MONTHYEARML20217N5521999-10-21021 October 1999 Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses ML20217H8921999-10-18018 October 1999 Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary ML20217F4801999-10-14014 October 1999 Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs ML20217F7221999-10-0707 October 1999 Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted ML20212L0411999-10-0505 October 1999 Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval ML20212J8761999-09-30030 September 1999 Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20217A9331999-09-30030 September 1999 Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl ML20212H2121999-09-27027 September 1999 Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20212H2151999-09-22022 September 1999 Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H ML20212A8711999-09-14014 September 1999 Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20211M5621999-09-0202 September 1999 Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 ML20211F7831999-08-26026 August 1999 Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV ML20210V1231999-08-17017 August 1999 Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program ML20211A8731999-08-16016 August 1999 Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable ML20210L8311999-07-27027 July 1999 Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/As ML20210E9781999-07-26026 July 1999 Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6) ML20210E1431999-07-22022 July 1999 Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout Encl NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) ML20210B7161999-07-20020 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01 ML20210B5271999-07-16016 July 1999 Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20209E8401999-07-13013 July 1999 Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 ML20209G4991999-07-12012 July 1999 Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations Noted ML20207H6741999-07-0606 July 1999 Forwards Operating Licensing Exam Rept 50-331/99-301(OL) on 990525.Staff Administered Written Exam to One Reactor Operator Applicant Previously Demonstrating Unsatisfactory Results During Jul 1998 Exam NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041999-07-0101 July 1999 Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl1999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl ML20212J4521999-06-25025 June 1999 Discusses Closure of TAC MA1188 Re Response to RAI to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests1999-06-23023 June 1999 Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests ML20196F9531999-06-21021 June 1999 Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld ML20196A1431999-06-18018 June 1999 Confirms Discussion Between Members of Staffs to Have Meeting on 990715 at Training Ctr at Duane Arnold Energy Ctr to Discuss Results of Plant Performance Review Process ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041999-07-0101 July 1999 Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl1999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests1999-06-23023 June 1999 Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests ML20196F9531999-06-21021 June 1999 Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld NG-99-0468, Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center1999-06-0303 June 1999 Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center NG-99-0625, Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b)1999-05-24024 May 1999 Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b) NG-99-0741, Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed1999-05-19019 May 1999 Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed NG-99-0700, Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6)1999-05-17017 May 1999 Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6) ML20206S7951999-05-11011 May 1999 Informs That Temporary Addendum to DAEC Security Plan Is No Longer Required & Should Be Removed.Addendum Was Transmitted to NRC in 981015 Licensee Ltr NG-99-0664, Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.7901999-05-10010 May 1999 Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.790 NG-99-0636, Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements1999-04-29029 April 1999 Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements NG-99-0633, Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs1999-04-29029 April 1999 Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs NG-99-0622, Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl1999-04-28028 April 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl NG-99-0605, Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center1999-04-28028 April 1999 Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center NG-99-0493, Forwards non-certified Application Re Reactor License Reapplication in Accordance with Provisions of Examiner Std (ES)-201 for Ma Ruchko.Nrc License Exam Scheduled for 990525.Without Encl1999-04-19019 April 1999 Forwards non-certified Application Re Reactor License Reapplication in Accordance with Provisions of Examiner Std (ES)-201 for Ma Ruchko.Nrc License Exam Scheduled for 990525.Without Encl NG-99-0495, Informs NRC That RW Pfeil Did Not Take BWR Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 990407.R Pfeil Is No Longer Enrolled in DAEC Operator Licensing Training Program1999-04-19019 April 1999 Informs NRC That RW Pfeil Did Not Take BWR Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 990407.R Pfeil Is No Longer Enrolled in DAEC Operator Licensing Training Program NG-99-0529, Forwards Outline of Exam to Be Given Week of 990524 as Requested in Telcon with G Thullen & Requests Exam Matls Be Withheld from Public Disclosure Until After Exam Completed on 9905281999-04-0808 April 1999 Forwards Outline of Exam to Be Given Week of 990524 as Requested in Telcon with G Thullen & Requests Exam Matls Be Withheld from Public Disclosure Until After Exam Completed on 990528 ML20205M2471999-04-0202 April 1999 Transmits Change 40 to DAEC Security Plan,Per Requirements of 10CFR50.54(p).Changes Are Intended to Enhance Capability of Onsite Security Force to Defend Against Design Basis Threat.Plan Withheld,Per 10CFR73.21 NG-99-0491, Requests Relief from Noted Requirements,For Relief Requests MC-R002 Through MC-R006,MC-P001 & NDE-R015,rev 1.Approval Is Requested Prior to Refueling Outage 16,scheduled to Begin on 9910081999-04-0202 April 1999 Requests Relief from Noted Requirements,For Relief Requests MC-R002 Through MC-R006,MC-P001 & NDE-R015,rev 1.Approval Is Requested Prior to Refueling Outage 16,scheduled to Begin on 991008 NG-99-0281, Forwards Decommissioning Funding Rept for Daec,Iaw 10CFR50.75(f)(1).Rept Is Being Submitted by DAEC Joint Owners Ies Utilities,Inc,Central IA Power Cooperative & Corn Belt Cooperative1999-03-31031 March 1999 Forwards Decommissioning Funding Rept for Daec,Iaw 10CFR50.75(f)(1).Rept Is Being Submitted by DAEC Joint Owners Ies Utilities,Inc,Central IA Power Cooperative & Corn Belt Cooperative NG-99-0273, Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-71999-03-24024 March 1999 Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-7 ML20207L8351999-03-10010 March 1999 Forwards Proprietary Rev 59A to Deac Emergency Telephone Book & non-proprietary Rev 20 to Section H of DAEC Emergency Plan, IAW 10CFR50,App E.Proprietary Info Withheld NRC-99-0300, Forwards Rev 15 to Pump & Valve IST Program for Daec1999-03-0101 March 1999 Forwards Rev 15 to Pump & Valve IST Program for Daec NG-99-0302, Forwards Fitness for Duty Program Performance for DAEC During Six Month Period Jul-Dec 1998 in Accordance with 10CFR26.71(d)1999-02-28028 February 1999 Forwards Fitness for Duty Program Performance for DAEC During Six Month Period Jul-Dec 1998 in Accordance with 10CFR26.71(d) ML20203G3041999-02-12012 February 1999 Informs of Rev to Security Plan for DAEC to Improve Flexibility in Deployment of Members of Security Force. Security Plan Change 39,reflecting Changes,Encl.Encl Withheld NG-99-0115, Submits Request for Enforcement Discretion to Tech Spec Surveillance Requirement 3.8.1.7 for Edgs.Listed New Commitment Being Made by Ltr1999-01-21021 January 1999 Submits Request for Enforcement Discretion to Tech Spec Surveillance Requirement 3.8.1.7 for Edgs.Listed New Commitment Being Made by Ltr ML20206S1691999-01-18018 January 1999 Forwards Proprietary Rev 59 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-98-2102, Informs That Util Completed Commitment to Assess & Implement Severe Accident Mgt Guidelines at Daec,Based Upon Generic Guidelines Developed by BWROG1998-12-31031 December 1998 Informs That Util Completed Commitment to Assess & Implement Severe Accident Mgt Guidelines at Daec,Based Upon Generic Guidelines Developed by BWROG NG-98-2059, Provides Response to NRC Request for Background Summary of TS Change (TSCR-006), Revise TS 3.6.1.3 Condition E & Add TS for Control Bldg/Standby Gas Treatment (Cb/Sbgt) Instrument Air Sys1998-12-21021 December 1998 Provides Response to NRC Request for Background Summary of TS Change (TSCR-006), Revise TS 3.6.1.3 Condition E & Add TS for Control Bldg/Standby Gas Treatment (Cb/Sbgt) Instrument Air Sys 1999-09-09
[Table view] |
Text
i i
Iowa Electric Light and Power Company March 1, 1993 NG-93-0623 JOHN i . I RANZ. JR.
s u a ent ute w: w
rates during LLRTs. This data comes from a number of sources including recently passed LLRTs, a survey of feedwater check ;
I valve experiences at other utilities, and an engineering study to determine the best available solution. Improvements will be accomplished by modifying the check valves internally and removing the actuator / indicators from them. A high point vent l line will also be added downstream of the check valves to facilitate conducting LLRTs and add flexibility to the test procedure.
2.0 DESCRIPTION
OF CHANGE l
The following description details the scope of design l
activities to be performed under this DCP.
2.1 Modification of V-14-1 and V-14-3 Both check valves are equipped with spring assist actuators originally intended to assist in seating the valves. Nitrogen supplied to pneumatic cylinders controls the actuators.
Actually, the actuators tend to over-rotate the discs, providing a leak path at the upper portion of the valve seat.
The valves are also equipped with Indicator / Damper mechanisms which provide indication of disc position and dampen the l
Attachment 2 to NG-93-0623 Page 2 of 6 l
l Impact between the disc and seat. Both the actuators and the indicators act through hinge shafts which are sealed by a series of packing glands. The frictional forces imparted into the shafts also impair the ability of the valves to seal properly. Due to these problems, both the actuators and indicators are being removed from the valves. Blind flanges will be installed in their place to prevent leakage from l stuffing box area. The actuator and indicator shafts will be modified to permit the discs to free-float, thereby eliminating the packing induced frictional forces. The nitrogen lines feeding the actuators will be removed. All electrical connections inside the drywell will be de-
- terminated and the cables will be removed back to junction boxes. A recent survey conducted by DAEC personnel revealed that most plants do not have the above appurtenances on their check valves.
In addition to the above workscope, the valve discs will be l re-set to improve the alignment of the valve disc to the valve body and insure that internal clearances are correct and interferences between these components are eliminated. Recent LLRTs, conducted after resetting the disc on V-14-3, revealed ,
better results than previously achieved.
j 2.2 Addition of High Point Vent Line The current LLRT procedure drains the downstream side of the check valves through the drywell sump drain lines. The current venting is provided for by the 1" drain lines themselves. This creates the possibility of unseating the valve disc as the system attempts to equalize the dif ferential pressure created by draining.
To aid draining the line, vent lines will be installed in the high point of the line, just upstream of manually-operated valves V-14-2 and V-14-4. These vent lines not only add system venting but also add the flexibility to change the test procedure by introducing an alternative point through which the line may be pressurized.
3.0 UNREVIEWED SAFETY QUESTION ANALYSIS To determine if the proposed modification constitutes an unreviewed safety question, the following questions must be addressed:
(1) Does the proposed activity increase the probability of occurrence of an accident previously evaluated in the UFSAR?
l t
Attachment 2 to NG-93-0623 Page 3 of 6 Response: No. Work being performed on the check valves will only serve to enhance the ability of the valves to perform their containment isolation functions.
The modifications are not changing the basis :
of operation of the valves. The actuators were not intended to control operation of the valves, but only to supplement their ability ,
to seal. Valve operation is, and will be, controlled exclusively by feedwater flow.
l Indication of valve disc position was helpful, l but not required for safe system operation.
By design, the check valves are verified open by the passage of feedwater flow and closed by the loss of feedwater flow. The use of a damper was redundant since the design of ,
tilting disc check valves inherently reduces l the effects of disc slam. l Finally, by replacing stuffing boxes with blind flanges the integrity of the system pressure boundary is maintained.
The addition of the vent line to the feedwater system likewise does not increase the probability of a loss of feedwater flow accident, as discussed in UFSAR Section ;
15.6.3, since failure of a 3/4" line would not significantly decrease flow to the reactor.
As stated in the Description of Change, !
Section 2.1, this modification is being implemented to improve valve performance and therefore will decrease the probability of an incident involving the feedwater system and as such will not affect the accident analysis in l
UFSAR chapter 15 or the NSOA.
(2) May the proposed activity increase the consequences of an accident previously evaluated in the UFSAR?
Response: No. Per section 3.1.2.5.6, the check valves are installed to nreclude the significant release of radioa',tivity and therefore, by
, design, mitigate the consequences of an l accident.
In the event of an accident, the modifications i to the feedwater system will improve the
Attachment 2 to NG-93-0623 Page 4 of 6 ability of the system to perform its containment isolation function. Therefore, the radiological consequences of an accident evaluated in the UFSAR are not altered by this modification. ,
Per UFSAR section 15.6.3, the accident analysis for loss of feedwater flow is not i altered by the proposed modification. The check valves will f unction largely as they did previously, and by design cannot affect feedwater flow.
Likewise, the failure of the vent line also would not significantly affect the flow of feedwater due to the small volume of flow which could escape through the 3/4" diameter line. UFSAR section 5.2.4.5.4 states that "make-up systems can maintain inventory in the case of a water- or steam- line break in a line having an inside diameter of 1 and 2 in.
"respectively"."
(3) May the proposed activity increase the probability of occurrence of a malfunction of equipment important to safety previously evaluated in the UFSAR?
Response: No. The activities being performed will not jeopardize the ability of the check valves or feedwater line to function as intended.
The deletion of equipment associated with the check valves meets the requirements of providing automatic isolation if necessary, as described in UFSAR section 6.2.4.2.1.4.
Design and materials used to modify the check valves will be in accordance with the construction code used initially for the valves. In addition, Table 3.1-1 of the l UFSAR, Note a, refers to the inside isolation valve as "a simple check valve", indicating that the valves were approved by the safety analysis prior to the addition of the ,
actuator / indicators. !
All work being performed on the ventline, l including design, material selection, and construction, will be under the jurisdiction of codes and standards which meet or exceed those originally intended for this system or l I I
D +
Attachment 2 to NG-93-0623 Page 5 of 6 which govern this particular system modification.
(4) May the proposed activity increase the consequences of a malfunction of equipment important to safety previously evaluated in the UFSAR?
Response: No. As stated in question 2, the radiological consequences of an accident, or malfunction, as evaluated in UFSAR chapter 15 are not changed by these modifications.
The check valves, when modified by this design change, will function largely as they did before DCR 756, by responding to feedwater flow, and will perform the same containment isolation function. The modifications are designed to decrease the leakage through the valve and should therefore improve the ability of the valve to isolate primary containment.
Additionally, by installing blind flanges over the stuffing box area, the likelihood of a radiological release through the valve stuffing bnx is decreased.
Failure . the vent lines, as it has been l mentioned, would not increase the consequences of a loss of feedwater flow accident since the make-up systems more than compensate for the lost volume.
(5) May the proposed activity create the possibility of an accident of a different type than any previously evaluated in the UFSAR?
l Response: No. All accident scenarios associated with this proposed modification have already been evaluated in UFSAR chapters 6 and 15.
No new scenarios are initiated as a result of these modifications. 1 (6) May the proposed activity create the possibility of a malfunction of equipment important to safety of a different type than any evaluated in the UFSAR?
l Response: No. Af ter implementing this modification, the check valves will function as simple check valves. The valve design is not being altered. Only extraneous equipment is being a
b Attachment 2 to NG-93-0623 Page 6 of 6 removed. These changes will not initiate a malfunction which hasn't been considered. As indicated in the response to question 3, the safety analysis has already evaluated the system with simple check valves.
UFSAR section 6.2.1.3 addresses all the concerns associated with line breaks inside the drywell. Therefore, the installation of new small-bore vent lines in the drywell will not initiate any previously un-addressed malfunctions.
(7) Does the proposed activity reduce the margin of safety as defined in the basis for any technical specification?
Response: No. The intent of the proposed modification is to improve system performance during ILRTs and LLRT's. A margin of safety is factored l 4
into containment leak rates to allow for deterioration of the pressure boundary between type A tests. Therefore, the results of this modification are intended to improve the leak rate performance within the existing margin of safety associated with the containment leakage testing program by decreasing the leakage through the check valves during type A testing.
I I
!