MONTHYEARML24250A2042024-09-0909 September 2024 Audit Extension for the License Amendment Request to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1 Surveillance Requirements ML24176A1632024-07-0101 July 2024 – Regulatory Audit Supplement in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1 Surveillance Requirements EPID L-2024-LLA-0031 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements ML23011A2742023-01-20020 January 2023 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 1.1, Use and Application Definitions, and to Add Technical Specification 5.5.23, Online Monitoring Program ML22103A2532022-10-0707 October 2022 Regulatory Audit in Support of Review of the Application to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel ML20342A0182021-02-24024 February 2021 Audit Plan for Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML20133K1062020-05-15015 May 2020 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR 20-004) ML20128J3112020-05-14014 May 2020 Audit Plan for Relief Request VEGP-ISI-ALT-04-04 ML20035E2072020-02-0707 February 2020 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment and Exemption: Auxiliary Building Room Heat-up (LAR-19-010) ML20014D8392020-01-29029 January 2020 Audit Plan for LAR 19-019 ML19364A1572020-01-0808 January 2020 Audit Plan - Vogtle Electric Generating Plant Units 3 and 4 (LAR 19-009) ML19346F1222019-12-12012 December 2019 Audit Plan, Vogtle Electric Generating Plant Units 3 and 4, LAR-19-017, Request for License Amendment: Removal of the PRHR-HX Natural Circulation Test, (Public) ML19248C0202019-09-0505 September 2019 Audit Plan for Vogtle Electric Generating Plant, Unit 4 - Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR 19-016) ML19211C8352019-08-0101 August 2019 Audit Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Request for License Amendment: Crediting Previously Completed First Plant Only Star: Crediting Startup Tests (LAR 19-01 ML19154A5572019-06-0404 June 2019 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4 LAR 19-001 Protection and Safety Monitoring System Surveillance Requirement Technical Specification Revision ML19134A2222019-05-15015 May 2019 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4 (LAR 19-006) ADS Blowdown Ftpot ML19065A2392019-03-12012 March 2019 Us NRC Audit Report Related to Vogtle Electric Generating Plant, Units 3 and 4 License Amendment Request (LAR) 18-021 Power Operated Relief Valve Noise Mitigation ML18338A4232018-12-0606 December 2018 LAR-18-008 Audit Plan ML18256A3232018-09-14014 September 2018 Audit Plan for LAR 18-019, Crediting Previously Completed First Plant and First Three Plant Tests ML18221A3262018-08-23023 August 2018 Audit Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Request for License Amendment: Engineered Safety Feature Safeguards Actuation Technical Specifications Applicability Changes (LAR-18-011) ML18192B0912018-07-12012 July 2018 Audit Plan for LAR 17-031, Effect of Rod Shadowing on Excore Power Range Detectors, Changes to Nuclear Overpower Reactor Trips, and Changes to Monitoring of Moderator Temperature Coefficient and Core Power Distribution ML18156A3402018-06-12012 June 2018 Audit Plan - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-037) ML18136A8762018-05-31031 May 2018 Audit Summary Vogtle Electric Generating Plant Units 3 and 4 LAR 17-021 ML18114A2302018-05-0303 May 2018 Updated Audit Questions License Amendment Request for Approval to Utilize the Tornado Missile Risk Evaluator to Analyze Tornado Missile Protection Non-Conformances ML18089A2822018-04-0303 April 2018 Audit Plan for Vogtle Electric Generating Plant (LAR 18-002) Changes to the Building Gap Between the Nuclear Island and Adjacent Buildings ML18051A3172018-03-16016 March 2018 Audit Plan for Second Audit Concerning Systematic Risk-Informed Assessment of Debris Technical Report (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) ML18054A0422018-03-16016 March 2018 Audit Plan (Start Date No Later than 4/15/18) Related to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18059A3242018-03-0101 March 2018 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4 (LAR 17-024) Request for License Amendment and Exemption: Technical Specifications Updates for Reactivity Controls and Other Miscellaneous Changes ML18058A0902018-02-28028 February 2018 LAR-17-023 Audit Plan ML18038B1152018-02-13013 February 2018 LAR-17-033 Audit Plan ML18010B0382018-01-17017 January 2018 Audit Plan (LAR 17-021) ML17319A3252017-12-0404 December 2017 Audit Plan Regarding Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML17277A4892017-10-18018 October 2017 Audit Plan Re Systematic Risk-Informed Assessment of Debris Technical Report (CAC Nos. MF9685 and MF9686) ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML16131A7982016-05-0606 May 2016 Audit Plan - Proposed Risk-Informed Approach to Resolve Generic Letter 2004-02 for Vogtle Electric Generating Plant, Units 1 and 2 (CAC Nos. MC4727 and MC4728) ML15082A1622015-03-31031 March 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 2024-09-09
[Table view] Category:Memoranda
MONTHYEARML24122C6202024-05-0101 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos.. 50-424, 50-424, 52-025, and 52-026 Meeting Number 20240471 ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML22348A0862023-07-25025 July 2023 Finding in Accordance with 10 CFR 52.103(G) That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 4 ML23115A0382023-05-0909 May 2023 Summary of Readiness Group Public Meeting on April 20, 2023 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML22214B4882023-02-0808 February 2023 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 4 ML22355A0322023-01-0303 January 2023 Revised Charter for the Vogtle Readiness Group to Oversee the Transition to Operations for Vogtle Units 3 and 4 ML22334A0812022-12-0101 December 2022 Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22237A0782022-08-0505 August 2022 American Nuclear Insurers, Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML20290A2812022-08-0101 August 2022 103g - Final Memorandum ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML21337A0032021-12-0707 December 2021 Summary of Vogtle Readiness Group Public Meeting on December 2, 2021 ML21322A1502021-12-0202 December 2021 Summary of November 10, 2021 Public Meeting with Southern Nuclear Operating Company ML21316A0692021-11-22022 November 2021 November 4, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21230A0102021-08-24024 August 2021 Summary of Public Meeting with Southern Nuclear Operating Company on August 12, 2021 ML21154A2772021-07-20020 July 2021 Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021 ML21194A0402021-07-20020 July 2021 Summary of June 24, 2021 Public Meeting with SNC ML21190A0622021-07-16016 July 2021 Summary of July 8 2021 Public Meeting to Discuss Late-Filed Allegation Process for Vogtle Electric Generating Plant Units 3 and 4 ML21194A0392021-07-16016 July 2021 July 8, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21124A2032021-05-0606 May 2021 ASME Alternative ALT-16 Pre-submittal Meeting Summary 4-29-21 ML21123A1432021-05-0505 May 2021 April 22, 2021, Summary of a Public Meeting with Southern Nuclear Operating Company ML20318A2422020-12-18018 December 2020 .72 50.73 Applicability Memo ML20351A2822020-12-10010 December 2020 Summary of Public Meeting with Southern Nuclear Operating Co ML20318A2412020-11-18018 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, to Discuss Topic Regarding Vogtle Electric Generating Plant, Unit 4: ITAAC Post Closure Notification for ITAAC Index Number 344 ML20303A0422020-11-0505 November 2020 Summary of October 22, 2020 Public Meeting with Southern Nuclear Operating Company NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20296A2432020-10-15015 October 2020 Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company ML20283A4652020-10-15015 October 2020 Summary of Public Meeting on October 8, 2020 with Southern Nuclear Operating Company ML20279A5202020-10-0707 October 2020 October 1, 2020, Summary of Public Meeting with Southern Nuclear Operating Company ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20262G9882020-09-22022 September 2020 September 17, 2020 Summary of Public Meeting with Southern Nuclear Operating Company ML20248H3292020-09-10010 September 2020 Meeting Summary for September 3, 2020 Public Meeting with Southern Nuclear Operating Company ML20247J4812020-09-10010 September 2020 Summary for August 27, 2020 Public Meeting with Southern Nuclear Operating Company ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ML20216A6252020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 30, 2020 ML20216A6362020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 23, 2020 ML20205L4312020-07-29029 July 2020 Summary of a Public Meeting with Southern Nuclear Operating Company to Discuss Inspections, Tests, Analyses and Acceptance Criteria Nos. 375 and 216 ML20178A1302020-07-15015 July 2020 Memorandum Transmitting Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 ML20190A0182020-07-0808 July 2020 Summary of Meeting Regarding the Vogtle Readiness Group ML20168A3352020-06-26026 June 2020 Summary of June 11, 2020 Public Meeting with Southern Nuclear Operating Company ML20150A0092020-06-0202 June 2020 Summary of May 28, 2020 Public Meeting with Southern Nuclear Operating Company ML20154K7272020-06-0202 June 2020 EOC Meeting Summary ML20141L6182020-06-0101 June 2020 Summary of May 14, 2020 Public Meeting with Southern Nuclear Operating Company ML20141L6982020-05-26026 May 2020 Audit Report for Vogtle Electric Generating Plant Unit 3 LAR 20-001: Auxiliary Building Wall 11 Seismic Gap Requirements ML20133K1062020-05-15015 May 2020 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR 20-004) 2024-05-01
[Table view] |
Text
June 12, 2018 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Don Habib, Project Manager /RA/
Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
AUDIT PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4, REQUEST FOR LICENSE AMENDMENT AND EXEMPTION: CHANGES TO TIER 2* DEPARTURE EVALUATION PROCESS (LAR 17-037)
By letter dated December 21, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML17355A416), Southern Nuclear Operating Company (the licensee) requested an amendment to Combined License Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
The requested amendment and exemption requires changes to the combined licenses in the form of a new license condition and an exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants that requires NRC approval in order for the VEGP Units 3 and 4 licensee to depart from Tier 2* information in the VEGP Units 3 and 4 updated final safety analysis report (UFSAR).
The requested amendment proposes new criteria that, if met, would allow the licensee to revise Tier 2* information in the UFSAR without NRC approval.
The Structural Engineering Branch staff plans to conduct an audit at the VEGP Units 3 and 4 site to gain better understanding of certain construction details that, if changed, would result in changes to Tier 2* information in the UFSAR and how these changes would be handled under the licensees proposed license condition.
Docket Nos.: 52-025 and 52-026
Enclosure:
Regulatory Audit Plan cc: See next page CONTACT: Donald Habib, NRO/DNRL/LB4 301-415-1035
ML18156A340 NRO-008 OFFICE DLSE/LB4/PM DLSE/LB4/LA DLSE/LB4/BC NAME DHabib RButler JDixon-Herrity DATE 6/12/18 6/06/18 6/11/18 Vogtle Units 3 & 4 Mailing List (Revised 03/13/2018) cc:
Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 42 Inverness Center Parkway, Bin 237 Birmingham, AL 35242 George B. Taylor, Jr.
2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 Regulatory Affairs Director Southern Nuclear Operating Company County Commissioner 42 Inverness Center Parkway, BIN B237 Office of the County Commissioner Birmingham, AL 35242 Burke County Commission Waynesboro, GA 30830 Mr. Michael Yox Site Regulatory Affairs Director Mr. Wayne Guilfoyle Vogtle Units 3 & 4 Commissioner District 8 7825 River Road, Bin 63031 Augusta-Richmond County Commission Waynesboro, GA 30830 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)
ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)
KSutton@morganlewis.com (Kathryn M. Sutton)
Page 2 of 3
Vogtle Units 3 & 4 Mailing List kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler)
Marc.Pickering@hq.doe.gov (Marc Pickering) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith)
Michael.Kuca@hq.doe.gov (Michael Kuca) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
RJB@NEI.org (Russell Bell)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Page 3 of 3
AUDIT OF DRAWINGS AND CONSTRUCTION STRUCTURES IN SUPPORT OF REQUEST FOR LICENSE AMENDMENT RELATED TO CHANGES TO TIER 2*
DEPARTURE EVALUATION PROCESS (LAR 17-037)
SOUTHERN NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 Docket Nos.52-025 and 52-026 Location: Vogtle Electric Generating Plant Units 3 and 4 Plant Site, Vogtle Support Center 7821 River Road Waynesboro, GA 30830 The purpose of the audit is to review the structural construction and supporting documents needed by staff to verify the information and conclusions in the Request for License Amendment and Exemption: Changes to Tier 2* Departure Process (LAR 17-037) submitted by Southern Nuclear Operating Company (SNC) for the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17355A416).
A.
Background:
In LAR-17-037, SNC proposes an exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants that requires U.S. Nuclear Regulatory Commission (NRC) approval in order to depart from changes to Tier 2*
information in the VEGP Units 3 and 4 Updated Final Safety Analysis Report (UFSAR) and proposes certain criteria that, if met, would allow the VEGP Units 3 and 4 licensee to depart from Tier 2* information without securing NRC approval.
In a draft response to a request for additional information, SNC proposed to revise one of its previously proposed criteria to account for possible future departures from Tier 2* information in Chapter 3 of the UFSAR related to critical structures (ADAMS Accession Nos. ML18102B682 and ML18145A289).
The Office of New Reactors (NRO) Projects staff determined that an audit of the critical section structural construction information is an appropriate method to confirm how the proposed criteria adequately address possible changes to Tier 2* information regarding critical sections in Chapter 3 of the UFSAR.
B. Regulatory Audit Basis 10 CFR Part 52, Appendix D, Section VIII.B.6.b and c describe how a licensee who references this appendix may not depart from Tier 2* information without prior NRC approval.
The NRC staff will follow NRO Office Instruction NRO-REG-108 (Revision 0), Regulatory Audits, (ADAMS Accession No. ML081910260) in performing the audit of the reports and calculations cited below.
Enclosure
C. Regulatory Audit Scope In LAR-17-037, SNC proposed several criteria, any one of which, if met by a proposed change to Tier 2* information, would require NRC approval in order to be implemented. In a draft response to staff request for additional information (RAI) 17-037-2, SNC proposed a revised criterion to address changes in the demand-to-capacity ratios for structural reinforcement in critical sections.
The purpose of the audit is for the staff to observe and understand the specific structural challenges to be addressed by this LAR.
D. Information and Other Material Necessary for the Regulatory Audit The audit will consist of a physical walkdown of example several structure specimens and a review of related detailed design and construction documents.
Other documents may be requested based on the staffs review of the above documents.
Appropriate handling and protection of proprietary information shall be acknowledged and observed throughout the audit.
E. Audit Team The following are the NRC audit team members:
Don Habib, Project Manager (NRC), Lead Sujit Samaddar, Structural Engineering Branch Chief Pravin Patel, Structural Engineering Technical Reviewer Vaughn Thomas, Structural Engineering Technical Reviewer The following are the licensee contacts:
Jason Redd (SNC)
Neil Haggerty (SNC)
F. Logistics The audit is planned to occur at the VEGP Units 3 and 4 construction site on June 7, 2018, beginning at the Vogtle Support Center located at 7821 River Road Waynesboro, GA 30830, and to finish on June 8, 2018, with a public meeting beginning at 10:00 a.m. at the Vogtle Support Center. The following schedule is planned:
- Arrive at Vogtle Support Center by Thursday, 7:45 a.m. Activities include badging, safety briefing, PPE, etc.
- Document review, tour of construction examples, and SNC presentation of specific construction issues to be addressed by LAR 17-037 (Start - 8:30 a.m.)
- Staffs review of revised draft response to RAI LAR-17-037-2, as assisted by work front tour and detailed documentation review - Thursday afternoon
- Audit closeout teleconference - Friday, 9:00 a.m.
- Public call - Discuss results of staffs review of draft RAI response, as assisted by previous days tour and reviews (Friday, 10:00 a.m.).
2
G. Special Requests If necessary, any circumstances arising during performance of the audit will be communicated between Don Habib (NRC) and an available SNC point of contact.
H. Deliverables At the completion of the audit, the NRC staff will prepare an audit report that will be declared and entered as an official agency record in ADAMS in accordance with NRO Office Instruction NRO-REG-108.
3