Commonwcatth I'dhon Com]uny 1; Nile bencrating Atation NiO) North.!!st Road Alarwilles. 11.61311 9'5' rem s-3su,7ni
~
March 15,1999 i
United States Nuclear Regulatory Commission i
Attention: Document Control Desk Washingtnn, D.C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Monthly Performance Report for February,1999 Enclosed is the LaSalle County Station Monthly Performance Report for the month of February,1999.
Should you have any questions concerning this letter, please contact Mr. Robert R. Brady, Regulatory Assurance Manager, at (815) 357-6761, extension 2383.
Respectfully,
/
Jeffrey A. Benjamin Site Vice President LaSalle County Station Enclosure cc:
Regional Administrator - NRC Region 111
.i NRC Senior Resident inspector - LaSalle County Station
$b l
,,oa2ao29,,9o22e
~
PDR ADOCK 05000373
_.L j
R PDM A 1:nicom e omp;n) a
' '(
i LASALLE COUNTY STATION i
UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEAL TH EDISON COMPANY NRC DOCKET NO. 50-373 NRC DOCKET NO. 50-374 LICENSE NO. NPF-11 LICENSE NO. NPF-18 l
l
g.
TABLE OF CONTENTS 1.
' Monthly Report for LaSalle Unit One A.~ Operating Data Summary B. Unit Shutdowns and Operating Summary C. Unique Reporting Requirements 11.
Monthly Report for LaSalle Unit Two A. Operating Data Summary B. Unit Shutdowns and Operating Summary C. Unique Reporting Requirements 1
i i
l l
i r
1
)
- 1. Monthly Report for LaSalle County Station Unit One--February,1999 A. OPERATING DATA
SUMMARY
FOR UNIT ONE DOCKET NO.:
50-373 UNIT:
LaSalle One DATE:
March 1,1999 COMPLETED BY:
S. Anderson TELEPHONE:
(815) 357-6761 x2620
- 1. Repoiting Period: February,1999 Gross Hours: 672
- 2. Currently Authorized Power Level: 3,323 (MWt) 3 Design Electrical Rating: 1,078 (MWe-net)
Max Dependable Capacity: 1,036 (MWe-net) l
- 3. Power Level To Which Restricted (If Any): None i
- 4. Reasons For Restriction (If Any): N/A THIS MONTH YEAR-TO-DATE -
CUMULATIVE 5.
Reactor Critical Hours 672 1,416 83,539.9
+
6.
Reactor Reserve 0.0 0.0 1,641.2 Shutdown Hours 7.
Hours Generator On-672 1,416 81,429.6 une 1
8.
Unit Reserve 0.0 0.0 1.0 Shutdown Hours
)
9.
Gross Thermal 2,230,376 4,663,540 243,342,890 Energy (MWHt) l 10.
Gross Electric Energy 763,309 1,596,382 81,458,633 (MWHe) 11.
Net Electrical Energy 745,166 1,558,270 78,564,396 (MWHe) 12.
Reactor Service 100.0 100.0 62.8 j
Factor (%)
13.
Reactor Availabikty 100.0 100.0 64.1 Factor (%)
14.
Unit Service Factor 100.0 100.0 61.3
(%)
15.
Unit Availability 100.0 100.0 61.3 Factor 16.
Unit Capacity Factor 107.0 106.2 57.0 1
(MDC) 17.
Unit Capacity Factor 102.9 102.1 54.8 4
(design MWe) 18.
Unit Forced Outage 0.0 0.0 14.0 Factor (%)
i
- 19. Shutdowns Scheduled Over Next 6 Months:
None
- 20. If Shutdown at End of Repott Period, Date of Startup: N/A
t l
l l
B. UNIT SHUTDOWNS AND OPERATING
SUMMARY
l REPORT MONTH FEBRUARY 1999 NO DATE TYPE (1)
DURATION REASON METHOD OF CORRECTIVE ACTIONS /
(HOURS)*
(2)
SHUTTING COMMENTS DOWN REACTOR (3) 1 None 4
SUMMARY
l Th3 Unit operated at 100% during February 1999 with the exception of one short downpower. This downpower occurred on February 18,1999, and lasted approximately one hour and 45 minutes. The purpose of the i
downpower was to perform MSIV Scram Functional testing and Turbine Control Valve testing.
Year-to-data forced outage hours = 0.0 Cumulative forced outage hours = 13,227.8 TABLE KEY:
(1)
(3)
F: Forced Method:
S: Scheduled
- 1. Manual
- 2. Manual Scram (2)
- 3. Automatic Scram Reason:
- 4. Continuation A Equipment Failure (Explain)
- 5. Other (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator / Licensing Exam F Administrative G Operational Error (Explain) i H Other (Explain) 1 l
l
=.
~..
~ - - _
=
C. UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE
- 1.. Chalie.iges other than routine surveillance testing to Safety / Relief Valve Operations-None i
- 12. Major Changes to Radioactive'Weste Treatment System-None
- 3. Off-Site Dose Calculation Manual Changes-None i
i s
l i
l l
II. Monthly Report for LaSalle County Station Unit Two--February,1999 A. OPE' RATING DATA
SUMMARY
FOR UNIT TWO DOCKET NO.:
50-374 UNIT:
LaSalle Two DATE:
March 1,1999 COMPLETED BY:
S. Anderson TELEPHONE:
(815) 357-6761 x2620 l
- 1. Reporting Period: February,1999 Gross Hours: 672 l
- 2. Currently Authorized Power Level: 3,323 (MWt)
Design Electrical Rating: 1,078 (MWe-net)
Max Dependable Capacity: 1,036 (MWe-net)
- 3. Power Level To Which Restricted (If Any): None
- 4. Reasons For Restriction (If Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE 5.
Reactor Critical Hours 0.0 0.0 77,028.4 4
6.
Reactor Roserve 0.0 0.0 1,716.9 Shutdown Hours I
7.
Hours Generator On-0.0 0.0 75,970.2 Line 8.
Unit Reserve 0.0 0.0 0.0 Shutdown Hours 9.
Gross Thermal 0.0 0.0 230,522,687 Energy (MWHt) 10.
Gross Electric Energy 0.0 0.0 77,175,924 (MWHe) 11.
Net Electrical. Energy 0.0 0.0 73,973,643 (MWHe) 4 i
12.
Reactor Service 0.0 0.0 61.2 Factor (%)
13.
Reactor Availabihty 0.0 0.0 62.5 i
Factor (%)
14.
Unit Service Factor 0.0 0.0 60.3
(%)
15.
Unit Availability 0.0-0.0 60.3 Factor 16.
Unit Capacity Factor 0.0 0.0 56.7 (MDC) 17 Unit Capacity Factor 0.0 0.0 54.5 (design MWe)
.18.
Unit Forced Outage 100.0 100.0 19.0 Factor (%)
- 19. Shutdowns Scheduled Over Next 6 Months: None
- 20. If Shutdown at End of Report Period, Date of Startup: April 28,1999
L T.
B. UNIT SHUTDOWNS AND OPERATING
SUMMARY
REPORT MONTH FEBRUARY 1999 NO DATE TYPE-DURATION REASON (2)
METHOD OF CORRECTIVE ACTIONS /
(1)
(HOURS)*
SHUTTING COMMENTS DOWN REACTOR (3) 07 98/01/01 F
10,276 C
2 Following the lifting of Confirmatory Action Letter Rill 008, L2RO7 is considered a forced extension of a refueling outage.
l i
SUMMARY
Th3 unit remained shutdown for the entire report period.
Ycar-to-date forced outage hours = 1,416 Cumulative forced outage hours = 17,808.3 TABLE KEY:
(1)
(3)
F: Forced Method:
S: Scheduled
- 1. Manual
- 2. Manual Scram (2)
- 3. Automatic Scram Reason.
- 4. Continuation A Equipment Failure (Explain)
- 5. Other (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator / Licensing Exam F Administrative G Operational Error (Explain)
H Other (Explain) l-i
= C. UNIQUE REPORTING REQUIREMENTS FOR UNIT TWO.
- 1. ' Challenges other than routine surveillance testing to Safety / Relief Valve Operations-None I-
- 2. Major Changes to Radioactive Waste Treatment Systems-None 1
3.' Off-Site Dose Calculation Manual Changes-None l
l i
t i
4 I
l