IR 05000395/2019006

From kanterella
(Redirected from ML20063N762)
Jump to navigation Jump to search
Annual Assessment Letter for Virgil C. Summer Nuclear Station, Unit 1 - NRC Report 05000395/2019006
ML20063N762
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/03/2020
From: Randy Musser
NRC/RGN-II/DRP/RPB3
To: Stoddard D
Dominion Energy Co
References
IR 2019006
Download: ML20063N762 (5)


Text

March 3, 2020

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2019006

Dear Mr. Stoddard:

The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Virgil C. Summer Nuclear Station, Unit 1, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2019 through December 31, 2019.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2021. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. As documented in Inspection Reports 05000395/2019001 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19134A300), 05000395/2019010 (ADAMS Accession No. ML19354A673), and 05000395/2019004 (ADAMS Accession No.

ML20045C719), issued during the period of January 1, 2019, to December 31, 2019, the NRC identified three Severity Level (SL) IV Traditional Enforcement Violations in the area of impeding the regulatory process. However, due to the circumstances associated with the violations the NRC will not conduct IP 92723, Follow-Up to Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, as a traditional enforcement follow-up inspection. The three SL IV violations issued in these inspection reports were the subject of different regulatory requirements and therefore there are no commonalities that would warrant the follow-up review described in IP 92723.

Additionally, during this period the NRC will schedule an additional inspection per a revised version Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4603 with any questions you have regarding this letter.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-395 License Nos.: NPF-12 Enclosure:

Summer Inspection/Activity Plan (03/01/2020 - 12/31/2021)

cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2019006 dated March 3, 2020 DISTRIBUTION:

M. Kowal, RII L. Gibson, RII RIDSNRRDRO RidsNrrPMSummer Resource ROPassessment.Resource ROPreports Resource PUBLIC ADAMS Accession No. ML20063N762 OFFICE RII:DRP/PB3 RII:DRP/PB3 RII:DRPPB3 NAME L. Pressley A. Wilson R. Musser DATE 2/24/2020 2/25/2020 2/27/2020 OFFICAL RECORD COPY

IP 22 Inspection Activity Plan Report Summer 03/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count MATERIAL CONTROL & ACCOUNTING 2 1 04/01/2020 12/31/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

UNIT 1 IN-SERVICE INSPECTION +SG 2 1 04/20/2020 04/24/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3 1 04/20/2020 04/24/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/20/2020 04/24/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 04/20/2020 04/24/2020 IP 71124.04 000728 Occupational Dose Assessment 1 04/20/2020 04/24/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 04/20/2020 04/24/2020 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 1 06/08/2020 06/12/2020 IP 71114.02 000717 Alert and Notification System Testing 1 06/08/2020 06/12/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 06/08/2020 06/12/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 06/08/2020 06/12/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 3 1 09/14/2020 09/18/2020 IP 71130.01 000733 Access Authorization 1 09/14/2020 09/18/2020 IP 71130.02 000734 Access Control 1 09/14/2020 09/18/2020 IP 71130.08 000740 Fitness For Duty Program 1 09/14/2020 09/18/2020 IP 71130.09 001656 Security Plan Changes 1 09/14/2020 09/18/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (TEAM) 2 1 10/26/2020 10/30/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1 11/16/2020 11/20/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3 1 02/01/2021 02/05/2021 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1 02/22/2021 02/26/2021 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Summer 03/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count TARGET SET INSPECTION 2 1 02/08/2021 02/12/2021 IP 71130.14 000743 Review of Power Reactor Target Sets EMERGENCY PREPAREDNESS EXERCISE 5 1 03/01/2021 03/05/2021 IP 71114.01 000716 Exercise Evaluation 1 03/01/2021 03/05/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 03/01/2021 03/05/2021 IP 71151 001397 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 4 1 04/26/2021 04/30/2021 IP 71152B 000747 Problem Identification and Resolution 1 05/10/2021 05/14/2021 IP 71152B 000747 Problem Identification and Resolution RP PUBLIC RAD SAFETY BASELINE INSPECTION 3 1 08/02/2021 08/06/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 08/02/2021 08/06/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 08/02/2021 08/06/2021 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/02/2021 08/06/2021 IP 71151 000746 Performance Indicator Verification SUMMER REQUAL INSPECTION 2 1 08/09/2021 08/13/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance SECURITY BASELINE INSPECTION 1 1 08/16/2021 08/20/2021 IP 71130.02 000734 Access Control 1 08/16/2021 08/20/2021 IP 71130.09 001656 Security Plan Changes 1 08/16/2021 08/20/2021 IP 71151 001338 Performance Indicator Verification UNIT 1 POST-APPROVAL LICENSE RENEWAL PHASE 1 1 1 10/11/2021 10/15/2021 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 1 IN-SERVICE INSPECTION 1 1 10/11/2021 10/15/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL BASELINE INSPECTION 2 1 10/18/2021 10/22/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/18/2021 10/22/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 10/18/2021 10/22/2021 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 2 This report shows only on-site and announced inspection procedures.