ML20115A626
Text
-
C)J E @
3 PUBLIC SERVICE INDIANA
=
S. W. Shields June 15 SVP-0095 1983 83 Senior Vice President.
Nuclear Division Mr. R. A. Hartfield, Chief Docket Nos.: STN 50-546
- J Management Information Branch STN 50-547 Office of Management and Program Analysis Construction Permit Nos.:
U. S. Nuclear Regulatory Commission CPPR - 170 Washington, D. C.
20555 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2
Dear Mr. Hartfield:
On October 30, 1981, your office submitted a request that information provided for the Construction Status Report, NUREG-0030, be submitted quarterly in accordance with a revised format.
In accordance with that request Public Service Company of Indiana, Inc. (PSI) submits an update of the information provided to your office on March 14, 1983.
If you have any questions on this information, please contact me at your convenience.
Sincerely, S. W. Shields I
i SWS/ GAS /bak Attachment cc: Directer of Inspection and Enforcement l
U. S. Nuclear Regulatory Commission l
Washington, D. C.
20555 J. E. Konklin J. F. Schapker P. W. O' Conner 8504150451 840606 PDR FOIA KILLEFE84-367 PDR P. O. Box 190, New Washington, Indiana 47162 812. 289.3000
Pcg2 1 ATTACHMENT CONSTRUCTION STATUS REPORT NUCLEAR POWER PLANT MARBLE HILL 1 STATUS AS OF 30 APRIL 83 CONSTRUCTION STATUS:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE: NO CHANGE APPLICANTS CONSTRUCTION COMPLETION ESTIMATE APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
NO CHANGE AS DEFINED IN CP:
(EARLIEST) JAN. 1, 1982 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE: NO CHANGE (LATEST)
MAR. 1, 1988 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: NO CHANGE CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
50.9%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: THE ABOVE NUMBER INDICATES THE PHYSICAL COMPLETION OF CONSTRUCTION BASED ON EARNED MANHOURS.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION
% COMPLETED
- MOBILIZE AND PREPARE SITE:
8-77 6-86 85%
PLACE STRUCTURAL CONCRETE:
1-78 12-85 96%
INSTALL REACTOR PRESSURE VESSEL:
8-82 9-82 9-82 100 %
INSTALL LARGE BORE PROCESS PIPE:
1-79 1-86 72%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
1-79 1-86 41%
INSTALL SMALL BORE PIPE:
2-80 3-86 14 %
INSTALL CABLE TRAY:
4-80 3-85 41%
INSTALL EXPOSED METAL CONDUIT:
4-80 10-85 25%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
1-82 12-85 6%
INSTALL ELECTRIC TERMINATIONS:
1-82 3-86 5%
CONDUCT REACIDR COLD HYDROSTATIC TEST:
8-85 8-85 0%
CONDUCT HOT FUNCTIONAL TEST:
2-86 2-86 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
1-85 6-86 0%
- Includes totals for Unit I and comanon facilities.
m Page.2 ATTACHDENT CONSTRUCTION STATUS REPORT l
NUCLEAR POWER PLANT 4
MARBLE HILL 2 STATUS AS OF 30 APRIL 33' CONSTRUCTION STATUS:
4.
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
NO CHANGE APPLICANTS CONSTRUCTION COMPLETION ESTIMATE '
. APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE: NO CHANGE AS DEFINED IN CP:' (EARLIEST) JAN. 1,.1984 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE: NO CHANGE (LATEST)
SEPT.1,.1989 APPLICANT'S CURRENT ESTIMATED COBSERCIAL OPERATION DATE: NO CHANGE CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
29.6%
COf9ENTS REGARDING CURRENT CONSTRUCTION STATUS: THE ABOVE NUMBER INDICATES THE PHYSICAL COMPLETION OF CONSTRUCTTON BASED ON EARNED MANHOURS.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION
% COMPLETEDE MOBILIZE AND PREPARE SITE:
12-77 6-86 852 PLACE STRUCTURAL CONCRETE:
3-78 12-86 aC INSTALL REACTOR PRESSURE VESSEL:
9-83 10-83 0;
INSTALL LARGE BORE PROCESS PIPE:-
5-79 12-86 34 1 INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS:
5-79 12-86 262~
INSTALL SMALL BORE PIPE:
5 3-87 5'
INSTALL CABLE TRAY:
e 6-81 12-85 50%
INSTALL EXPOSED E TAL CONDUIT:
10-8 1 3-86 10%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
9-83
~12-86 1%
INSTALL ELECTRIC TERMINATIONS:
3-84 3-87 nr CONDUCT REACTOR COLD HYDROSTATIC TEST:
2-87 8-86 02 CONDUCT HOT FUNCTIONAL TEST:
8-87 2-87 n;
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
7-86 12-87 u a. -
}
- Does not include any comunon facilities.
I I
_ -