Requests Approval by 830701 of Re RCS Pressure Isolation Valve Leak Testing,To Support Planning & Scheduling of Next Refueling Outage
ML20079J587
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/23/1982
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8212280280
Download: ML20079J587 (1)


Text

-

Malling Address Alabama Power Company 600 North 18th Street Pist Offic] Box 2641 Birmingham, Alabama 35291 A Telephone 205 783-6081 i F. L. Clayton, Jr.

%gll,70;ld*"' , AlabamaPower the southern ekttoc system December 23, 1982 Docket Nos. 50-348 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Reactor Coolant System Pressure Isolation Valves Gentlemen:

In accordanca with Technical Specifications 4.4.7.3. and 4.4.7.2.2 for Units 1 and 2, respectively, Alabama Power Company is required to perform leak tests of all reactor coolant system pressure isolation valves to access their operability. As stated in Alabama Power Company's August 10, 1982 letter, the Unit 2 leak test acceptance criteria of 1 gpm versus the Unit 1 criteria of 1 to 5 gpm (with certain limitations) has proven to be excessively restrictive without providing increased assurance of valve operability.

Subsequent to Alabama Power Company's August 10, 1982 letter, the NRC granted temporary relief to the leakage criteria in Amendment No. 20 to the Unit 2 Facility Operating License. Alabama Power Company hereby requests approval by July 1,1983 of the August 10, 1982 letter to support the planning and scheduling of the next refueling outage.

Yours very truly, O 4 /

Fb.klayton, r.

I 1 FLCJr:BDM:mjh-D33 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. W. H. Bradford 0

[ 8212280280 821223 PDR ADOCK 05000348 P PDR