Text
- - _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ - _ - _ _ _
7.
l l
l LASALLE NUCLEAR POWER STATION l
t UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l
COMMONWEALTH EDISON COMPANY l
l l
NRC DOCKET NO. 050-373 NRC DOCKET NO. 050-374 i
LICENSE NO. NPF-11 l
LICENSE NO. NPF-18
)
I I
l 9805260275 990513
\\
PDR ADOCK 05000373 i R
PDR i
i___________..__..____________. _ _ _ _ _ _ _ _ _ _. _ _ _ _. _ _. _ _ _ _ _ _ _ _ _ _ _
i I
TABLE OF CONTENTS l.
Monthly Report for LaSalle Unit One A. Operating Data Summary B. Unit Shutdowns and Operating Summary C. Unique Reporting Requirements ll.
Monthly Report for LaSalle Unit Two A. Operating Data Summary B. Unit Shutdowns and Operating Summary C. Unique Reporting Requirements
- l. Monthly Report for LaSalle Unit One-April,1998 A. OPERATING DATA
SUMMARY
FOR UNIT ONE DOCKET NO.:
050-373 UNIT:
LaSalle One DATE:
05 01/98 COMPLETED BY:
S. Anderson TELEPHONE:
(815)357-6761 x2620
- 1. Reporting Period: April,1998 Gross Hours: 719
- 2. Currently Authorized Power Level: 3,323 (MWt)
Design Electrical Rating: 1,078 (MWe-net)
Max Dependable Capacity: 1,036 (MWe-net)
- 3. Power Level To Which Restricted (if Any): None
- 4. Reasons For Restriction (if Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE 5.
Reactor Critical Hours 0.0 0.0 78,741.9 6.
Reactor Reserve 0.0 0.0 1,641.2 Shutdown Hours 7.
Hours Generator On-0.0 0.0 76,838.0 Line 8.
Unit Reserve 0.0 0.0 1.0 Shutdown Hours 9.
Gross Therrnal 0.0 0.0 228,599,589 Energy (MWHt) 10.
Gross Electric Energy 0.0 0.0 76,450,484 (MWHe) 11.
Net Electrical Energy 0.0 0.0 73,669,454 (MWHe) 12.
Reactor Service 0.0 0.0 62.7 Factor (%)
13.
Reactor Availability 0.0 0.0 64.0 Factor (%)
14.
Unit Service Factor 0.O 0.0 61.2
(%)
15.
Unit Availabildy 0.0 0.0 61.2 Factor 16.
Unit Capacity Factor 0.0 0.0 56.6 (MDC) 17.
Unit Capacity Factor 0.0 0.0 54.4 (design MWe) 18.
Unit Forced Outage 100.0 100.0 12.2 Factor (%)
- 19. Shutdowns Scheduled Over Next 6 Months: None
- 20. If Shutdown at End of Report Period, Date of Startup: 06/26/98
a B. UNIT SHUTDOWNS AND OPERATING
SUMMARY
REPORT MONTH APRIL 1998 NO DATE TYPE (1)
DURATION REASON METHOD OF CORRECTIVE ACTIONS /
(HOURS)*
(2)
SHUTTING COMMENTS DOWN REACTOR (3) 06 98/01/01 F
2160 D
2 Management re-reviewed the circumstances for the shutdown and determined that the outage would be reclassified as forced due to regulatory concerns.
SUMMARY
The unit remained shutdown for the entire report period.
I Year-to-date forced outage hours = 2879 Cumulative forced outage hours = 10,687.5 l
TABLE KEY:
(1)
(3)
F: Forced Method:
S: Scheduled
- 1. Manual
- 2. Manual Scram (2)
- 3. Automatic Scram Reason:
- 4. Continuation i
A Equipment Failura (Explain)
- 5. Other (Explain) l l
B Maintenance or Test j
C Refueling D Regulatory Restriction j
E Operator / Licensing Exam F Administrative 3
G Operational Error (Explain) j H Other (Explain) l
{
l l
l L.
C. UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE
- 1. Challenges other than routine surveillance testing to Safety / Relief Valve Operations--None
- 2. Major Changes to Radioactive Waste Treatment System--None
- 3. Off-Site Dose Calculation Manual Changes:
The following changes were made to the Site Specific Off-Site Dose Calculation Manual in April 1998:
Several editorial changes were made, i.e. page renumbering, typographical error correction, etc.
Revised methodology for establishing the Off-Gas Retreatment Radiation Monitor setpoints in section 10.1.3.1.2 to be in compliance with Technical Specification ammendment #115. The High Alarm will be established at 1.5 times background, and the High-High Alarm will be established in the manner in which the High Alarm was established prior to the ammendment, in accordance with Tech Spec 3.11.2.2.
Revised section 10.2.4 to clarify that the allocation of effluents from common release points will be e
attributed equally, on half for Unit 1 and one half for Unit 2. This change is made to reflect the fact that Radwaste cannot accurately determine which unit contributed the liquid waste.
Clarified the requirements for food product sampling to reflect the fact that food samples may not be available in each of the four major quadrants.
Clarified applicability statement in section 12.2.1.A to "At all times, when flow is present in the system" Added note to tables 12.2.1-1 and 12.2.2-1 stating the requirements for actions 101 and 110-112 if the e
condition exceeds 30 days.
Added wording to the Bases for section 12.3.3, allowing bypass of radwaste system to reflect the use of the portable waste treatment equipment.
Ammended actions in sections 12.4.2.A and 12.4.3.A to reference appropriate reporting requirements in 10 CFR 50.
Added qualifying statement to vegetation sampling requirements in table 12.5-1. Vegetation is to be sampled when available.
Changed tritium low level detection value for water in table 12.-5.3 from 200 to 2000 picocurries per liter to be consistent with Generic Letter 89-01 requirements.
Added a note to table 12.5-3 stating that the low level detection value for tritium in water is 200 pico-curries per liter for off-site analyses.
l l
1 l
lL Monthly Report for LaSalle Unit Two-April,1998 8
8 A. OPERATING DATA
SUMMARY
FOR UNIT TWO DOCKET NO.:
050-374 UNIT:
LaSalle Two DATE:
05/01/98 COMPLETED BY:
S. Anderson TELEPHONE:
(815)357-6761 x2620
- 1. Reporting Period: April,1998 Gross Hours: 719
- 2. Currently Authorized Power Level: 3,323 (MWt)
Design Electrical Rating: 1,078 (MWe-net) 1 Max Dependable Capacity: 1,036 (MWe-net)
- 3. Power Level To Which Re;*ricted (if Any): None
- 4. Reasons For Restriction (if Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE l
5.
Reactor Critical Hours 0.0 0.0 77,028.4 l
6.
Reactor Reserve 0.0 0.0 1,716.9 Shutdown Hours 7.
Hours Generator On-0.0 0.0 75,970.2 I
Une 8.
Unit Reserve 0.0 0.0 0.0 Shutdown Hours 9.
Gross Therrnal 0.0 0.0 230,522,687 Energy (MWHt) 10.
Gross Electric Energy 0.0 0.0 77,175,924 (MWHe) 11.
Net Electrical Energy 0.0 0.0 73,973,643 l
(MWHe) 12.
Reactor Service 0.0 0.0 64.9 Factor (%)
13.
Reactor Availability 0.0 0.0 66.4 Factor (%)
14.
Unit Service Factor 0.0 0.0 64.0 l
(%)
l-15.
Unit Availabikty 0.0 0.0 64.0 Factor 16.
Unit Capacity Factor 0.0 0.0 60.2 (MDC) 17.
Unit Capacity Factor 0.0 0.0 57.8 (design MWe) 18.
Unit Forced Outage 100.0 100.0 12.2 Factor (%)
- 19. Shutdowns Scheduled Over Next 6 Months: None
- 20. If Shutdown at End of Report Period, Date of Startup: To be determined L _ __ _ _ _-__-