ML20070N939
ML20070N939 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 05/06/1994 |
From: | Long R GENERAL PUBLIC UTILITIES CORP. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
C-94-2443, C000-94-2443, C311-94-2051, NUDOCS 9405100237 | |
Download: ML20070N939 (21) | |
Text
_..
s GPU Nuclear Corporation
- . arsi an ,te Jers y07054 201-316-7000 TELEX 136-482 Wnters Direct Dial Number:
May 6, 1994 C000-94-2443 :
C311-94-2051 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit No.1 (TMI-1)
Docket No. 50-289 Operating License No. DPR-50 Long' Range P1anning Program (LRPP)
Semi-Annual Update of Integrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN)
Corporation hereby submits the required semi-annual update of projects listed in each category (A, B, and C) as defined by the LRPP integrated schedule.
The attachments to this letter include: 1) the ABC project listing; and, 2) a summary of changes since the last submittal forwarded by GPUN Letter No.
C311-93-2154, dated November 11, 1993. . An abstract of the attachments follows: i
- 1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects and by a double asterisk (**) to identify changes in Budget. Authorization (8/A)- ;
number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or are scheduled consistentwithcycle/yearcommitments, Any changes in schedule are reflected on Attachments A and B. t 1
0SGC 940sioo2s7 940so6 PDR ADOCK-osooo289 [\ 3 R PDR GPU Nuc! ear Corporation is a subsidiary of General Public Utities Corporation
. : 1 l
5 0000-94-2xxx C311-94-2051 Page 2 1
- 2. Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate. The listing also contains Category C project completions. Changes to the Category C scope or schedule do not impact the Category A and B schedules.
Pursuant to the LRPP for THI-1, GPU Nuclear will assume that the NRC is in agreement with the above Category A and B changes, unless we are notified otherwise within 15 days of receipt.
Sincerely, pq,, R. L. Long
($ Vice President and Director Services Division GMG/plp cc: Administrator, Region 1 TMI-l Senior Project Manager TMI Senior Resident Inspector
l \
1 ,
- 1
)
4 i
I. i 1 -1
- i -
ATTACHMENT A TMI-l PROJECT LISTING i 1
- INTEGRATED SCHEDULE I
SEMI-ANNUAL UPDATE I
l (MAY, 1994) i e
a l
i a
Y 4
-+ w w *ewr= c, se e,wy,w,. w em -m v vw,* -w , t e wt-, e, re ee e %.-- w,---.mer -.-c-w,.e.==-,w,r...c.s,.w.e-e,.w-,-,--w-=,w,.*--e.= , . - - = - = .-w = --.-- 1=.
TM i -1 PROJECT LIST l NG LEGEND NRC I NTE' GRATED SCHEDULE NEW PROJECTS -------------------------------------------- !
- - BA NUMBER CHANGE i
CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 l
... _..............______..........._ .___.______ _.... _________..________...........__.....________________.....__..__....________ j JOBS - BA DESCRIPTION CYCLE / CLASSIFICATION t NUMBER YEARS 1 123321 REACTOR BLDG TENDON SURVEILLANCE PROG 10 NRR
- 1. UPG PROC TO RG 1.35R3. 2. PROVIDE CNTRACTOR AND PLT SPRT FOR SURV PROGRAM.
REF. NUREG 135.1;TS 4.4.2.1 2 123328 OTSG TUBE PLUGGING 11R NRR 4
RB BASE:REPL.20 1-600 FRM ECT,15 i-600 FRM PSLR;RMVE 10 TUBES FRM SRVC (20 PLGS);
BACKPLG DEFECTIVE M-3'S (REF.TS 4.19) 3 126254 ** OTSG EDDY CURRENT TESTING 10/11R 11R NRR RB PREP.& PERFORM ECT OF OTSG IN ACCORD. W/
TS SEC 4.19. APPROX.10% OF TUBES /OTSG+6%
, EXPANDED SAMPLE,& 750 PLUGS +500 SLEEVES 4 126255 ** TMI INSERVICE INSPECTION - 11R 11R NRR i
. ALL ASME SECTION XI INSPECTIONS: AUGMENTED l ISI TO COMPLY WITH 10CFR50.55A 5 128176
- iSI CHEUR VALVE NON-INTRUSIVE TESTING 11R NRR EVAL OPTICNS FOR NON-INTRUSIVE TEST OF CHECK VALVES'TO MEET ASME SEC XI &
GL 89-04 i
'6 128186 ** PIPE WALL THINNING MONITORING 11R NRR 1
ALL i AUGMENTED INSPECTIONS TO DETECT DEGRADA-TION DUE TO FLOW ASSISTED CORR sFAC) PER NRC GL 89-08(90 POINTS) & 10 NON FAC PTS 7 -123321
- REACTOR BLDG TENDON SURVEILLANCE PROG 12 NRR 1.-UPG PROC TO RG 1.35R3. 2. PROVIDE CNTRACTOR'AND PLT SPRT FOR SURV PROGRAM.
REF..NUREG 135.1;TS 4.4.2.1 ;
+
.. -, - ,- - - -.--r . - - -., - . - . . . . ,.
TM i-1 PROJECT L i ST 1 NC ,
.........__ ______. _..__._....._....... s
~
LEGEND NRC 1 NTEGRATED SCHEDULE
- NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE CATEGORY 'B' PROJECTS i
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 8 123ABC OTSG TUBE PLUGGING 12R NRR PLUG OTSG TUBES AS NECESSARY. PLAN IN-CLUDES NEW PLUGS AND REPLACEMENT OF EX-ISTING PLUGS. REF. TS 4.19 9 123334 ILRT 12R NRR INTEGRATED REACTOR BUILDING LEAK RATE TEST 10 12696B ISI INSPECTIONS (12R) 12R NRR ASME SECT XI INSPECTIONS; AUGMENTED ISI TO COMPLY WIT 11 10CFR50.55A 11 12696C OTSG EDDY CURRENT TESTING 12R NRR ECT OF SAMPLE INSPECTION GROUP. 3%
PER OTSG PER T.S. 4.19 12 128AEK ** PIPE WALL THINNING MONITORING 12R hRR AUGMENTED INSPECTIONS TO DETECT EROSION /
CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS, REF.-GL 89-08 13 123ABC
- OTSG TUBE PLUGGING 13R NRR i-PLUG OTSG TUBES AS NECESSARY. PLAN IN-CLUDES NEW PLUGS AND REPLACEMENT OF EX-ISTING PLUGS. REF. TS 4.19 14- 126LL3
- OTSC EDDY CURRENT TESTING - 13R 13R NRR ECT-OF SAMPLE. INSPECTION GROUP. 3% PER OTSG (REF4 TS 4.19)
.- _. . ~. . -.. , , . _ . - . ., .
TM i - 1 PROJECT L i ST I NG
~
LEGEND
- NRC 1 NTEGRATED SCHEDULE
- NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS Of 27APR94 OBS BA DESCRIPTION CYCLE / CL ASS I F I CAT I ON NUMBER YEARS 15 126LL6
- ISI INSPECTIONS - 13R 13R NRR ASME SECT XI-!NSPECTIONS: AUGMENTED ISI TO COMPLY WITH 10CFR50.55A.
16 128AEL
- PIPE WALL THINNING MONITORING 13R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /
CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS. REF GL 89-08 17 123298
- FORCED OUTAGE / EMERGING MAINTENANCE 89-99 NRR OUTAGE 10P3 - PERFORM REQUIRED CONTROL ROD. DROP TESTING 18 128152 MOV PROGRAM 90-94 NRR DEVELOP & IMPLEMENT MOV PROGRAM TO MEET GL 89-10.
REF MEMO C311-90-3132,C311-89-2117 19 412617 TMl IPE EXTERNAL EVENTS 92-9h NRR PERFORM THE IPE ANALYSIS FOR EXTERNAL EVENTS - REF: LETTER NO. C311-91-2150 & -
LAl'91-9238, 9239, 20 419266 ** SIMULATOR MODIFICATIONS - TMt (1994) 94 NRR UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOM MODIFICATIONS.
REF. 10 CFR 55.45 21 41995G SIMULATOR MODIFICATIONS - OUTYEARS 95-99 NRR UPGRADE SIMULATOR CONSISTENT WITH CNTRL ROOM MODS REF. 10 CFR 55.45 L.
T M 1 -~1 PROJECT L i ST I NG LECEND
NRC l~N T E G R A T E D 5CHE9ULE
- NEW PROJECTS - - . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OBS BA DESCRIPTION CYCLE / CL ASS I F I CAT I ON NUMBER YEARS 22 122031 DEMOBILIZATION SOUTH OF THE DIKE 10 GWC DEMOLITION, DISCONNECT ELECTRICAL, DISPOS OF MATERIALS FOR FACILITIES SOUTH OF THE DlKE (SEE BA FOR DETAILS OF FACILITIES)
RMS EFFLUENT QUANTIFICATION 10 REL 23 412605
]
ROUTE CABLES FROM CR READOUT PANELS AND ,
AUXILIARY BUILDING TO THE PLANT PROCESS COMPUTER IN THE CR. !
24 412612 PERM DEMIN SYST/ MISC WASTE EVAP 10 IOE DECON & PREPARE CHEM CLG BLDG FOR PROBABLE INSTALL OF DEMINERALIZER TO BE USED WITH RADWASTE MISC WASTE EVAPORATOR 25 418798 ROOFING REPLACEMENT 1994 10 MRC i
REMOVE IF NECESSARY EXISTING ROOF &
INSTALL NEW ROOFING SYSTEM ON THE LOWER AUXILIARY BLDG.(EL 331-0) 26 418822 ** CONTROL TOWER RENOVATIONS - 4TH FLOOR 10 GWC UPCRADE FACIL FOR I&C MAINT & OPS INSIDE UNIT 1 CONTROL TOWER.EL 355' TO BE RENO-VATED & CONSTRUCT INTERMED FLR (365')
27 419259
- EOF /JIC CONSOLIDATION 10 FAC RELOCATE TMI JOINT' INFO CENTER TO TML EOF. MAKE REQUIRED MODS TO EOF TO PERMIT SIMULTANEOUS OPERATION OF JIC AND EOF 28 419738 ROOF REPLACEMENTS 10 MRC REPLACE ROOFS ON BLDG 36, WAREHOUSE 1, WAREHOUSE 3, AND DEWEY HOUSE.
_ , _ _ . . _ . , . _ _ , , , _ . . _ . 4 - _ _ , . . _ . _ _ _ . _ . , _ . . . , _ _ _.
__ .- - ,.,_.,.4- , . ~ . . _ , . , _. , ,-
TM i - 1 PROJECT- L I s'T I NG
+
LEGEND
--~~~- NRC 1 NTEGRATED SCHEDULE
- NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE .
CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OBS BA DESCR I PT I ON CYCLE / CLASSIFICATION NUMBER YEARS 29 419742 TMl ROADS UPGRADE 10 FAC NORTH GATE, TRLR 350 PARKING AREA, GATE 1 (N TO ROADWAY), INSIDE SEWAGE TREATMENT PLANT & MOTORCYCLE AREA 30 995100 MOBILE XFMR ON SITE STORAGE 10 GWC GPU SYSTEM MOBILE CENERATOR STEP UP(GSU)
TO BE STORED AT TMi SITE. OlL SPILL CON-TAINMENT AND ELEC WORK REQUIRED.
31 412AHW
- ROOF REPLACEMENTS 11 MRC j VARIOUS ROOF REPLACEMENTS 32 412648 RADWASTE STORAGE CAPABIL PHASE 2 11 NRR PROCURE EQUIP & CONSTRUCT STORAGE FACILITY FOR LLRW STORAGE lEN 90-09 GL 81-38
, 33 418750 SERVICE BLDG ADDITION 11 FAC SCOPE NOT DEFINED, $ ALLOCATED FOR 1996.
34 419707 SAND BLASTING & PAINTING FACILITY 11 CWC ,
t DESIGN AND CONSTRUCT FACILITY TO SUPPORT FAB ACTIVITIES FOR PLANT MODS AND MAINT.
TO REPLACE EXIST DELAPIDATED SHOPS.
35 419727 CONSTRUCT STORAGE FACILITY 11 GWC PROVIDE-FACILITIES FOR IS TELEPHONE PERSONNEL, WASTE MANAGEMENT & OTHER DIVISIONS 9
. v --
- r TM i . 1 PROJECT L l I NG
...__._______.__. ..____ ....._'S T___......
LEGEND
NRC I NT E G R A T-E D SCHEDULE
- .NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS j SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94' !
OBS BA DESCRIPTION CYCLE / CLASSIFICATION '
NUMBER YEARS i
36 419742.
- TMt ROADS UPGR ADE 11 FAC l VARIOUS ROAD UPGRADES '!
37 41994C REPLACE BUILDING 4DO 11 FAC i
DEMOLISH EXISTING CONNECTED TRAILERS AND COMMON ROOF. CONSTRUCT A NEW BLDG FOR .!
.SECURfTY, GET, ARWT AND OUTAGE PROCESSNG 38 123GGG OTHER OUTAGE RELATED ACTIVITIES 11R ALL !
ALL OUTAGE RELATED ACTIVITIES SUCH AS ,
INSPECTIONS, REPAlRS, SURVEILLANCES, MINOR MODIFICATIONS, MOD SUPPORT, ETC. j 39 123329 11R FUEL MOVEMENT FOR 11R CORE LOAD 11R NRC '
RB PLNG,ENGNG, PROCURE,& LABOP. FCR RX HEAD &
PLENUM REMVE/ INSTALL, FUEL. OFFLOAD / RELOAD i
& INSTALL SEAL PLATE. 68 ASSMBL/650 EFPD .
40 123331 CRDM FLANGE GASKET REPLACEMENT 11R MRC i REPLACE 17 CRDM FLANGE GASKETS 3
41 128187
- RX BUILDING CRANE REFURBISHMENT 11R MRC REFURBISH BRAKING SYSTEM ON THE RB CRANE MAIN AND AUXtLLARY HOISTS 42 412552 MODIFICATIONS FOR SEISMIC QUALIFICATION 11R NRR ALL.
l'I -
MODS.TO COMPLY WITH SEISMIC QUAL TO INCL l HVAC UNITS, HANDRAILS, CR CEILING, CABLE TRAY & CONDutT
TM i - 1 PROJECT L i ST I NG LEGEND
NRC i NTEGRA TED SCHEDULE
- NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 43 412509 DIGITAL TURBlNE CONTROL SYSTEM (DTCS) 11R REL UPGRADE MAIN TURBINE EHC ELECTRONICS WITH DIGITAL CONTROL SYSTEM TO IMPROVE RELIABILITY OF TURBlNE CONTROLS 4t 412615
INSTALL REMAINING PLATFORMS-INTERMED BLG
, DIVER PLATFORM, D-RINGS, AND FUEL TRANS CANAL. STAIRWAY 45 412626 UPGRADE SOURCE RANGE NUCLEAR INSTR (NI) 11R MRC CB RB REMOVE BF-3 DETECTORS FROM Ni-1,2; ADD ADDITIONAL FISSION CHAMBERS FOR NI-11A, 12A CHANNELS; ROUTE CABLE. (PHASE 2) 46 412629
- AUX FUEL BRIDGE VARIABLE FREQ DRIVE SYS 11R REL REPLACE EXISTING THYRISTER ORIVE '!
MOTOR CONTROL WITH VARIABLE FREQUENCY SPEED SYSTEM ,
47 412646 MOV MODS 11R NRR REPLACE OR MODIFY ACTUATORS AS. REQUIRED DUE TO GL 89-10 PROGRAM
'l 48 412652 HEATER DRAIN PIPE REPLACE-EROS / CORR 11R MRC REPLACE REMAINDER OF HEATER DRAIN PUMP PIPING SYSTEM NOT COMPLETED DUHING 10R.
AS IDENTIFIED BY THE EROS / CORR PROG.
49 412655
- RX BLDG SUPPLEMENTAL HOIST 11R lOE r RB SPECIFY, SELECT, PROCURE AND INSTALL 3 HOISTS (2 FOR RV ACCESS, l'FOR RB EQUIP i HATCH ACCESS) IN THE RB
T- M i - 1 P,R O J E C T L i ST I NG 4
LEGEND NRC i NTEGRATED . SCHEDULE
- NEW PROJECTS --------------------------------------------
. ** BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 271.PR94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION
, NUMBER YEARS 50 418808 RC-P CARTRIDGE SEAL CONVERSION (2 PUMPS) 11R MRC INSTALL (2) NEW CARTRfDGE SEALS ON RC-P
- 1 B & C. IN ADDITION, CLEAN & INSPECT #1 SEALS ON BOTH PUMPS.
4 51 412AHW
- ROOF REPLACEMENTS 12 MRC VARIOUS ROOF REPLACEMENTS J
52 419742
- TMl ROADS UPGRADE 12 FAC VARIOUS ROAD UPGRADES 53 123ABD REACTOR REFUELING 12R MRC LOAD FUEL ASSEMBLIES FOR 650 EFPD 54 123LLL OTHER OUTACE RELATED ACTIVITIES 12R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.
55 123330 ** RX BUILDING PRESERVATION 12R MRC RB AB PAINT / COAT AREAS IN RB INCLUDE:lC&NS PIPE: STEEL, WALLS, HANDRAILS; FLOORS;RB LINER. RU/RD=12OO-1500FT IN AUXBLOG 56 123335
- REPLACE MAIN STEAM LINE INSULATION 12R MRC REPLACE DEGRADING INSULATION ON MAIN STEAM LINE--
i-_ _ _ _ _ _ - - -- - _ _ _ _ . - _ _- _ _, . . . - . _ - - - --____ - -___ -
- i. "
~
1 TM I -1 PROJECT L I ST I NG
~
- LECEND ,
NRC I N T'E G R A T E D SCHEDULE
- NEW PROJECTS
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OSS. BA DESCRIPTION CYCLE / CLASSlFICATION NUMBER YEARS {
l 57 412552
- MODIFICATIONS FOR SEfSMIC QUALIFICATION 12R NRR d
MODS TO COMPLY WITH SEISMIC QUAL TO INCL HVAC UNITS, HANDRAILS, CR CEILING, CABLE TRAYS & CONDUIT 58 418813 INCORE DETECTOR REPLACE (43) 12R MRC REPLACE 40 INCORE DETECTORS THAT ARE PROJECTED TO HAVE REACHED THE END OF LIFE 4
59 123ABD
- OTHER OUTAGE RELATED ACTIVITIES 13R AL L ALL ,
' OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR' MODIFICATIONS, MOD SUPPORT, E's C.
61 418813
- INCORE DETECTOR REPLACEMENT 13R MRC REPLACE 12 INCORE DETECTORS THAT ARE.
PROJECTED TO HAVE REACHED THE END OF USEFUL LIFE 62 128114- EPRI STEAM GENERATOR RELIABILITY PROGRAM 88-98 MRC CO-FUNDtNG FOR EPRI SGRP TASK 404, i
63 123262 RELI ABILITY CENTERED MAINTENANCE PROG 96 MRC !
RCM EVALUATION OF PLANT SYSTEMS TO DEFINE MAINT. ACTIVITIES THAT IMPROVE RELIABILITY. ..
, % v , - -4 ,-s.-% ru - ~ eu o 4--,- -%.- . m.. ..,
TM i - 1 PROJ C T L i ST I NG
......______ _____E _... . ______________
~
LEGEND
NRC 1 NTEGRATED SCHEDULE
- NEW PROJECTS --------------------------------------------
CERT OF UT NDE INSPECTORS PER APP Vill 65 128166 COMPONENT DATA BASE EXPANSION 92-94 IOE ENHANCE THE EXISTING ENG DATA BASE WITH SUBCOMPONENTS TO MEET THE NEEDS OF PLANT MAINT & OPERATIONS ORGANIZATIONS.
66 128163 DRAWING ENHANCEMENTS THI 92-95 MRC
- 3. REDRAW GEN ARRANG IN CAD FORMAT 67 1281T4 REPLACEMENT OF OZONE DEPLETING CHEMICALS 92-95 MRC RECHARGE EQUIPMENT THAT IS COMPATIBLE WITH REPLACEMENT CHEMICALS DUE TO PHASE OUT OF OZONE DEPLETING CHEMICALS 68 412643 FLOOD PANELS 92-95 ISM DEVELOP PLAN TO RESOLVE THE OUTSTANDING PRA ISSUE REGARDING FLOODING. ALSO IM-PLEMENT MODS DEEMED APPROPRIATE.
69 412645 CFC EL!MINATION 97-95 MRC MODIFY / REPLACE EQUIPMENT.TO BE COMPATIBLE WITH REPLACEMENT CHEMICALS AS , REQUIRED.
70 412592 1992 CONFIGURATION MANAGEMENT - DBR 92-98 IOE DESIGN BASIS RECONSTITUTION 1992
L j TM i - 1 PROJECT L iST I NG LEGEND
' '------ NRC 6 NTEGRATED SCHEDULE &
- NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS l
71 128177
- THERMO-LAG FIRE BARRIER EVALUATIONS 93 NRR l SUPPORT EVALUATIONS OF THERMO-LAG 330-1 F IRE B ARR IER SYSTEMS TO ACHIEVE COMPLi- !
ANCE W/ 10CFR50 APP R AT TMI-1 72 412618 ACCIDENT MANAGEMENT GulDELINES(AMG) 93-95 NRR .
1 USING IPE CUTPUT, DEVEL AMG FOR USE BY EMERG RESPONSE PERSONNEL TO COPE WITH CORE DAMAGE EVENTS 73 126109 BwOG GLRA PROGRAM 93-97 MRC i
PARTICIPATE IN AND PROVIDE SUPPORT FOR i THE BWOG GENERIC LICENSE RENEWAL APPLICATION (GLRA) PROGRAM 74 412631 PRESSURIZER HEATER BUNDLE REPLACEMENT 93-97 MRC .
DEVELOP A PROCUREMENT SPEC TO DESCRIBE-THE ELEC AND MECH REQUIREMENTS FOR A NEW BUNDLE. PURCHASE IN '94/'95. ,
75 412634 TMI-1 RCP MOTOR STANDBY STATOR AND ROTOR 93-97 MRC i
' SPECIFY AND PROCURE A SPARE STATOR AND ROTOR SUITABLE FOR ANY RCP MOTOR. NO PROCUREMENT FUNDING-ENGINEERING ONLY. 3 5
76 419260
- SIMULATOR COMPUTER UPGRADE 93-97 MRC UPGRADE THE TMt SIMULATOR COMPLEX TO EN-ABLE INTEGRATION OF FUTURE PLANT MODS TO i COMPLY WITH SIMULATOR CERT REQUIREMENTS.
77 128175 ASSMNT & UPGRD OF UNDRGRND TANKS / PIPING 93-99. ERR l-ASSESS APPLIC TANK / PIPE SYS. !I-INIT .;
TEST & MONITORING. Ill-UPGRADE AS REQD.
(REF 40 CFR 112) ,
TM i -1 PROJECT L iST I NG s
LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS --------------------------------------------
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 27APR94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 78 126238 EVAL OF TMl ALERT & NOTIFICATION SYSTEM 93/94 NRR EVALUATE SYSTEM SIRENS USING LATEST DEMOGRAPHIC & TOPOGRAPHIC INFO TO INSURE STILL MEETING FEMA REQMNTS 79 128170 GUIDELINES FOR ABNORMAL TRANSIENT PROC 93/94 IDE DEVELOP PLANT SPEC GUIDE (PSG) FOR TMI-1 ATP PROVIDING TECH BASES FOR ATP'S TO BE USED IN TRAINING, EVAL PROC CHANGES,ETC.
80 128173 CAVITY DOSIMETRY ANALYSIS 93/94 NRR REPLACE A & B CAPSULE HOLDERS WITH NEW DOSIMETRY DURING 10R, TRANSPORT, ANALYSIS AND REPORT OF RESULTS OF TESTING 81 126252 ** MAINTENANCE TRAINING ANALYSIS 94 NRR DEVELOP TASK ANALYSIS FOR l&C, ELECTRICAL AND MECHANICAL INPO ACCREDITED PROG 82 128181 SIMULATOR ENHANCEMENTS 94 REL ADD NEW MODELS OR REPLACE EXISTING MODEL PER RPA, INCLUDES RCDT, CONTAINMENT, REACT UPGRADE, FW FLOW, CURIE TRANS.,ETC.
83 418821 ** PLANT PRESERVATION BOP - 1994/1995 94 MRC SCAFFOLDING, SURFACE PREPS, PAINT / COAT OF APPROX 30.000 SQ FT IN TB PREVIOUSLY' NOT PAINTED / COATED 84 412619 CPU /IPU UPGRADE FOR PLANT PROCESS COMPUT 94-97 IOE UPGRADE PLANT PROCESS COMPUTERS CPU AND IPU BOARDS (18) VITH A SINGLE BOARD,
4 TM i - 1 PROJECT L l -S T I NG LEGEND
NRC I NTEGRATED SCHEDULE
- .NEW PROJECTS --------------------------------------------
86 128183 B&W OWNER'S GROUP 1994/1997 94-99 NRR PARTICIPATION IN B&W OWNERS GROUP '
PROGRAM B7 412624 CORE MONITORING SYSTEM UPGRADE 95 ISM INSTALL NEW FIXED MARGIN TS SFTWARE THAT t
WHEN USED WITH EXISTING NAS WILL PROVIDE ADDED OPERATING SAFETY MARGIN 88 128AEl ** REACTOR CAVITY DOSIMRTRY - 11R 95-99 NRR 1 SHIP IRRADIATED CAVITY DOSIMETRY REMOVED IN 11R AND ANALYZE-89 4197S0 ** SECURITY EQUIPMENT - TMI 95-99 MRC
! REPLACEMENT OF TURNSTILES, VITAL AREA DOOR, CCTV CAMERAS, PRTABLE RADIOS, HAND GUNS, LEATHER GEAR & SLIDE GATE OPERATOR 90 128AEC DRAWING ENHANCEMENTS TMl 96-99 MRC
- 3. REDRAW GEN ARRANG IN CAD FORMAT
! 91 128ADV 1996 CONFIG MGMT SSFI 96/98 ISM PERFORM ONE SAFETY SYSTEM FUNCTIONAL INSPECTION. PREPARE DRAFT DESIGN BASIS DOCUMENT IF REQUIRED.
L
-.______.____._____m .._______. _ _._ _,_.____ _ _ _ 1_ _ _ _ _ _ _ _ , , . - - . - , ev_ _ _ , , n ., - - =
, - ~ , . --- - . - .
l l
ABC Classifications a) MeetNRCReauirements(NRR)-Activitiesthata)mustbecarriedoutto fulfill specific NRC requirements or b) have been committed to the-NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.
b) Meet Environmental Reauirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and '
Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.
c) Meet Other Reauirements (ORR) - Activities not covered by the NRC or '
environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would ,
result in a violation of that ordinance, code or guidance, court order, etc.
d) Increase Safety Marains :(ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance, e) Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regul atory compliance nor required by environmental regulations, codes or guidance.
l f) impr_ove Radioloaical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance, g) Maintain Reliability /Canability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment. Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently.
h) Jmprove Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.
1
- . .. . . ~- .. .. . .. . . . . -- . .-
l 4
ABC Classifications (continued) l
- 1) Imorove Operational Effectiveness (10E) -
Activities that, if implemented, will improve staff efficiency or provide a direct economic payback'in terms of reduced operating /maint.enance costs.
j) Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.
k) Erovide Continaency/ Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items e.ssential to support routine operations.
- 1) Improves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.
.- . . . . . .- 2. .-. , .. --
ATTACHMENT B CHANGES TO TMI-I NUCLEAR GENERATING STATION INTEGRATED SCHEDULE SEMIANNUAL UPDATE (MAY 4, 1994) 1 CATEGORY A PROJECTS Additions: None Completions: 126236. Revised 10CFR20 Implementation Deletions: None Schedule Changes: None r
i l
i l
ATTACHMENT B (continued)
CATEGORY B PROJECTS Additions: As denoted by
- next to the project title in Attachment A.
Completions: 128097 SQUG Users Group Program 419255 Simulator Modifications 1993' Deletions: None Schedule-Changes: None BA Number Changes: 03S Previous BA Number New BA 3 12694G Eddy Current Testing 126254 4 12694H TMI Inservice Inspection 126255. !
6 128 ADS Pipe Wall Thinning 128186 Monitoring (llR) 12 128 ADS Pipe Wall Thinning 128AEK Monitoring (12R) 20 41994H Simulator Modifications 419266-i 1
4 3 ATTACHMENT B (continued)
CATEGORY C PROJECTS Additions: As denoted by
- next to the project title in Attachment A.
Completions: 128151 Cavity Dosimetry Analysis ,
128160 B&W Owners Group 92/93 i 412577 Additional TB & IB Platforms 419232 Simulator Enhancements 1992 419710 Unit 2 Admin Building i 419735 Security Equipment 1993 419737 TMI Security Enhancements 419737 TMI Security Video Enhancements Deletions: 225012 PDMS Electrical Mods - Funded by PDMS budget 412552 Modifications for Seismic Qualifications Cycle 10 work - No work required 412644 Replace Inverters - Cancelled 418750 Service Building Addition Cycle 10 - Deferred to Cycle 11 419728 Renovate Bldg. 222 - Cancelled BA Number Changes: MS Previous BA Number New BA 26 418ABJ Control Tower 4th Floor 418822 Remodel 55 123ABG RB Preservation 123330 81 12694C Maintenance Training Analysis 126252 83 418807 Plant Preservation 80P 418821 l 88 128ADW Rx Cavity Dosimetry 128AEI 1 89 419735 Security Equipment 4197S0 l
i
!