ML20059B193

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203 & Notice of Violation.Nrc Concerned Because Any Physical Condition That Can Cause Sudden Incapacitation Is Liability to Safe Operation
ML20059B193
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/22/1993
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccoy C
GEORGIA POWER CO.
Shared Package
ML20059B194 List:
References
NUDOCS 9401040025
Download: ML20059B193 (4)


See also: IR 05000424/1993018

Text

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

t

,

DEC 2 2 S93

, Docket Nos. 50-424, 50-425

! License Nos. NPF-68, NPF-81

,

.

Georgia Power Company

l ATTN: Mr. C. K. McCoy i

Vice President

Vogtle Electric Generating Plant

P. O. Box 1295 i

Birmingham, AL 35201 )

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(INSPECTION REPORT N05. 50-424/93-18 AND 50-425/93-18)

l

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Ronald F. Aiello on November 29 through December 3,1993. The inspection

included a review of activities authorized for your Vogtle Electric Generating

Pl ant. At the conclusion of the inspection, the findings were discussed with

those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures {

and representative records, interviews with personnel, and observation of j

activities in progress.

Based upon the results of the inspection, certain of your activities appeared j

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Enclosure 1). This violation is of concern because any physical

condition that can cause sudden incapacitation is a liability to safe

operation.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to take to prevent recurrence. After reviewing your response

to this Notice, including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC regulatory requirements.

In accordar.ce with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

0300_9

9401040025 931222 ~

PDR

G

ADOCK 05000424

pon.

II(

I

. . _ . . .- _ _ .

i

!

^l,

,  !

Georgia Power Company 2 DE 22 M3 l

i

i

!

Should you have any questions concerning this letter, please contact us.  !

Sincerely, l

!

ORidfNAl.5fGNED BY T./,PEEBLES

l

Thomas A. Peebles, Chief  !

Operations Branch 't

Division of Reactor Safety -l

Enclosure: i

1. Notice of Violation  !

2. NRC Inspection Report

cc w/encis-

J. D. Woodard l'

Senior Vice President-Nuclear

Georgia Power Company I

P. O. Box 1295 i

Birmingham,' AL 35201 i

!

J. B. Beasley -!

General Manager, Plant Vogtle l

Georgia Power Company l

P. O. Box 1600  !

Waynesboro, GA 30830 '

J. A. Bailey

Manager-Licensing  ;

Georgia Power Company i

P. O. Box 1295 i

Birmingham, AL 35201

'

Nancy G. Cowles, Counsel

Office of the Consumer's

Utility Council ,

84 Peachtree Street, NW, Suite 201  ;

Atlanta, GA 30303-2318

Office of Planning and Budget ,

Room 615B

270 Washington Street, SW

Atlanta, GA 30334

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

1

cc w/encls cont'd: (See page 3)

i

. - . . . - . - - . .

l

%

, ~

Georgia Power Company

ULL 2 2.1993  :

-3 t

,

cc w/encls cont'd:

' Harold Reheis, Director

Department of Natural Resources ,

205 Butler Street, SE, Suite 1252

'

Atlanta, GA 30334

Thomas Hill, Manager ,

Radioactive Materials Program

Department of Natural Resources

4244 International Parkway i

-Suite 114

Atlanta, GA 30354

'

Attorney General 7

Law Department

132 Judicial Building

-

Atlanta, GA 30334

'

Dan H. Smith

Vice President  :

Power Supply Operations  :

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker, GA 30085-1349

Charles A. Pat.rizia, Esq.

Paul, Hastings, Janofsky & Walker

12th Floor .

1050 Connecticut Avenue, NW

Washington, D. C. 20036 -

R. E. Dorman, Plant

Training and Emergency

'

Preparedness manager

Vogtle Electric Generating Plant

P. O. Box 1600

Waynesboro, GA 30830

bec w/ encl:

D. Seymour, DRP -!

D. Hood, NRR

J. Jaudon, DRS

G. Hallstrom, DRS

P. Skinner, DRP

A. Herdt, DRP

Document Control Desk

bcc w/encls cont'd: (See page 4)

.

-

.

'

Georgia Power Company 4 DEC 2 2- 1993

bec w/encls cont'd:

NRC Senior Resident Inspector

U.S. Nuclear Regulatory Commission

P. O. Box 572

Waynesboro, GA 30830

x

RII RS 1:DRS RII RS R! P RI :DR

RAiello:rfa/far Eleab' LLadyer PSIthner TPe b es

12/tr/93 12/2/93 12/2h'93 12/ d 93 12/7V 93

Document name: g:\la\vogtle\ril8rpt.rfa