Text
-
~
. ~.
Commonwealth filium Company 125alle Generating $tation g
2(o1. North 2ist Road 1~
Marwilles, IL 61311-9757 Tel 815-3574>761.
September 10,1998 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Monthly Performance Report for August,1998 LaSalle County Nuclear Power Station, Units 1 and 2 Facility Operating License NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Enclosed is the LaSalle County Station Monthly Performance Report for the month of August 1998, if there are any questions or comments conceming this letter, please refer i
them to Perry Barnes, Regulatory Assurance Manager, (815) 357-6761, extension 2383.
Respe tfully, j
f J
i Q.
\\
Fred R. Dacimo i
Site Vice President LaSalle County Station Enclosure
\\
cc:
J. L. Caldwell, Acting NRC Region 111 Administrator
\\
l M. P. Huber, NRC Senior Resident inspector - LaSalle j
D. M. Skay, Project Manager - NRR - LaSalle J. Roman, IDNS Inspector - LaSalle F. Niziolek, Office of Nuclear Facility Safety - IDNS 9909150142 900831
~
E. l C (.
DR ADOCK O 33 A Unicom Compan) j
dh,pd.44
-4.-.9
.A_4 E.4 1,ms J,-5 4
.$,M.,._*1 J.e 44,--.
4_A e
>-A L.amA_3.L.2-
.J a_4.___a
_+,s_,.4<A
_a A26 su 22.uu,.,
AA_..aA A.4._,~..4-4
_m.4,1_A,4J4a...Am4s-,.a.___m'u 8
4 I
LASALLE NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-373 NRC DOCKET NO. 050-374 LICENSE NO. NPF-11 LICENSE NO. NPF-18 i
..__m
-TABLE OF CONTENTS 1.
Monthly Report for LaSalle Unit One A. Operating Data Summary
' B. Unit Shutdowns and Operating Summary
{
C. Unique Reporting Requirements j
l 11.
Monthly Report for LaSalle Unit Two j
A. Operating Data Summary B. Unit Shutdowns and Operating Summary C. Unique Reporting Requirements
)
i i
l l
i l
4 4
i '
i i
_ ~
1, Monthly Report for LaSalle Unit One--August,1998 A. OPERATING DATA
SUMMARY
FOR UNIT ONE DOCKET NO.:
050-373 UNIT:
LaSalle One
- DATE:
September 2,1998 COMPLETED BY:
S. Anderson TELEPHONE:
(815) 357-6761 x2620
- 1. Reporting Period: August,1998 Gross Hours: 744
- 2. Currently Authorized Power Level: 3,323 (MWt)
Design Electrical Rating: 1,078 (MWe-net)
Max Dependable Capacity: 1,036 (MWe-net) 1
- 3. Power Level To Which Restricted (if Am
- 4. Reasons For Restriction (if Any): N/A
)
THIS MONTH YEAR.-TO-DATE CUMULATIVE 5.
Reactor Critical 597.9 597.9 79,339.8 Hours
,J 6.
Reactor Reserve 0.0 0.0 1,641.2 Shutdown Hours 7.
Hours Generator On-405.9 405.9 77,243.9 Line 8.
Unit Reserve 0.0 0.0 1.0 Shutdown Hours g,
Gross Thermal 928,440 928,440 229,528,029 Energy (MWHt)
?
10.
Gross Electric Energy 294,205 294,205 76,744,689
)
(MWHe) 11.
Not Electrical Energy 285,698 285,698 73,955,152 (MWHe) 12.
Reactor Service 80.4 10.3 61.7 Factor (%)
13.
Reactor Availability 80.4 10.3 63.0 Factor (%)
14.
Unit Service Factor 54.6 7.0 60.1
(%)
15.
Unit Availability 54.6 7.0 60.1 Factor 16.
Unit Capacity Factor 37.1 4.7 55.5 (MDC) 17.
Unit Capacity Factor 35.6 4.5 53.4 (design MWe) 18.
Unit Forced Outage 44.9 93.0 14.6 Factor (%)
- 19. Shutdowns Scheduled Over Next 6 Months: None
- 20. If Shutdown at End of Report Period, Date of Startup: N/A m
l l
I e
l; l
B. UNIT SHUTDOWNS AND OPERATING
SUMMARY
3 REPORT MONTH AUGUST 1998
\\
NO DATE TYPE (1)
DURATION REASON METHOD OF CORRECTIVE ACTIONS /
(HOURS)*
(2)
SHUTTING COMMENTS DOWN l
REACTOR (3) 1 98/01/01 F
5,363.7 D
2 Management re-reviewed the circumstances for the shutdown and determined that the outage j
would be reclassified as forced due to regulatory concems.
2 98/08/19 F
55.6 A
2
- A manual SCRAM was inserted due to increasing Reactor Water l
Level while placing the 'A' TDRFP on-line during power j
ascension. A Flow Controller Card was replaced prior to resuming operation.
j
SUMMARY
The Unit retumed to service on August 8,1998 following startup activities which began on August 1,1998. In accordance with normal soft shutdown procedures, a manual Scram was inserted during startup activities to allow repairs to be effected on inoperable Intermediate Range Monitors in order to avoid normal operation in a i
half Scram configuration. While shutdown, repairs were also made to the RCIC 19 and Throttle Valve and the 'A' Reactor Water Recirculation Flow Control Valve position indication feedback loop. Startup activities -
were resumed on August 7,1998, and the generator was placed on-line at 12:40 on August 12,1998, j
A Manual Scram was inserted on~ August 19,1998 at 58% power due to increasing Reactor Water Level while placing the 'A' Turbine Driven Reactor Feedpump on-line during power ascension. Following replacement of c f:iled Flow Controller Card in the Reactor Water Level Control System, operation was resumed on August 20,11998. The generator was piaced on-line at 19:56 on August 21,1998, and the unit achieved full power operation on August 26,1998.
Ycar-to-date forced outage hours'= 5,419.3 l
Cumulative forced outage hours = 13,227.8 TABLE KEY:
(1)
(3)
- F: Forced Method:
S: Scheduled
- 1. Manual
- 2. Manual Scram (2)
- 3. Automatic Scram Reason:
- 4. Continuation A Equipment Failure (Explain)
- 5. Other (Explain)
B Maintenance or Test I
~ C Refueling i
D Regulatory Restriction E Operator / Licensing Exam l.
F Administrative l
G Operational Error (Explain) f H Other (Explain) l T
.~ -
._.m.
_ - _.... _ ~_
C. UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE t
.1.- Challenges other than routine surveillance testing to Safety / Relief Valve Operations-None
- 2. Major Changes to Radioactive Waste Treatment System-None
- 3. Off-Site Dose Calculation Manual Changes--None
?
6 h
\\
i l
i l
l l'
l I
i l
I
l II, Monthly Report for LaSalle Unit Two--August,1998 A. OPERATING DA'TA
SUMMARY
FOR UNIT TWO DOCKET NO.:
050-374 UNIT:
LaSalle Two DATE:
September 2,1998 COMPLETED BY:
S. Anderson TELEPHONE:
(815) 357-6761 x2620
- 1. Reporting Period: August,1998 Gross Hours: 744
- 2. Currently Authorized Power Level: 3,323 (MWt)
Design Electrical Rating: 1,078 (MWe-net)
Max n spendable Capacity: 1,036 (MWe-net)
' 3. Power Level To Which Restricted (if Any): None
- 4. Reasons For Restriction (if Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE 5.
Reactor Critical 0.0 0.0 77,028.4 Hours 6.
Reactor Reserve 0.0 0.0 1,716.9 Shutdown Hours 7.
Hours Generator On-0.0 0.0 75,970.2 Line 8.
Unit Reserve 0.0 0.0 0.0 Shutdown Hours g,
Gross Thermal 0.0 0.0 230,522,687 Energy (MWHt) 10.
Gross Electric Energy 0.0 0.0 77,175,924 (MWHe) 11.
Net Electrical Energy 0.0 0.0 73,973,643 (MWHe) 12.
Reactor Service 0.0 0.0 63.4 Factor (%)
13.
Reactor Availability 0.0 0.0 64.8 Factor (%)
14.
Unit Service Factor 0.0 0.0 62.5
(%)
15.
Unit Availability 0.0 0.0 62.5 Factor-16.
Unit Capacity Factor 0.0 0.0 58.7 (MDC) 17.
Unit Capacity Factor 0.0 0.0 56.4 (design MWe) 18.
Unit Forced Outage 100.0 100.0 15.1 Factor (%)
l
- 19. Shutdowns Scheduled Over Next 6 Months: None
- 20. If Shutdown at End of Report Period, Date of Startup: March 28,1999 l
l
i l
l B. UNIT SHUTDOWNS AND OPERATING
SUMMARY
REPORT MONTH AUGUST 1998 l
l NO DATE TYPE DURATION REASON (2)
METHOD OF CORRECTIVE ACTIONS!
(1)
(HOURS)*
SHUTTING COMMENTS DOWN REACTOR (3) 07 98/01/01 F
5,831 D
2 Management re-reviewed the circumstances for the shutdown and determined that the outage would be reclassified as forced due to regulatory concerns.
E t
~
SUMMARY
The unit remained shutdown for the entire report period.
Ycar-to-date forced outage hours = 5,831 Cumulative forced outage hours = 13,463.3 TABLE KEY:
(1)
(3)
F: Forced Method:
S: Scheduled
- 1. Manual
- 2. Manual Scram (2)
- 3. Automatic Scram Reason:
- 4. Continuation A Equipment Failure (Explain)
- 5. Other (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator / Licensing Exam F Administrative G Operational Error (Explain)
H Other (Explain) i i
i
l E
I C. UNIQUE REPORTING REQUIREMENTS FOR UNIT TWO i
l
- 1. Challenges other than routine surveillance testing to Safety / Relief Valve Operations-None
- 2. Major Changes to Radioactive Waste Treatment Systems--None
- 3. Off Site Dose Calculation Manual Changes-None j
s 5
i Il.
i