ML20202A796
| ML20202A796 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/26/1997 |
| From: | DETROIT EDISON CO. |
| To: | |
| Shared Package | |
| ML20202A727 | List: |
| References | |
| NUDOCS 9712020224 | |
| Download: ML20202A796 (2) | |
Text
..
Attachment I to NRC-97-0092 Page1
,t 7
ATTACilMENT PROPOSED TECllNICAL SPECIFICATION CIIANGES (ALTERNATIVE WORDING) 9712020224 971126 PDR ADOCK 05000341 P
4 h.
ELECTRICAL POWER !YSTEMS fiOTOR 0PERATED VALfES THERMAL OVERLOAD PROTECTION QHITINGCONDi'IONFOROPERATI0t*
3.8.4.3 The thermal overload protection of each valve used -in safety systems shall be OPERABLE.
APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE.
ACTION:
With the thermal overload protection for one or more of the above required 0-.ves inoperable, continuously bypass the inoperable thermal overload within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or declare the affected valve (s) inoperable and apply the appropriate ACTION statement (s) for the affected system (s).
, SURVEILLANCE RE0VIREMENTS 4.8.4.3 The thermal overload protection for the above required valves shall be demonstrated OPERABLE by the performance of a CHANNEL CALIBRATION of a j
representative sample of at least 25% of all thermal overloads for the above required valves at least once per 18 months, and by performance of a CHANNEL I
CALIBRATION of the affected thermal overload following any maintenance activity which could affect the performance of that thermal overload.
(
FERMI - UNIT 2 3/4 8-20 Amendment No. R2, l
_