ML20078E780
| ML20078E780 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 01/25/1995 |
| From: | Benes G COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-94-03, GL-94-3, NUDOCS 9502010134 | |
| Download: ML20078E780 (2) | |
Text
CN Commonwealth Edison
) 1400 Opus Place v
kO J Downers Grove, liknots 60515 w
January 25,1995 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
LaSalle County Nuclear Power Station Additional Information in Response to Generic Letter 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors."
i NRC Dockets 50-373 and 50-374
Reference:
1)
August 23,1994 letter from G. Benes to USNRC, Comed BWR response to Generic Letter 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors."
The Reference 1 letter transmitted the LaSalle County Station response to NRC Generic Letter 94-03 "Integanular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors." This letter provides additional information in regards to the inner diameter and outer diameter weld lengths that were inspected during the LaSalle County Station Unit 1 sixth refueling outage.
The entire inner diameter weld lengths for welds H1, H2, H6, H7, and H8 are inaccessible, therefore 0" were inspected. For the inner diamotor weld length of weld H3, only 32" were inspected. Specifically, at the 66,156,246, and 336 degree locations, 7.5", 9.0", 8.0", and 7.5" respectively, were inspected. For the inner diameter weld lengths of welds H4 and H5, only 80" were inspected. Specifically, at each of the 24,66,114,156,204,246,294, and 336 degree locations,10" were j
inspected at each location.
I The entire 650" outer diameter weld length for welds til and H3 was inspected.
For the outer diameter weld length for weld H2, only 590" of the total 650" were inspected due to LPCI Bellows interference. For.the outer diameter weld lengths for welds H4, H5, and H6, only 289" of the total 650" were inspected due to Jet Pump interferences. For the outer diameter weld length for welds H7 and H8, only 280" of the total 631" were inspected due to Jet Pump interferences.
To the best of my knowledge and belief, the statements contained above are true and correct. In some respect these statements are not based on my personal knowledge, but obtained information fumished by other Comed employees, contractor employees, and consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
J I'
s,
9502010134 950125
'b gDR ADOCK 0500o373 PDR J
e
?
i USNRC.
(2)
January 25,1995 W
Please direct any questions that you may have concerning this matter to this i
affice.
I Respectfully,
,:::: :: :----- :: :- -- :::::: h,l OFFICIAL SEAL
[gg ij MARY JO YACK l
s oun w.;ic s eer or twwoisl MY COMH %>0N s *MiF 11/2097 d
<:l::::::: ::::::::: :: ::::-J Gary G. Benes Nuclear Licensing Administrator Subscribed and Swom to before me onthis HH day of
/IJn u o4
.1995.
y o-8
^% a/,u, n, ?,mL]
i Nbtdry public()
cc:
J. B. Martin, Regionil Administrator - Rlli W. D. Reckley, LaSale Project Manager - NRR P. G. Brochman, Senior Resident inspector - LaSalle Office of Nuclear Facility Safety - IDNS I
l i
I
.