Audit Plan for Vogtle Electric Generating Plant Units 3 and 4 (LAR 19-006) ADS Blowdown Ftpot
ML19134A222
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/15/2019
From: Chandu Patel
NRC/NRO/DLSE/LB2
To: Jennifer Dixon-Herrity
NRC/NRO/DLSE/LB2
PATEL C/NRO
References
LAR 19-006
Download: ML19134A222 (9)


Text

May 15, 2019 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Chandu Patel, Senior Project Manager /RA/

Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

AUDIT PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4, REQUEST FOR LICENSE AMENDMENT:

CREDITING PREVIOUSLY COMPLETED ADS BLOWDOWN FIRST THREE PLANT TESTS (LAR 19-006)

By letter dated April 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19119A249), Southern Nuclear Operating Company (the licensee) requested an amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

The requested amendment requires changes to the COL Conditions and Updated Final Safety Analysis Report in the form of departures from the incorporated plant-specific Design Control Document Tier 2* and Tier 2 information and related changes to the VEGP Units 3 and 4 COL.

The requested amendment includes changes to credit the previously completed Automatic Depressurization System (ADS) Blowdown first three plant tests as described in the licensing basis documents, including COL Condition 2.D.(2)(a). Specifically, the proposed changes would revise the COL, License Condition 2.D.(2)(a)2, by removing the requirement to perform the ADS Blowdown first three plant test during preoperational testing.

CONTACT: Chandu Patel, NRO/DLSE/LB2 301-415-3025

J. Dixon-Herrity 2 The Reactor Systems, Nuclear Performance & Code Review Branch (NRO/SRSB), the Mechanical Engineering Branch (NRO/MEB), and the Quality Assurance Vendor Inspection Branch (NRO/QVIB) staff plan to conduct an audit to gain a better understanding of the proposed changes and to review related documentation and non-docketed information in order to evaluate conformance with the Standard Review Plan or technical guidance.

Docket Nos.: 52-025 and 52-026

Enclosure:

Regulatory Audit Plan cc: See next page

ML19134A222 NRO-008 OFFICE DLSE/LB2/PM DLSE/LB2/LA DLSE/LB2/BC NAME CPatel RButler JDixon-Herrity (PHearn for)

DATE 5/15/19 5/14/19 5/15/19 Vogtle Units 3 & 4 Mailing List (Revised 05/08/2019) cc:

Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company, Inc. 4244 International Parkway, Suite 120 Document Control Coordinator Bin N-226-EC Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 George B. Taylor, Jr.

2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 3535 Colonnade Parkway, Bin N-226-EC 42 Inverness Center Parkway, BIN B237 County Commissioner Birmingham, AL 35243 Office of the County Commissioner Burke County Commission Mr. Michael Yox Waynesboro, GA 30830 Site Regulatory Affairs Director Vogtle Units 3 & 4 Mr. Wayne Guilfoyle 7825 River Road, Bin 63031 Commissioner District 8 Waynesboro, GA 30830 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)

ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)

G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa)

Page 2 of 3

Vogtle Units 3 & 4 Mailing List Matthew.Williams@hq.doe.gov (Matthew Williams) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)

MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)

RJB@NEI.org (Russell Bell)

Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)

Page 3 of 3

AUDIT OF REPORTS AND CALCULATIONS IN SUPPORT OF A REQUEST FOR A LICENSE AMENDMENT RELATED TO CREDITING PREVIOUSLY COMPLETED AUTOMATIC DEPRESSURIZATION SYSTEM (ADS)

BLOWDOWN FIRST THREE PLANT TESTS SOUTHERN NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 Docket Nos.52-025 and 52-026 The purpose of the audit is to review the documentation and calculations needed by the U.S Nuclear Regulatory Commission (NRC) staff to verify the information and conclusions in the Request for License Amendment: Crediting Previously Completed ADS Blowdown First Three Plant Tests (LAR 19-006) submitted by Southern Nuclear Operating Company (SNC) for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19119A249).

A.

Background:

In LAR 19-006, SNC requests changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document Tier 2*

and Tier 2 information and related changes to the VEGP Units 3 and 4 Combined License (COL).

The LAR includes changes to credit previously completed Automatic Depressurization System (ADS) Blowdown first three plant tests as described in the licensing basis documents, including COL Condition 2.D.(2)(a). SNC requested prior NRC approval because the proposed changes impact the COL and plant-specific Tier 2* information.

B. Regulatory Audit Basis This regulatory audit is based on the following:

  • VEGP Unit 3, Current Facility Combined License NPF-91, Revised April 30, 2019, License Condition 2.D.(2)(a) (ADAMS Accession No. ML14100A106).
  • VEGP Unit 4, Current Facility Combined License NPF-92, Revised April 30, 2019, License Condition 2.D.(2)(a) (ADAMS Accession No. ML14100A135).

C. Regulatory Audit Scope and Methodology The audit team will view the documentation and calculations that provide the technical support for LAR 19-006. In addition, the audit team might request to discuss with subject matter expert(s) (1) potential differences between VEGP Units 3 and 4, and the plants for which testing has been conducted, (2) quality assurance of the test data, (3) physical phenomena

observed in the test data, and (4) design changes to the ADS valves in response to operating experience.

D. Information and Other Material Necessary for the Regulatory Audit The staff requests that the following documents be made available to the staff in the electronic reading room:

a) Applicable Quality Assurance (QA) requirements, administrative procedures, and ADS Blowdown test specification, test procedures, test diagnostic equipment, test acceptance criteria, blowdown test simulation, test results, test analysis methods, test reports, test anomaly resolution, and post-test analyses by Westinghouse Electric Company.

b) Reviews of QA requirements, administrative procedures, and ADS Blowdown test specification, test procedures, test diagnostic equipment, test acceptance criteria, blowdown test simulation, test results, test analysis methods, test reports, test anomaly resolution, and post-test analyses documented by the licensee.

c) Test observations documented by the licensee.

d) Disposition of inconsistencies in test procedures and other aspects noted in LAR 19-006.

e) Documentation of resolution of operational experience that resulted in design changes to ADS valves in support of the ADS Blowdown test that will be addressed as part of ADS valve qualification in accordance with American Society of Mechanical Engineers (ASME) Standard QME-1-2007, Qualification of Active Mechanical Equipment Used in Nuclear Power Plants, as accepted in NRC Regulatory Guide 1.100 (Revision 3),

Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification of Active Mechanical Equipment for Nuclear Power Plants.

f) Report documenting the review of Sanmen and Haiyang nuclear power plant design changes for the critical design attributes for the ADS Blowdown test.

Other documents may be requested based on the staffs review of the above documents.

The staff acknowledges and will observe appropriate handling and protection of proprietary information made available for the audit.

E. Audit Team The following are the NRC audit team members:

  • Alina Schiller, Project Manager The following are the licensee contacts:
  • Steve Leighty
  • Amy Chamberlain 2

F. Logistics Date: May 20, 2019 - August 1, 2019 Location: Westinghouse Electric Company, LLC Washington Operations 11333 Woodglen Drive, Suite 203 Rockville, Maryland 20852 Telephone: 301-881-7040/7042 Additionally, the review of documents supporting LAR 19-006, and identified in Section D of this audit plan, can be conducted at NRC Headquarters via the licensees electronic reading room.

Location: NRC Headquarters Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 G. Special Requests If necessary, the staff requests that subject matter expert(s) be made available to discuss the (1) potential differences between VEGP Units 3 and 4, and the plants for which testing has been conducted, (2) quality assurance of the test data, (3) physical phenomena observed in the test data, and (4) design changes to the ADS valves in response to operating experience.

Alina Schiller (NRC), NRC Project Manager, can be reached at 301-415-8177 or Alina.Schiller@nrc.gov.

H. Deliverables On completion of the audit, the staff will prepare an audit summary report within 45 days that will be declared and entered as an official agency record in ADAMS. The audit outcome may be used to identify any additional information to be submitted for making regulatory decisions and will assist the staff in the issuance of requests for additional information (if necessary) in completing its review of LAR 19-006.

3