LER 83-035/03L-0:on 830406,offgas Hydrogen Analyzer 1A Not Maintaining Proper Vacuum & Analyzer 1B Not Wired Properly. Caused by Dirty Flame Arrestor on Analyzer A.Flame Arrestor Cleaned.Analyzer B Rewired
ML20023C506
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 05/04/1983
From: Houston R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20023C500 List:
References
LER-83-035-03L, LER-83-35-3L, NUDOCS 8305170388
Download: ML20023C506 (2)


Text

r -

I

_p.m * ~

, LICENSEE EVENT REPORT IPt. EASE PRINT OR TYPE ALL RECURRE3 888FERSAATIONI' CONTROL sLOCx: l l l 1 1 I f o l t ) l il UCEN885 Ll Ll S l Cl 1l@l 010 l -l 0101010101 UCENSE NUMOEn

-l 0 l 02h@l28 41110 l0 ! O !@l$7 CAT 54l@

uCEN54 TYPE JO l

7 8 9 COQE 14 15 CON'T l0{tl ,e l60 L @l 015101010  ! 31713 @l okVENT l 4101618131@l015101418 I4 7S REPORT DATE So I 31@

61 DOCKETN6 keta 65 09 DATE 2 8 EVENT DESCRIPTION AND PROSASLE CONSEQUENCES O'o On April 6,1983 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the Off Gas "A" Hydrogen Analyzer was noted to have [

gl gg problems maintaining proper vacuum. The "1B" Analyzer would not operate properly  ;

Rad / Chem. was notified to take grab samples once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per Tech Spec. g

,og,, e i the r.

g ; 3.3.7.11. The maximum hydrogen concentration in the Rad / Chem samples was 0.08%

,,g,g hydrogen, therefore the Off Gas Hydrogen Recombiner operated properly throughout the event, g la trl l I

ITTTl 1 so CODE COO sus E COMPONENT CODE *s sueCoog toisi IMIBl@ W @ W @ ll uIN lS lT lR lU l@ .@@ Z g i, i.

1 . . ia ii LER

@ ,ag/MO 18 I 31 EVENTTIAA

_an 22 L--J a

l 24 13 15 I n

I'l as i

a I 31 a

L'J ao L_

.u

' O a

N EEd cET ** u W wOuns *Es5*TrE# po 7n "Es'ruY" 3un. mA Y=uan wegJ@ yJ@ yJ@ 10 lo lo 1 J p@ 1,p@ p@ (G l 0 [8 ,, ,

lg CAusa DESCRIPTION AND CORRECTIVE ACTIONS @

When a calibration timer

, ,o g l The flame arrestor in the "A" Analyzer required cleaning.

g "B" Analyzer, the purge timer was inadvertently wired ,

g g was replaced on 3/17/83 in the "B" Analyzer gi ncorrectly. The work on the "A" Analyzer was completed on 4/8/83, the g

gwiring corrected on 4/26/83.

' I ITTT1 I so OTHER STATUS iO R DeMOVERY DESCnsPTION A  % POwen l

l l i i s l [B_j@ l 0 l 2 l 3 l@l NA a

l leA [@[g Observation so l

7 s ,g,,v,,y ,rj,,,,

i u n LOCATION OF RELEASa @

l mai.eAsso Os metsASE AMOUNTOp NA ACTtytTY l

@l NA l l t is' l' W @ 'W@l PEnsO==Ei. axPCsvEes muusen Typt otsCnimos @ l NA Q l *0 *l 0 l 0 l@l Zl@l"

l '

PensOmme'L inau'Ess Nuween OssCnimON@ .

l.

NA It l a l l 0 l 0 l. 011l@]12 30 7 8 9 E Ce PT ON .

NA .l I1 7

I 98 9l l Zlhl10 30

, 5{gByhh3 PDR ..A l NRC USE ONLY lt;;;;;;Jgg l.

l2 lol , g og 68 SS 30. ;

F 8 9 R. W. Houston (815) 357-6761- o g

PHomIE:

. . - _ . --* NAME OF PRE. PARER---

t A

1. LER NUMBER: 83-035/03L-0
11. LASALLE COUNTY STATION: Unit 1 111. DOCKET NUMBER: 050-373 IV. EVENT DESCRIPTION:

On April 6',1983 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the Off Gas "1 A" Hydrogen Analyzer was noted to have problems maintaining the proper vacuum within its sampling system.

The "1B" Hydrogen Analyzer would not operate properly either. Rad / Chem was notified to collect grab samples once per four (4) hours per Technical Speci fication 3.3.7.11.

V. PROBABLE CONSEQUENCES OF THE OCCURRENCE:

At the time of the occurrence, the reactor was in the RUN Mode at 760 MWT, 240 MWE. The maximum Hydorgen Concentration in the Rad / Chem samples was 0.08% Hydrogen; therefore, the Off' Gas Hydrogen Recombiner operated properly throughout the event. Safe plant operation was maintained at all times.

Other failures of the Hydrogen Analyzers were reported in LER 82-104,82-120, 82-147, and 83-25 VI. CAUSE:

The flame arrestor in the "A" Analyzer required ~ cleaning. This caused the l vacuum problems.

I On 3/17/83 the calibration timer on the "B" Analyzer was replaced, in the l process of replacement, the purge timer was inadvertently wired incorrectly.

l This caused the "B" Analyzer to remain in the calibration mode.

These Analyzers are G. E. Model OGA 200AB.

Vll. CORRECTIVE ACTION:

Work Request #L23788 on the "A" Analyzer was completed on 4/8/83. The Analyzer sas then calibrated satisfactorily per LIS-0G-06.

l Work Request #L23913 was written on the "B" Analyzer and completed on 4/26/83. Testing on the Analyzer will be performed following Unit I startup af ter this April outage to prove satisfactory performance.

Preparea by: R. W. Houston l