UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 All Operating Reactor Licensees and Holders of Construction Permits on the Enclosed List March 26, 2014
SUBJECT:
NUCLEAR REGULATORY COMMISSION AUDITS OF LICENSEE RESPONSES TO RELIABLE SPENT FUEL POOL INSTRUMENTATION ORDER EA-12-051 The U.S. Nuclear Regulatory Commission (NRC) staff is currently performing a review of licensee responses to Order EA-12-051, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12054A679). To synchronize this review with other NRC staff activities following the events at Fukushima Dai-ichi, the NRC staff will complete the ongoing review by conducting audits of the respective plant submittals. This audit activity will promote the ability of the NRC staff to focus and streamline obtaining the information needed to conduct the Order EA-12-051 reviews by utilizing the ePortal system previously set up by licensees in this area. If necessary, onsite audits will be conducted in conjunction with the Mitigation Strategies onsite audits related to order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A736). Audits of licensee's responses will be performed in accordance with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195). Enclosure 2 to this document provides the associated audit plan for this activity.
As part of the audit process, NRC staff members will be contacting licensees to discuss topics relevant to the existing docketed submittals, as well as information that may be contained in the ePortal system. The NRC staff considers licensee participation in the audit process for the Order EA-12-051 review to be voluntary. For those licensees who do not wish to participate in the Audit Process, the NRC staff will request the information needed to support the Order EA-12-051 review by an alternate mechanism.
If you have any questions about this matter, please contact Jeremy Bowen at (301) 415-3471 or Jeremy. Bowen@nrc.gov.
Sincerely, a k R. Davis, Director it ation Strategies Directorate ffi e of Nuclear Reactor Regulation
Enclosures:
- 1. List of Operating Reactor Licensees and Holders of Construction Permits
- 2. Audit Plan cc:
Distribution via listserv NEI
OPERATING REACTOR LICENSEES AND HOLDERS OF CONSTRUCTION PERMITS Arkansas Nuclear One Entergy Operations, Inc.
Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Vice President, Operations Entergy Operations, Inc.
Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station FirstEnergy Nuclear Operating Co.
Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Mr. Eric A. Larson Site Vice President FirstEnergy Nuclear Operating Company P.O. Box 4, Route 168 Shippingport, PA 15077 Bellefonte Nuclear Power Station Tennessee Valley Authority Docket Nos. 50-438 and 50-439 Construction Permit Nos. CPPR No. 122 and CPPR No. 123 Mr. Michael D. Skaggs Senior Vice President, Nuclear Construction Tennessee Valley Authority Lookout Place 6A 1101 Market Street Chattanooga, TN 37 402-2801 Braidwood Station Exelon Generation Co., LLC Docket Nos. STN 50-456 and STN 50-457 License Nos. NPF-72 and NPF-77 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Browns Ferry Nuclear Plant Tennessee Valley Authority Docket Nos. 50-259, 50-260 and 50-296 License Nos. DPR-33, DPR-52 and DPR-68 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Carolina Power & Light Co.
Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 Mr. George T. Hamrick Vice President Duke Energy Progress, Inc Brunswick Steam Electric Plant P. 0. Box 10429 Southport, NC 28461 Byron Station Exelon Generation Co., LLC Docket Nos. STN 50-454 and STN 50-455 License Nos. NPF-37 and NPF-66 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
Callaway Plant Union Electric Company Docket No. 50-483 License No. NPF-30 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri Callaway Plant P.O. Box 620 Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant, LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and NPF-52 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 297 45 Clinton Power Station Exelon Generation Co., LLC Docket No. 50-461 License No. NPF-62 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, I L 60555 Columbia Generating Station Energy Northwest Docket No. 50-397 License No. NPF-21 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest MD 1023 North Power Plant Loop P.O. Box 968 Richland, WA 99352 Comanche Peak Nuclear Power Plant Luminant Generation Co., LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Rafael Flores Senior Vice President and Chief Nuclear Officer Luminant Generation Company, LLC Attn:
Regulatory Affairs P.O. Box 1002 Glen Rose, TX 76043 Cooper Nuclear Station Nebraska Public Power District Docket No. 50-298 License No. DPR-46 Mr. Oscar A. Limpias Vice President-Nuclear and Chief Nuclear Officer Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321
Crystal River Nuclear Generating Plant Florida Power Corp.
Docket No. 50-302 License No. DPR-72 Mr. Terry D. Hobbs Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708 Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Co.
Docket No. 50-346 License No. NPF-3 Mr. Raymond A. Lieb Site Vice President-Nuclear Davis Besse FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 N. State Route 2 Oak Harbor, OH 43449-9760 Diablo Canyon Power Plant Pacific Gas & Electric Co.
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 56 Mail Code 1 04/6 Avila Beach, CA 93424 Donald C. Cook Nuclear Plant Indiana Michigan Power Company Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-7 4 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 Dresden Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-237 and 50-249 License Nos. DPR-19 and DPR-25 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Docket No. 50-331 License No. DPR-49 Mr. Rich Anderson Site Vice President NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, lA 52324-9785 Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Co.
Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Mr. C.R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295/BIN B038 Birmingham, AL 35201-1295 Fermi Detroit Edison Co.
Docket No. 50-341 License No. NPF-43 Mr. Joseph H. Plena Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166
Fort Calhoun Station Omaha Public Power District Docket No. 50-285 License No. DPR-40 Mr. Louis Cortopassi Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-4 9610 Power Lane Blair, NE 68008 Grand Gulf Nuclear Station Entergy Operations, Inc.
Docket No. 50-416 License No. NPF-29 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 H. B. Robinson Steam Electric Plant Duke Energy Progress, Inc Docket No. 50-261 License No. DPR-23 Mr. William R. Gideon, Vice President H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 Hope Creek Generating Station PSEG Nuclear, LLC Docket No. 50-354 License No. NPF-57 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. 0. Box 236 Hancocks Bridge, NJ 08038 Indian Point Nuclear Generating Entergy Nuclear Operations, Inc.
Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operations, Inc.
Docket No. 50-333 License No. DPR-59 Chris Adner, Licensing Manager Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Joseph M. Farley Nuclear Plant Southern Nuclear Operating Co.
Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295/Bin 038 Birmingham, AL 35201-1295 Kewaunee Power Station Dominion Energy Kewaunee, Inc.
Docket No. 50-305 License No. DPR-43 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
LaSalle County Station Exelon Generation Co., LLC Docket Nos. 50-373 and 50-37 4 License Nos. NPF-11 and NPF-18 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Limerick Generating Station Exelon Generation Co., LLC Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Millstone Nuclear Power Station Dominion Nuclear Connecticut, Inc.
Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Docket No. 50-263 License No. DPR-22 Mrs. Karen D. Fili Site Vice President Northern States Power Company -
Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 Nine Mile Point Nuclear Station Nine Mile Point Nuclear Station, LLC Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69 Mr. Christopher Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. 0. Box 63 Lycoming, NY 13093 North Anna Power Station Virginia Electric & Power Co.
Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric & Power Company lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Oconee Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-269, 50-270 and 50-287 License Nos. DPR-38, DPR-47 and DPR-55 Mr. Scott Batson Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 Oyster Creek Nuclear Generating Station Exelon Generation Co., LLC Docket No. 50-219 License No. DPR-16 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
Palisades Nuclear Plant Entergy Nuclear Operations, Inc.
Docket No. 50-255 License No. DPR-20 Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Palo Verde Nuclear Generating Station Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529 and STN 50-530 License Nos. NPF-41, NPF-51 and NPF-74 Mr. Randall K. Edington Executive Vice President Nuclear and Chief Nuclear Officer Arizona Public Service Co.
P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 Peach Bottom Atomic Power Station Exelon Generation Co., LLC Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Perry Nuclear Power Plant FirstEnergy Nuclear Operating Co.
Docket No. 50-440 License No. NPF-58 Mr. Ernest J. Harkness Site Vice President - Nuclear - Perry FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A290 Perry, OH 44081 Pilgrim Nuclear Power Station Unit No. 1 Entergy Nuclear Operations, Inc.
Docket No. 50-293 License No. DPR-35 Mr. John Dent, Jr.
Vice President and Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr. Eric McCartney Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516 Prairie Island Nuclear Generating Plant Northern States Power Company -
Minnesota Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Mr. Kevin Site Vice President Northern States Power Company -
Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089-9642 Quad Cities Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30
Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 R. E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC Docket No. 50-244 License No. DPR-18 Mr. Joseph E. Pacher Vice President R.E. Ginna Nuclear Power Plant, LLC R.E. Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519 River Bend Station Entergy Operations, Inc.
Docket No. 50-458 License No. NPF-47 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Salem Nuclear Generating Station PSEG Nuclear, LLC.
Docket Nos. 50-272 & 50-311 License Nos. DPR-70 and DPR-75 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. 0. Box 236 Hancocks Bridge, NJ 08038 San Onofre Nuclear Generating Station Southern California Edison Company Docket Nos. 50-361 and 50-362 License Nos. NFP-10 and NFP-15 Mr. Thomas J. Palmisano Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Seabrook Nuclear Plant NextEra Energy Seabrook, LLC Docket No 50-443 License No. NFP-86 Mr. Kevin Walsh Vice President, Seabrook Nuclear Plant c/o Mr. Michael Ossing NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Sequoyah Nuclear Plant Tennessee Valley Authority Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street LP 3D-C Chattanooga, TN 37402-2801 Shearon Harris Nuclear Power Plant Duke Energy Progress, Inc Docket No. 50-400 License No. NPF-63 Mr. Ernest J. Kapopoulos Jr.
Vice President Shearon Harris Nuclear Power Plant P. 0. Box 165, Mail Zone 1 New Hill, NC 27562-0165
South Texas Project STP Nuclear Operating Co.
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 St. Lucie Plant Florida Power & Light Co.
Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy 700 Universe Boulevard P. 0. Box 14000 Juno Beach, FL 33408-0420 Surry Power Station Virginia Electric & Power Co.
Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Susquehanna Steam Electric Station PPL Susquehanna, LLC Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 Three Mile Island, Unit 1 Exelon Nuclear Docket No. 50-289 License No. DPR-50 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Turkey Point Florida Power and Light Co.
Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy 700 Universe Boulevard P.O. Box 14000 Juno Beach, FL 33408-0420 Vermont Yankee Nuclear Power Station Entergy Nuclear Operations, Inc.
Docket No. 50-271 License No. DPR-28 Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250, Governor Hunt Road Vernon, VT 05354
Virgil C. Summer Nuclear Station South Carolina Electric & Gas Co.
Docket No. 50-395 License No. NPF-12 Mr. Thomas D. Gatlin Vice President Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065 Vogtle Electric Generating Plant Southern Nuclear Operating Co.
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Mr. C.R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295/Bin 038 Birmingham, AL 35201-1295 Waterford Steam Electric Station Entergy Operations, Inc.
Docket No. 50-382 License No. NPF-38 Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 Watts Bar Nuclear Plant. Unit 1 Tennessee Valley Authority Docket No. 50-390 License No. NPF-9 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Watts Bar Nuclear Plant. Unit 2 Tennessee Valley Authority Docket No. 50-391 Construction Permit No. CPPR No. 092 Mr. Michael D. Skaggs Senior Vice President, Nuclear Construction Tennessee Valley Authority Lookout Place 6A 11 01 Market Street Chattanooga,TN 37402-2801 William B. McGuire Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Mr. Steven D. Capps Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Wolf Creek Generating Station Wolf Creek Nuclear Operating Corp.
Docket No. 50-482 License No. NPF-42 Mr. Adam C. Heflin President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
- Audit Plan
NRC OFFICE OF NUCLEAR REACTOR REGULATION MITIGATING STRATEGIES DIRECTORATE AUDIT PLAN TO REVIEW LICENSEE SUBMITTALS IN RESPONSE TO ORDER EA-12-051 "ISSUANCE OF ORDER TO MODIFY LICENSES WITH REGARD TO RELIABLE SPENT FUEL POOL INSTRUMENTATION" BACKGROUND On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-051, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12054A679), to all power reactor licensees and holders of construction permits in active or deferred status.
This order requires, in part, that all operating reactor sites have a reliable means of remotely monitoring wide-range Spent Fuel Pool (SFP) levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event (BDBEE).
The order required all holders of operating licenses issued under Title 10 of the Code of Federal Regulations (1 0 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," to submit to the NRC an Overall Integrated Plan (OIP) by February 28, 2013.
While licensees were proceeding towards compliance with the order, the NRC staff reviewed the OIPs, as supplemented, to determine the extent to which the licensees were proceeding on a path towards successful implementation.
As a result, the NRC staff issued interim staff evaluations (ISEs) to each licensee, which provided preliminary NRC staff evaluations that the licensee has provided a reasonable path for compliance with the order and identified areas where additional information is needed.
The ISEs identified a specific date for each licensee to provide its responses to the request for additional information (RAI), which corresponded to six months prior to the site's compliance date.
To synchronize this review with other NRC staff activities following the events at Fukushima Dai-ichi, the NRC staff will conduct audits of licensee OIP submittals, as supplemented, per NRC Office of Nuclear Reactor Regulation Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195).
This audit activity will promote the ability of the NRC staff to focus and streamline obtaining the information needed to conduct the Order EA-12-051 reviews by utilizing the ePortal system previously set up by licensees in this area.
If necessary, onsite audits will be conducted in conjunction with the Mitigation Strategies onsite audits related to Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A736).
In conducting these audits, the NRC staff gains a better understanding of submitted information, identifies additional information necessary for the licensee to supplement its plan, and identifies any staff potential concerns.
The ongoing audit process allows the staff to assess whether it has enough information to make an Integrated Plan safety evaluation.
In addition to announcing the transition to this audit based review process, this audit plan also notifies each licensee participating in the audit not to formally submit their RAI responses on the docket but instead, put their responses and any other supporting information on their ePortals by the date identified in their ISE to support the staff's review process.
AUDIT BASIS NRC staff will review the information contained in licensee's submittals in response to Commission Order dated March 12, 2012, modifying licenses with regard to requirements for Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051).
By letter dated August 24, 2012, the Nuclear Energy Institute (NEI) developed NEI 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" (ADAMS Accession No. ML12240A307) to outline a process, by which, individual licensees would define and implement reliable and available SFP level indication.
This guide was endorsed, with exceptions and clarifications, by NRC interim staff guidance (ISG) JLD-ISG-2012-03 "Compliance with Order EA-12-051,
'Reliable Spent Fuel Pool Instrumentation"' (ADAMS Accession No. ML12221A339) as providing one acceptable means of meeting the order requirements.
Other methods that deviate from the guidance may be found acceptable, but will require additional staff review and attention.
AUDIT SCOPE The audit's purpose and scope is to review the OIP audit questions, responses, and supporting information via the ePortal and/or onsite audit visits that address requested information identified in the ISEs and the ongoing audit process.
The purpose of the audits is to obtain and review information responsive to NRC staff questions, and to observe and gain a better understanding of the basis for the site's overall program to ensure the licensee is on the correct path for compliance with the Spent Fuel Instrumentation order.
INFORMATION NECESSARY FOR THE AUDIT AND PROCESS NRC staff will review the information contained in licensees' OIPs in response to order EA-12-051, as supplemented, and the information provided via this audit review process using the respective licensee ePortals in-office and/or from onsite audit visits.
STAFF ASSIGNMENTS Staff in the Office of Nuclear Reactor Regulation's Mitigating Strategies Directorate will perform this audit.
LOGISTICS Continuing Review and Development of Further Questions:
The submitted OIPs will be reviewed in batches by NRC staff. Priority is determined by when a plant needs to be in compliance with Order EA-12-051. During these reviews, staff will develop questions to address any portions of the OIPs that appear to not fully comply with the order.
After review, questions will be provided by e-mail to licensees.
Because these questions may not be fully reflective of information that is necessary for the staff to make a determination regarding the OIPs, they should be considered pre-decisional.
Teleconferences with Licensees:
Audit questions will be discussed in telephone conferences with licensees, supported by management and staff from the Mitigating Strategies Directorate. The purpose of these calls is for the NRC staff and the licensees to have a common understanding of the issue raised by the reviewers. Many of the issues are complex, and the goal is to ensure that the NRC staff understands what the licensee submitted, and, if necessary, for the licensee to understand what supplemental information may be necessary to explain how the requirements of the order are met.
Subsequently, licensees should provide the NRC with the necessary supplemental information that was agreed upon during the teleconference. To facilitate the audit schedule, this information should be provided to the NRC via the ePortal.
Periodic Updates Due to the iterative and ongoing nature of the development of the licensee OIPs, the NRC staff evaluation of these plans will be based on the information available at the time of review. This will include information contained in the ePortals, information submitted under oath or affirmation as part of the formal periodic status report updates required by the order or as a supplement to the licensee's OIP.
DELIVERABLES The staff will consider the information reviewed during the audit as part of its overall review of licensees OIPs.
The staff's evaluations and audit reports will be issued in batches to support licensees' compliance schedules.
The NRC plans to hold public meetings to discuss the results of the staff's reviews.
REFERENCES NRC Order EA-12-051, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" (ADAMS Accession No. ML12054A679)
NEI 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation"' issued in August, 2012 (ADAMS Accession No. ML12240A307)
JLD-ISG-2012-03 "Compliance with Order EA-12-051, 'Reliable Spent Fuel Pool Instrumentation"' (ADAMS Accession No. ML12221A339)
Individual licensee submittals in response to NRC Order EA-12-051 Individual NRC interim staff evaluations in response to NRC Order EA-12-051
- ML14083A620 OFFICE NRRIMSD/PM NRR/MSD/LA NAME JPaige SLent DATE 3/25/14 3/25/14 OFFICE NRR/MSD/D NAME JDavis DATE 3/26/14 NRR/MSD/BC SWhaley 3/25/14
Letter to All Operating Reactor Licensees and Holders of Construction Permits from Jack Davis dated March 26, 2014.
SUBJECT:
NUCLEAR REGULA TORY COMMISSION AUDITS OF LICENSEE RESPONSES TO RELIABLE SPENT FUEL POOL INSTRUMENTATION ORDER EA-12-051 DISTRIBUTION PUBLIC LPL 1-1 R/F LPL 1-2 R/F LPL2-1 R/F LPL2-2 R/F LPL3-1 R/F LPL3-2 R/F LPL4-1 R/F LPL4-2 RidsNrrDorl RidsNrrDoriLpl1-1 RidsNrrDoriLpl1-2 RidsNrrDoriLpl2-1 RidsNrrDoriLpl2-2 RidsNrrDoriLpl3-1 RidsNrrDoriLp13-2 RidsNrrDoriLpl4-1 RidsNrrDoriLpl4-2 RidsOgcMaiiCenter RidsNrrLAABaxter RidsNrrLAJBurkhardt RidsNrrLABCiayton RidsNrrLASFigueroa RidsNrrLAKGoldstein RidsNrrLASRohrer RidsNrrLAMHenderson RidsNrrLASLent RidsNrrPMANO RidsNrrPMBeaverValley RidsNrrPMBellefonte1 and2 RidsNrrPMBraidwood RidsNrrPMBrownsFerry RidsNrrPMBrunswick RidsNrrPMByron RidsNrrPMCallaway RidsNrrPMCalvertCiiffs RidsNrrPMCatawba RidsNrrPMCiinton RidsNrrPMColumbia RidsNrrPMComanchePeak RidsNrrPMCooper RidsNrrPMCrystaiRiver RidsNrrPMDCCook RidsNrrPMDavisBesse RidsNrrPMDiabloCanyon RidsNrrPMDresden RidsNrrPMDuaneArnold RidsNrrPMF arley RidsNrrPMFermi2 RidsNrrPMFitzPatrick RidsNrrPMFortCalhoun RidsNrrPMGrandGulf RidsNrrPMHatch RidsNrrPMHopeCreek RidsNrrPMindianPoint RidsNrrPMKewaunee RidsNrrPMLaSalle RidsNrrPMLimerick RidsNrrPMMcGuire RidsNrrPMMillstone RidsNrrPMMonticello RidsNrrPMNineMilePoint RidsNrrPMNorthAnna RidsNrrPMOconee RidsNrrPMOysterCreek RidsNrrPMPalisades RidsNrrPMPaloVerde RidsNrrPMPeachBottom RidsNrrPMPerry RidsNrrPMPilgrim RidsNrrPMPointBeach RidsNrrPMPrairielsland RidsNrrPMQuadCities RidsNrrPMREGinna RidsNrrPMRiverBend RidsNrrPMRobinson RidsNrrPMSalem RidsNrrPMSanOnofre RidsNrrPMSeabrook RidsNrrPMSequoyah RidsNrrPMShearonHarris RidsNrrPMSouthTexas RidsNrrPMStLucie RidsNrrPMSummer RidsNrrPMSurry RidsNrrPMSusquehanna RidsNrrPMThreeMilelsland RidsNrrPMTurkeyPoint RidsNrrPMVermontYankee RidsNrrPMVogtle RidsNrrPMWaterford RidsNrrPMWattsBar1 RidsNrrPMWattsBar2 RidsNrrPMWolfCreek RidsRgn1 MaiiCenter Resource RidsRgn2MaiiCenter Resource RidsRgn3MaiiCenter Resource RidsRgn4MaiiCenter Resource