ML20071Q107

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1982
ML20071Q107
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 11/01/1982
From: Kelly W
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20071Q084 List:
References
NUDOCS 8212290218
Download: ML20071Q107 (4)


Text

..

MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of October,1982. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is no significant operating experience or major safety related maintenance to report.

No challenges to the PORV's or safety valves have been made. Furthermore, no changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

I l

l 8212290218 821102 PDR ADOCK 05000275 R PDR

i.

)*: .

OPERATING DATA IkEPORT

- DOCKET NO. 50.275 _

DATE 11/1/R2 W.J. (ell y COMPLETED TELEPHONE BY (805} 535-7351 OPERATING STATUS

1. Unit Name:

Diablo Canyon Unit 1 Notes

2. Reporting Period: October 1982 166.9
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): Il70
5. De' sign Electrical Rating (Net MWe): 1084
6. Maximum Dependable Ca'pacity (Gross MWe): 1134
7. Maximum Dependable Capacity (Net MWe):

1084

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giv'e Reasons:

NONE

9. Power LevelTo Which Restricted,if Any (Net MWe): 10. Reasons For Restrictions,1f Any: SUSDended low power test license This Month Yr.-to-Date Cumulatise 0 0 o
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Resene Shutdown Hours 0 0 o
14. Hours Generator On.Line 0 0 0
15. Unit Resene Shutdown Hours 0 0 ~0
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) Q 0 0
18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor N/A
20. Unit Asailability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each):

NONE -

25. If Shut Down At End Of Repoi tPeriod. Estimated Date of Startup: November,1982 (Fuel Load)
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY Jan 1982 ~

INITIAL ELECTRICITY Jan 1983 COMMERCIAL OPER ATION April 1983

, (4/77)

DOCKET NO. 50.275 UNIT SilUTDOWNS AND POWER REDUCTIONS Diablo Canvon Unit 1 UNIT N AM E DATE 3 3/ 3/E COMPLETED BY W d Kelly REPORT MONTil'0ctober 1982 TELEPilONE (805)595-7351 No. Date g

3g 3 Ej 3j )Y jg&

Licensee Event

,E-r, g7 3

Cause & Corrective

- Action to mo gO H y= $ j;5g Report a g Prevert Recurrence 6

810928 F 0 H 4 81-002/OlT ZZ ZZZZZZ Halted fuel loading preparations

- upon discovery of seismic calculation errors. Reanalysis.and reviews are being conducted in accordance with Commission's instructions.

l I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5 G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) Il-Other (Explain) .

.i

.n,

' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50.275 Diablo Canyon Unit:1 UNIT DATE 11/1/82 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351 MONE October 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) t MWe. Net) 1 0 17 0

, 0

- I8 0 0

3 19 0 0 '

4 20 0 0 0 5 21 6 0 22 0 7 0 -

23 0

0 8 24 0 9 0 25 0 10 0

26 0 11 0 27 0 0

1 ~,

28 0 0

13 29 0 14 0 30 0 0

15 31 0 16 0 INSTRUCTIONS On this format.hst the average daily unit power leselin Mwe. Net for each d3) in the reporting month. Compute to the nearest whole ny:gawatt.

1

! (9/77) ,

l -

- . ._. _ _ _