MONTHYEARML20217C9121999-10-12012 October 1999 SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20198B3801998-12-14014 December 1998 SER Accepting one-time Request for Relief from Certain Provisions of Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a for Certain Plant Safety/Relief Valves ML20196B1441998-11-23023 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Bindings of Safety-Related Power-Operated Gate Valves ML20153C7621998-09-18018 September 1998 Safety Evaluation Acceping NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20236L8041998-07-0606 July 1998 Safety Evaluation Granting Licensee 980304 Request for Second 10-yr Interval Pump & Valve IST Program Plan,Rev 2, Including Changes to 2 ASME Boiler & Pressure Vessel Code Relief Requests Previously Submitted in Rev 1 ML20217Q7041998-05-0404 May 1998 Safety Evaluation Accepting Util Request to Leave Leak Chase Channels Plugged During Performance of Containment ILRT ML20203B1941997-12-0404 December 1997 Supplemental SE Accepting Proposed Changes Which Are Consistent W/Recognized Battery Stds & Station Blackout Rule ML20148T8571997-07-0303 July 1997 SER Accepting Temporary Use of Current Procedure for Containment R/R Activities Instead of Requirements of Amended 10CFR50.55a Rule to Be Reasonable ML20137D4961997-03-24024 March 1997 Safety Evaluation of Second 10-year Interval Inservice Insp Program Plan Requests for Relief CR-17 & CR-18 Commonwealth Edison Co,Lasalle County Station,Units 1 & 2 ML20135D4661996-12-0606 December 1996 Safety Evaluation Granting Relief Request RP-01 & Alternative Testing Imposed Per 10CFR50.55a(f)(6)(i) Based on Impracticality of Performing Required Testing ML20129D9401996-09-26026 September 1996 SER Accepting Licensee Cycle 8 Core Reload Design Submittal Re Application of Anfb Critical Power Correlation to Coresident GE9 Fuel as Described in TR EMF-96-021(P),Rev 1 ML20059E2871993-12-30030 December 1993 Safety Evaluation Supporting Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37,NPF-66,NPF-72,NPF-77,NPF-11,NPF-18, DPR-39 & DPR-48 Respectively ML20128E4101992-12-0101 December 1992 Safety Evaluation Accepting Relief Requests RI-22 & RI-23 from ASME Code Requirements from Hydrostatic Pressure Testing Following Replacement of RCIC Steam Supply Inboard Isolation Valve as Part of ISI Program ML20059N0301990-08-22022 August 1990 Safety Evaluation Accepting Util Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austentic Stainless Steel Piping ML20154E5461988-09-0707 September 1988 Safety Evaluation Supporting Amends 60 & 40 to Licenses NPF-11 & NPF-18,respectively ML20151X0121988-08-16016 August 1988 Safety Evaluation Re Inservice Testing Program & Requests for Relief ML20237C8761987-12-16016 December 1987 Safety Evaluation Supporting Facility IGSCC Insp,Per Generic Ltr 84-11 ML20237C9091987-12-16016 December 1987 Safety Evaluation Supporting Licensee Response to IE Bulletin 79-26,Rev 1, Boron Loss from BWR Control Blades, Per License Condition 2.C(6) ML20205R6681987-04-0101 April 1987 Safety Evaluation Supporting Continued Use of Static O-Ring Differential Pressure Switches ML20211P2551986-12-15015 December 1986 Safety Evaluation Supporting Util Compliance W/License Condition 2.C.(25)(d) Requirements Re Mods to Six Fire Door Stops ML20214U8501986-12-0404 December 1986 Safety Evaluation Re Util 861006 Response to IE Bulletin 79-26,Rev 1, Boron Loss from BWR Control Blades, to Satisfy License Condition 2.C(13).Response Acceptable ML20214T3991986-12-0202 December 1986 Supplemental Safety Evaluation Accepting Licensee 860613 Analysis & Justification for Cable Separation Criteria to Resolve Deficiencies Described in Sser 7,App D ML20213G3181986-11-12012 November 1986 Safety Evaluation Accepting local-to-bulk Temp Difference of 12 F.Draft Technical Evaluation Rept Encl ML20215K8741986-10-21021 October 1986 Safety Evaluation Accepting Offsite Dose Calculation Manual Updated Through Rev 12.Changes Incorporated in Revs 11 & 12 Comply W/Tech Spec 6.8.2 ML20215K9631986-10-16016 October 1986 Safety Evaluation Granting Interim Acceptance of Process Control Program Updated Through 850718 ML20212Q7191986-08-29029 August 1986 Safety Evaluation Supporting Amend 27 to License NPF-18 ML20205F0791986-08-11011 August 1986 Safety Evaluation Supporting 860213 Procedures for Design of Single Angle Members for HVAC Hanger Frames for Plant. Related Info Encl ML20205C4051986-08-0707 August 1986 Safety Evaluation Supporting Facility Restart Following 860601 Feedwater Transient.Licensee Action Plan,Supplemented by Listed Actions,Adequate Basis for Restart & short-term Operation.Supporting Drawings & Matls Encl ML20206M6161986-06-23023 June 1986 Safety Evaluation Supporting Responses to Generic Ltr 83-28 Item 2.1 (Part 1) Re Equipment Classification ML20195D4121986-05-27027 May 1986 Safety Evaluation Summary of Inservice Testing Program for Pumps & Valves.Program Acceptable Subj to Listed Conditions in Encl SER ML20195D4171986-05-27027 May 1986 SER Re Pump & Valve Inservice Testing Program NUREG-0519, Safety Evaluation of Final in-plant Safety/Relief Valve Test Evaluation Rept Per SER (NUREG-0519).Design Adequate to Accommodate Loads Associated W/Activation of One or More Safety Relief Valves1986-05-19019 May 1986 Safety Evaluation of Final in-plant Safety/Relief Valve Test Evaluation Rept Per SER (NUREG-0519).Design Adequate to Accommodate Loads Associated W/Activation of One or More Safety Relief Valves ML20198B4221986-05-15015 May 1986 Supplemental Safety Evaluation Supporting Util Cable Separation Criteria Per Sser (NUREG-0519),App D.Addition of Zipper Tubing to Divisional Cables for Automatic Depressurization Sys Relief Valves Resolved NRC Concern ML20203N5531986-04-30030 April 1986 Safety Evaluation Concluding That Util IGSCC Insp Performed in Accordance W/Generic Ltr 84-11 & Satisfactory.Small Concerns Re long-term Growth of Small IGSCC Cracks Present But Not Detected During Insp Remain ML20140D6501986-03-19019 March 1986 SER Supporting Test Program,Results & Commitment for Nonqualified GE Control Switches.License Conditions 2.C.(21)(c) & 2.C.(12)(a) for Units 1 & 2,respectively,will Be Satisfied When GE Switches Removed from Engine ML20210E0961986-02-0404 February 1986 Safety Evaluation Accepting Util 851113 Proposal for Amend Changing Tech Specs to Include Previously Approved Trip Setting on Low CRD Pump Discharge Water Header Pressure & to Delete Associated Surveillance Requirement ML20137D8081985-11-18018 November 1985 Safety Evaluation Supporting Use of Mechanical Stress Improvement Process in Primary Sys Stainless Steel Piping to Modify Residual Stress Pattern at Piping Butt Welds NUREG-0889, SER Conditionally Supporting Response to Procedures Generation Package1985-10-18018 October 1985 SER Conditionally Supporting Response to Procedures Generation Package ML20137S6391985-09-30030 September 1985 Safety Evaluation Supporting Elimination of Arbitrary Intermediate Pipe Breaks.Deviation from SRP Acceptable for Piping Sys Identified in Ref 2 Except Portion of RHR Sys Made of 304SS Matl ML20129D9511985-07-16016 July 1985 Safety Evaluation Supporting Acceptance Criteria for Firecode CT Gypsum Fire Stops ML20126K9121985-07-12012 July 1985 Revised SER Re Util 831105 & 850605 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review Program. Program & Procedures Acceptable ML20129E8881985-05-24024 May 1985 SER of Util 831105 Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review Data & Info Capabilities.Capabilities Acceptable 1999-10-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217C9121999-10-12012 October 1999 SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20217F9091999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for LaSalle County Stations,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212C4501999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for LaSalle County Station,Units 1 & 2.With ML20210R0671999-07-31031 July 1999 Monthly Operating Repts for July 1999 for LaSalle County Station,Units 1 & 2.With ML20210C1681999-07-0909 July 1999 Seventh Refueling Outage ASME Section XI Summary Rept ML20209H1501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for LaSalle County Station,Units 1 & 2.With ML20195J7871999-05-31031 May 1999 Monthly Operating Repts for May 1999 for LaSalle County Station,Units 1 & 2.With ML20209E1431999-05-31031 May 1999 Cycle 8 COLR, for May 1999 ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206N2071999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for LaSalle County Station,Units 1 & 2.With ML20205L8421999-03-31031 March 1999 Rev 2 to EMF-96-125, LaSalle Unit 2 Cycle 8 Reload Analysis ML20205L8301999-03-31031 March 1999 Administrative Technical Requirements App B (Amend 26) LaSalle Unit 2 Cycle 8 COLR & Reload Transient Analysis Results, for Mar 1999 ML20205R2721999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for LaSalle County Station,Units 1 & 2.With ML20205L8391999-03-22022 March 1999 Rev 2 to 960103, Neutronics Licensing Rept for LaSalle Unit 2,Cycle 8 ML20204C8141999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for LaSalle County Station,Units 1 & 2.With ML20199E4601998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for LaSalle County Station,Units 1 & 2.With ML20207C7371998-12-31031 December 1998 Annual Rept for LaSalle County Station for Jan 1998 Through Dec 1998 ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20198B3801998-12-14014 December 1998 SER Accepting one-time Request for Relief from Certain Provisions of Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a for Certain Plant Safety/Relief Valves ML20206N2261998-12-0909 December 1998 LER 98-S03-00:on 981116,protected Area Was Entered Without Current Authorization for Unescorted Access Due to Programmatic Deficiency Error.Changed Badge Control Process ML20197K0981998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for LaSalle County Station,Unts 1 & 2.With ML20196B1441998-11-23023 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Bindings of Safety-Related Power-Operated Gate Valves ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3191998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for LaSalle County Station.With ML20154H6781998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for LaSalle County Nuclear Power Station,Units 1 & 2 ML20153D0191998-09-18018 September 1998 Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/Mtu ML20153C7621998-09-18018 September 1998 Safety Evaluation Acceping NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20153C6771998-09-17017 September 1998 Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed ML20151W0241998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for LaSalle County Station.With ML20237E2921998-08-21021 August 1998 Special Rept:On 980811,channel 5 of Lpms Became Inoperable. Caused by Channel Failed pre-amplifier Located Inside Primary Containment at Inboard Side of Electrical Penetration E-19.Initiated Repairs of Channel ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B4861998-07-31031 July 1998 Monthly Operating Repts for July 1998 for LaSalle County Nuclear Power Station Units 1 & 2 ML20236V7701998-07-31031 July 1998 Revised LaSalle Unit 1 Cycle 8 COLR & Reload Transient Analysis Results ML20236P8231998-07-14014 July 1998 Special Rept:From 980614-17,various Fire Rated Assemblies Were Inoperable for Period Greater than Seven Days.Caused by Test Equipment Being Routed Through Fire Doors.Established Fire Watches & on 980619 Assemblies Were Declared Operable ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L8041998-07-0606 July 1998 Safety Evaluation Granting Licensee 980304 Request for Second 10-yr Interval Pump & Valve IST Program Plan,Rev 2, Including Changes to 2 ASME Boiler & Pressure Vessel Code Relief Requests Previously Submitted in Rev 1 ML20236P3611998-06-30030 June 1998 Monthly Operating Repts for June 1998 for LaSalle County Nuclear Power Station,Units 1 & 2 ML20249C4891998-06-22022 June 1998 Special Rept:On 980522,Fire Detection Zone 1-31 Was Noted out-of-service for More than 14 Days.Detection Sys Was Taken out-of-service on 980508 to Prevent False Alarms During Hot Work Activities.Sys Was Returned to Operable Status 980528 ML20248M3101998-05-31031 May 1998 Monthly Operating Repts for May 1998 for LaSalle County Nuclear Power Station,Units 1 & 2 ML20236V7771998-05-31031 May 1998 Rev 1 to 24A5180, Supplemental Reload Licensing Rept for LaSalle County Station Unit 1 Reload 7 Cycle 8 ML20217Q7041998-05-0404 May 1998 Safety Evaluation Accepting Util Request to Leave Leak Chase Channels Plugged During Performance of Containment ILRT ML20247M4491998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for LaSalle County Station ML20216F4941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for LaSalle County Station,Units 1 & 2 ML20217N6581998-03-30030 March 1998 Special Rept on Fire Detection,Deluge Sys & Fire Rated Assemblies During Period of 980303-25.Established Fire Watches Until Affected Equipment Is Returned to Operable Status ML20216D9511998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for LaSalle County Station,Units 1 & 2 ML20247M4631998-02-28028 February 1998 Rev Monthly Operating Rept for Feb 1998 for LaSalle County Station ML20203D7241998-02-20020 February 1998 Special Rept:On 980118,Fire Detection Zones 1-18 & 2-18 Taken out-of-svc to Prevent False Alarms During Hot Work Activities on Auxiliary Electric Equipment Room Ventilation Sys.Fire Watches Will Remain in Place ML20202G9851998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for LaSalle County Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr 1999-09-30
[Table view] |
Text
_ - - _ _ ___ . _ . .-- . - . _ . _ . _ _ . _ _ _ _ _ _ . _ _. _ _ _ _ _ _ _
y o =0eg% UNITED STATES g j 2
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. 20066 0001 g
k . . . . . ,o SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO NRC BULLETIN 95-02 COMMONygALTH EDISON COMPANY LASALLE COUNTY STATION. UNITS 1 AND 2 DOCKET NOS. 50-373 AND 50-374
1.0 INTRODUCTION
NRC Bulletin 95-02," Unexpected Clogging of a Residual Heat Removal (RHR) Pump Strainer While Operating in Suppression Pool Cooling Mode," was issued on October 17,1995. It requested all holders of boiling-water reactor (BWR) operating licenses or construction permits for nuclear power reactors to take five actions to ensure that unacceptable buildup of debris that could clog strainers does not occur during normal operation. By letters dated November 14, 1995, and January 10,1996, Commonwealth Edison Company (Comed, the licensee) submitted its response to NRC Bulletin 95-02 for LaSalle County Station, Units 1 and 2. In its response, the licensee stated its intent to comply with the requested actions in the bulletin.
2.0 DISCUSSION The following describes the requested actinns in NRC Bulletin 95-02 and the licensee's response to each requested action.
Action i Verify the operability of all pumps which draw suction from the suppression pool whan performing their safety functions (e.g., ECCS [ emergency core cooling system], containment spray, etc.),
based on an evaluation of suppression pool and suction strainer cleanliness conditions. This evaluation should be based on the pool and strainer conditions during the last inspection or cleaning and an assessment of the potential for the introduction of debris or other materials that could clog the strainers since the pool was last cleaned.
Response
The Unit 1 suppression pool strainers were inspected during that unit's refueling outage in April 1994, and the Unit 2 cuppression pool strainers were inspected during that unit's refueling outage in March 1995. During that inspection, allidentified foreign material was removed and the suppression pool cleanup system was used to improve the turbidity and ionic quality of the suppression pool water. On Unit 1, a SCRAM, with a safety relief valve lift, occurred in Augur,t 1995, followed by Residual Heat Removal (RHR) A and B operation for suppression pool cooling.
No flow degradation was identified in the pump discharge pressure from those runs. For both units, quarterly in-service testing ECCS pump surveillence data was reviewed and no ENCLOSURE
~
9009240194 980918
, PDR ADOCK 05000373 G PDR 4
--.a .- ,- + - - . - -,nw - . , - e ., . , ,,--
- i a l degradation of pump suction pressure was identified. Finally, a foreign material exclusion (FME) program, developed in response to NRC Bulletin 93-02 and 93-02, Supplement 1, has been in place since February 1994. Based on the above, the licensee concluded thJt all pumps Which draw suction from the suppression pool while performing their safety function are operable.
Action :2 Confirm the operability evaluation in requested action 1 above through appropriate test (s) and strainer inspection (s) within 120 days of the date of this bulletin.
Response
Multiple ECCS (RHR and Low Pressure Core Spray) pump tests were performed to confirm ECCS suction strainer operability on January 4,1996, for Unit 1 and on January 5,1996, for Unit 2. No decrease in pump suction pressure was identified over the course of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> tests.
Action 3 Schedule a suppression pool (torus) c'eaning. The schedule for cleaning the suppression pool should be consistent with the operability evaluation in requested action 1 above. In addition, a program for periodic cleaning of the suppression pool should be established, including procedures for the cleaning of the pool, criteria for determining the appropriate cleaning frcquency, and criteria for evaluating the adequacy of the pool cleanliness.
Response
in the November 14,1995, ~ etter, the licensee committed to clean, inspect, and destudge the suppression pools for each unit during its next scheduled refueling outage. In addition, cleanliness of the suppression pool will be maintained by the following program. A multiple ECCS pump run will be repeated starting at every second futuse refueling outage of each unit.
Two strainers will be inspected at every second outage, altemating between using remote cameras (or equivalent) or a direct diver inspection.
Action 4 Review FME procedures and their implementation to determine whether adequate control of materials in the drywell, suppression pool, and systems that interface with the suppression pool exists. This review should determine if comprehensive FME controls have been established to prevent materials that could potentially impact ECCS operation from being introduced into the suppression pool, and that workers are sufficiently aware of their responsibilities regarding FME.
Any identified weaknesses should be correctcd. In addition, the effectiveness of the FME controls since the last time the suppression poof was cleaned and the EOCS strainers inspected, and the impact that any weaknesses noted may itsve on the operability of the ECCS, should be assessed.
i l
l
Response
The licensee stated that, although existing FME procedures are adequate, it is continuously working to enhance the FME program. A standardized maintenance procedure will be im;Hemented which includes actions to preciede FME events. The suppression pool and drywell are permanently designated as zones requiring the highest level of FME controls. Additional controls include drywell closeout procedural steps, FME logs, and expanded availability of FME devices to preclude introduction of foreign material into the suppression pool.
Action 5 Consider additional measures such as suppression pool water sampling and trending of pump ;
suction pressure to detect clogging of ECCS suction strainers. l
Response
Beyond the actions described above, ECCS pump suction pressure will be trended and an l Inspection program for the suppression pool downcomers will be implemented.
3.0 EVALUATION The purpose of the requested actions in the bulletin is to ensure that ECCS and other pumps drawing suction from the suppression pool do not experience unacceptable buildup of debris that could clog strainers during normal operation which would prevent them from performing their safety function. Action 1 requested licensees to evaluate the operability of their pumps based on the cleanliness of the suppression pool and strainers. Action 2 then requested a verification of the licensee's assessment through a pump test and strainer inspection. These two actions serve to ensure that the pumps are currently operable and not experiencing unacceptable debris buildup. Actions 3,4'and 5 serve to ensure that appropriate measures, such as cleaning of suppression pools and strengthening of FME practices, are taken in the long term to prevent debris accumulation in the pool.
As committed to in the lice me's response to action 3, the suppression pools were cleaned and desludged during the 1996 refueling outages. During the Unit 1 cleaning, a number of small items were found and removed under the silt layer as well as a quantity of silt. No concems were identified. During the Unit 2 cleaning, however, a significant quantity of foreign material was removed from under the sitt layer which appeared to have been in the pool since initial construction. These findings are documented in Licensee Event Report 96-09. Although this material raised questions uith regard to past operability, the foreign material and the silt were removed as part of this cletning.
i The staff has concluded that the licensee's assessment of the ability of all pumps drawing suction from the suppression pool to perform their safety function has a reasonable basis for concluding that all of the pumps evaluated are operable. The licensee conducted an inspection to confirm that the ECCS were not affected by an unacceptable buildup of debris that could clog the pump strainers. Initial strainer cleanliness was considered good. The staff has concluded that the licensee's response meets the intent of requested actions 1 and 2 and is acceptable.
l
-e .
_ m _ . ~ _.__ __ _ _ _.____. _ _ _ . . . . _ _ _ . _ _ . . _ _ _ _ .__ _ . .
. +
4 The staff has also concluded that the licensee's evaluation of its FME program and suppression pool cleaning program meet the intent of requested actions 3 and 4, and are acceptable.
Although the Unit 2 sump had a significant quantity of foreign material at the time of the licensee response, the subsequent cleaning removed the material. The discovery of this material did not call into question the licensee's current FME program because the majority of material was determined to have been deposited prior to implementation of the licensee's enhanced FME controls.
The licensco's programs for trending pump suction pressure data, sampling torus water / sediment, and periodically inspecting the strainers and torus provide additional opportunity for early identification of potential strainer fouling. The staff has concluded that these additional actions meet the intent of requested action 5 and are acceptable. The staff has also corcluded that the schedule for innplementation of the actions proposed by the licensee is appropriate given the actions already taken.
4.0 CONCLUSION
Based on the staff's evaluation of the licensee's submittals, the staff finds the licensee's response to NRC Bulletir: 95-02 acceptable.
Principal Contributors: John B. Hickman R. Elliot (By precedent)
Date: September 18, 1998 4
- - - . . . . - . . . , , , - .