ML20023D260

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-106 Re HVAC Hangers Fabricated at Variance W/Design.Initially Reported on 830301.Completion of Evaluation Anticipated by 830705
ML20023D260
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/11/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, CP-83-06, CP-83-6, SDAR-106, TXX-3671, NUDOCS 8305200298
Download: ML20023D260 (1)


Text

1 TEXAS UTILITIES GENEIMTING COMinNY m,niin,s u ,w . . .n u.m. m m., :. ,

tsacu we i e mes+Desst _

wa > .

May 11, 1983 . j TXX-3671 Mr. G. L. Madsen, Chief Reactor Projects Branch 1 U.S. Nuclear Regulatory Conuission Office of Inspection and infrecement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION VENDOR INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE NO.: 10110

Dear Mr. Madsen:

On March 1,1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. We have submitted an interim report logged TXX-3651, dated March 29, 1983.

We are continuing our evaluation and anticipate completion of our evaluation by July 5, 1983.

Very truly yours,

$5 y R. J. Gary RJG:eaq cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 8305200298 830511 PDR S

ADOCK 05000445 PDR 1E-2.7

- - _ - -