ML20041C349

From kanterella
Jump to navigation Jump to search
Forwards LER 82-004/03L-0
ML20041C349
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/12/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20041C350 List:
References
2CAN028204, 2CAN28204, NUDOCS 8203010201
Download: ML20041C349 (1)


Text

x]

m

. . '. o O

[ r.Ecm' ZD 97 FEB 2 G 1982> 42 ~'

ARKANSAS POWER & LIGHT COMPANY "

mg m.g m POST OFFICE BOX 551 LITTLE ROCK. t.RKANSAS 72203 (501) 371-4000 5M 3 IM .F w?.c /

February 12, 1982 c l, w\w

,! Sf ~

'Al n -

2CAN028204 lU Mr. G. L. Madsen, Chief bE8 2 g jgg'9 ReactorProjectBranch U. S. Nuclear Regulatory Commission ..l Region IV R 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 82-004/03L-0 (File: 2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.9.b, attached is the subject report concerning the inoperability of Control Element Assembly, (CEA)-22, associated with the part length rods for Axial Shape Index (ASI) while in Mode 1 operation.

Very truly yours, John R. Marshall Manager, Licensing JRM:GAC: sl SEB Attachment cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission il /

Washington, D. C. 20555 hDRADO O O 8 MEMBER MIDOLE SOUTH UTILITIES SYSTEM S PDR