Audit Plan for LAR 19-019
ML20014D839
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/29/2020
From: Donald Habib
NRC/NRR/VPOB
To: Victor Hall
Office of Nuclear Reactor Regulation
Don Habib EX. 1035
References
LAR 19-019
Download: ML20014D839 (8)


Text

January 29, 2020 MEMORANDUM TO:

Victor Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM:

Donald Habib, Project Manager

/RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

AUDIT PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4, REQUEST FOR LICENSE AMENDMENT:

RECONCILIATION OF ENVIRONMENTAL CONDITIONS INPUTS TO CIVIL STRUCTURAL DESIGN LICENSING BASIS (LAR 19-019)

By letter dated December 13, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19347C046), Southern Nuclear Operating Company (the licensee) requested an amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

The requested amendment would change the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD) Tier 2 and Tier 2* information.

The requested amendment would revise the normal thermal loads for the passive containment cooling system tank; revise the accident thermal loads for the exterior walls below grade and basemat in the auxiliary building; and update the critical section tables for the auxiliary building basemat, concrete walls, and floors, the shield building roof, and the spent fuel pool west wall in the UFSAR.

CONTACT: Donald Habib, NRR/VPO 301-415-1035

The Structural, Civil, Geotech, Engineering Branches A and B (ESEA and ESEB) plan to conduct an audit to gain a better understanding of the proposed changes and to review related documentation and non-docketed information in order to evaluate the acceptability of the proposed changes to the license.

Docket Nos.: 52-025 and 52-026

Enclosure:

Regulatory Audit Plan cc: See next page

ML20014D839 NRO-008 OFFICE NRR/VPO/PM NRR/VPO/LA NRR/DEX/ESEA/BC NRR/DEX/ESEB/BC NAME DHabib RButler DWilliams JColaccino DATE 1/16/2020 1/16/2020 1/17/2020 1/17/2020 OFFICE NRR/VPO/BC NAME VHall DATE 1/28/2020

Vogtle Mailing List (Revised 11/12/2019) cc:

Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)

Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak)

Page 2 of 3

Vogtle Mailing List sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)

William.Birge@hq.doe.gov (William Birge)

X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)

X2hagge@southern.com (Neil Haggerty)

X2wwill@southernco.com (Daniel Williamson)

Page 3 of 3

Enlosure AUDIT OF REPORTS AND CALCULATIONS IN SUPPORT OF REQUEST FOR LICENSE AMENDMENT RELATED TO RECONCILIATION OF ENVIRONMENTAL CONDITIONS INPUTS TO CIVIL STRUCTURAL DESIGN LICENSING BASIS (LAR-19-019)

SOUTHERN NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 Docket Nos.52-025 and 52-026 The purpose of the audit is to review the documentation and calculations needed by the U.S. Nuclear Regulatory Commission (NRC) staff to verify the information and conclusions in the Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019) submitted by Southern Nuclear Operating Company (SNC) for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19347C046).

A.

Background:

In LAR 19-019, SNC requests changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD)

Tier 2 and Tier 2* information.

The LAR includes proposed changes to revise the normal thermal loads for the passive containment cooling system (PCS) tank; revise the accident thermal loads for the exterior walls below grade and basemat in the auxiliary building; and update the critical section tables for the auxiliary building basemat, concrete walls, and floors, the shield building roof, and the spent fuel pool (SPF) west wall in the UFSAR.

B. Regulatory Audit Basis This regulatory audit is based on the following:

VEGP Units 3 and 4 UFSAR Tier 1, Revision 7, June 14, 2019 (ADAMS Accession No. ML19171A045).

VEGP Units 3 and 4 UFSAR Tier 2, Revision 8, June 14, 2019 (ADAMS Accession No. ML19171A096).

C. Regulatory Audit Scope and Methodology The audit team will view the documentation and calculations that provide the technical support for LAR 19-019. Information to be reviewed involves the calculations associated with the locations in UFSAR Table 3H.5-9 with no margin (ratio between required and provided is 1.0).

These are the design limit for the tension ring (sheet 1 of 3), and the design limit for the air inlet (sheet 2b of 3).

2 In addition, the audit team will request to discuss these topics with subject matter expert(s).

D. Information and Other Material Necessary for the Regulatory Audit The staff requests that the documents, data, and calculations regarding the aforementioned topics be made available to the staff in the electronic reading room:

The staff acknowledges and will observe appropriate handling and protection of proprietary information made available for the audit.

E. Audit Team The following are the NRC audit team members:

Pravin Patel, Structural Engineer, Lead Bryce Lehman, Structural Engineer Donald Habib, Project Manager The licensee contact is Yasmeen Arafeh.

F. Logistics Date: January 15, 2020 - February 7, 2020 Location: The audit will be conducted remotely using the licensees electronic reading room and teleconferences. As needed, face-to-face discussions and some document review may occur at:

Westinghouse Electric Company, LLC Washington Operations 11333 Woodglen Drive, Suite 203 Rockville, Maryland 20852 Telephone: 301-881-7040/7042 G. Special Requests None Donald Habib, NRC Project Manager, can be reached at 301-415-1035 or Donald.Habib@nrc.gov.

H. Deliverables On completion of the audit, the staff will prepare an audit summary report that will be declared and entered as an official agency record in ADAMS. The audit outcome may be used to identify any additional information to be submitted for making regulatory decisions and will assist the staff in the issuance of requests for additional information (if necessary) in completing its review of LAR 19-019.