LER 83-093/03L-0:on 830801,discovered full-in Indication on Core Display for Control Rod 34-47 Inoperable.Caused by Failed Switching Transistor on Data Memory Board 19.Data Memory Board replaced.W/830826 Ltr
ML20024E912
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 08/26/1983
From: Diederich G, Winterhoff D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
LER-83-093-03L, LER-83-93-3L, NUDOCS 8309070197
Download: ML20024E912 (3)


Text

.

LICENSEE EVENT REPORT CCNTROL BLOCK: l l 1 l l l Ih e

- (PLEASE PRINT OR T'f PE ALL RECUiRED tr#0RMATICN)

Ti3 !9 t 1 L'l L l S I C l 1 l@l 15 010 l - 10 bsCENSE ! O l N6MSER 01010 l- l 010 23l@l26411Ls10 ENSE!OTYPE 10'JO!@l6 7 CAT l lg 54 LaCENSEE CO;g to T-*

31 ,"g " l L }@l 0151010 t o 13171368'@l690181011 EVENT DATE 18137'l@l0 75 18PEPORT 12 16 DATE l 813ECl@

4 60 El Oc;KET NWMg ER EVENT DESCRIPTION AND PRCSA8LE CCNSECUENCES h

. _._: i l On August 1,19.83 at 2150 hours0.0249 days <br />0.597 hours <br />0.00355 weeks <br />8.18075e-4 months <br /> , durina LOS- AA-W1 ope rations di scovered that t h'e 9

,3; g

" Full In" indication on the core display for control rod 34-47 was inoperable. conse ;

,,, ; quences of this event were minimal since all remaining position indicators for control ;

i red 34-47 we re operable and the cont rol rod was " Full In" Safe operation of the  ;

g i plant was maintained. 9 T ! I 3 i6 j I i

40 SYTTEM CAUSE CALSE C3na'. VALV E CCCE CCDE SUSCODE COMPON ENT CODE tus: ODE SUECODE

'~ '

r'- '(C-v t g !@

v 8

- f % f( 19 10 l[ (c lif f@

- v

's 2j@ v g[ t/Q

a v

_.5 9 $c 1: .;  :: 1E

$E CL ENTI AL CCOUREENCg ses;RT R EVISION EV ENT YEAA REPomT NO. CODE TYPE N y ]Sl

. > @ , reg LER/RO l218 13 l 2

' ]_l 23 l Oi 91 31 24 ;6 lpj 17 l0l31 23 29 30 U

31  ;;

ATTACwutNT N8mD 4 PmtME Coup. COMPCNENT ACTION FUTURE EFFECT SHUTDOWN FORM but sVPPL ER uANUPAcTURER TAKEN ACTICN ON PLANT METMCD MOURS SUsMITTED U@l 342 l@ l Zl@ y@ l0 10 l0 l l lYl@

    • l42N l@ [N l@ lG l0 18 l0lg 44 47 L3 26 36 33 40 43 CAUSE CESCRIPTION ANO CCARECT1VE ACTIONS h 33, l The inoperable " Full IN" inoication was caused by a failed swi tching t ransistor on j data riemory board #19 located in file 3 on canel 1H13-P603. Failure was a result of

~

,  ; l 9 normal usage. Data memory board was replaced and a revision was requested to LOS-AA- ;

,3j l S1 requiring a core display la5p test be r erformed each shi f t . l I

.4 i1 -

ce

  1. -"vE*Y OE10RfMCN
-$$ N#0wEm OT*ERSTA*V3 15 ,

NA l l 4 e i l 5 Q 101617 l@l l A l@l yObse rvat icn

, F:

wv,w ::c TNT .

= E .,E ASED 08 C E'.E ASE WO'4NT 05 AO*1V!"Y -- , , ,

L3:ATron cF n E*.EACE -

l

~. jZlQlZIQl NA l f 1"

40

- 64 45 8 9 1C 11 PE*SCNNEL E XPCS.;sts

%v!!n vee OEs:A!P?i O N l

-1 l 0 1 0 l 0 Ig l Z @ l NA 30 1 3 g it 12 13 PERSONNEL INJUntEs Ntvsfa CE30MIPTION NA .  !.

isjl0l0l0l@l 80 t 9 in 1:

LCSS OF CR CAMAGE TC FACLITY ga TYoE

  • O E SCRI* TION NA

- IslIZl@l 2

a s :c NRC USE CNLY Pue.iciw . 8309070197 830826 ,

,'OfI its-gE:I I t:calPTION -

NA PDR ADOCK 05000373 g gi;;;;;;;gi;l?

S PDR se .. se. :.

D. winte rhof f FWCNr.--

815/357-6761  ?

NAvgOccogcAcgR c

i. LER NUMBER: 83-093/03L-0 II. LASALLE COUNTY STATION: Unit I lit. ' DOCKET, NUMBER: ,050-373 . .,

IV. EVENT DESCRIPTION:

On August 1,1983 at. 2150 hours0.0249 days <br />0.597 hours <br />0.00355 weeks <br />8.18075e-4 months <br />, during the performance of LOS-AA-Wl, Technical Speci ficati.ons Weekly Surveillance, operations discovered, following a core display lamp test, that the " Full IN'_ indication on the core display for control red 34 47 was inoperable. The cont rol rod was " Full-IN' per Nuclear Engineer's Rod Secuence. Technicsl Speci fication 3.1.3.7.a.2 action s tategent .vas _ ente red .

V. PROSABLI CONSEC:UENCES OF THE OCCUBRENCE:

At the time of the occurrence, LaSalle Unit I was in ope rst ional condi tion 1, RUN mode, generating 2240 mwt. . Consequences of this event were minimal since all remaining position Indicators for control rod 34-47 were operable. Also, control rod 34-47 was the only control rod on the core display with an inop-

-:- -e;-ic- :rdi z n- 53 c e ore stien -f-Le alt-: s air.trined at all t i r.e s .

^ " " ' #'

' ~ " ' ' '"M t ^ ' " ' *

'VII "CAUSE': '

The-inoperable "Ful1 In" indication for control . rod 34-47 was caused by the -

thermal destruction of a switching transistor on Data Memory Board #19 located i n fi le 3 on cont rol room pane l lH13-P603. This transistor was located on the memory data board to energize the " Full In" li ght when requi red by the circuit logic. Failure of this transistor was caused by normal usage. Ci r-cult design or application did not contribute to the failure.

Vll. CORRECTIVE ACTION: -

~

In accordance wi th Technical Speci fication 3.1.3.7.a.2, ooe rations determined the control rod position by cycling the control rod to an operable posi tion i n d i ca to r. Work Request L26432 was generated and assigned to the Instrument Maintenance Department. They investigated the Data Memory Board #19 which controls core display light indication for cont rol rod 34-47 and discovered a failed switching transistor for the " Full In" circuit. The ins t rument Main-tenance Department replaced Data Memory Board #19 wi th a "like equivalent" r-c- the sic ercom "r ui! fn" iadicatio- #ce certrol -ed 3L 47 -#c -e=tored en Aucust 3, 1983 No problems have been encountered wirr the " Full In" indication for control rod 34 L7 cince, in order for operations to have an accurate representatien of cont rol rod core display indication (" Full IN', " Full Out". SCRAM. " Accu,ulator Trouble", etc.)

AIR 01-83-67059 was generated requesting a revision to LOS-AA-Si requi ring a core display lamp test be performed each shi ft.

Prepared by: D. Winterhof f L J

l

- /'~ COmmORWealth Edison

e. [ = LaSalle County Nuclist Stition -

( -- y) -' Rural Route #1, Box 220 v

\ / Marseilles, Illinois 61341 N y Telephone 815/357-6761 August 26, 1983 James G. Keppler Regional Administrator Region lil U. S. Nuclear Regulatory Commission '

799 Roosevelt Road Glen Ellyn, IL 60137

Dear Sir:

Reportable Occurrence Report #83-093/03L-0 Docket #050-373 is being submitted to your office in accordance with LaSalle County Nuclear Power Station Techni-cal Speci fication 6.6.B.2,(b), conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown requi red by a limiting condition for operation, bb G. J. Diederich Superintendent LaSalle County Station GJD/GW/rg Enclosu re cc: Di rector of Inspection & Enforcement Di rector of Management Information & Program Cont rol U, S. NRC Document Management Branch INPO-Records Center File /NRC r- p SEP 1 1983 A 9 t I