per 18 month? performance discharge tests of battery capacity shall be given to any battery that shows signs of degradation or has reached 85% of the service life expected for the application.. Degradation is-indicated wher the battery capacity drops more than 10% of rated capacite rom its average on previous performance tests, or is bele; 90% of i;he manufacturer's rating.
FERMI - UNIT 2 3/4 8-11 Amendment No. U,