Confirms Data Presented in GE to Nrc,In Response to IE Bulletin 79-26.Loss of Boron Based on 50% Local Boron Depletion Is Predictable & Is Not Affected by Plant Operating Parameters
ML20010B950
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/02/1981
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-26, LQA8100222, NUDOCS 8108180526
Download: ML20010B950 (1)


Text

4 4

F GENER AL OFFICE P o Box 499, COLUMBUS, NEBRASKA 68601 Nebraska Pubh.c Power Distn. t memo ~E non s

..sei c

a LQA8100222 July 2, 1981

[0) \\ \\ I N'.l{y f

Mr. Karl V. Seyfrit, Director

/

U.S. Nuclear Regulatory Commission Qf r

Office of Inspection & Enforcement 9-Region IV D

fi[jyI IIS8l A {p 611 Ryan Plaza Driva b

Suite 1000 e

/

Arlington, Texas 76011 4

Subj ect:

Response to IE Bulletin No. 79-26, Rev. 1 O

" Boron Loss From BWR Control Blades"

Reference:

1) Letter from J. M. F11 ant to K. V. Seyfrit Dated January 8, 1980, " Response to IE Bulletin No. 79-26"
2) Letter from R. L. Gridley to Dr. W. V. Johnston (NRC)

Dated April 8, 1981, " Control Blade Examination and Response to Item 4 of IED 79-26, NEDE-24325-P"

Dear Mr. Seyfrit:

In Reference 1 the District stated that General Electric would file a generic report * 'th the NRC in response to Item 4 of IE Bulletin 79-26 which required destructive examination of BWR control blades.

The results of this examination were provided directly the NRC in Reference 2.

At the request of the staff, this letter is written to confirm that the data presented in Reference 2 are applicable to and representative of the control blades at Cooper Nuclear Station.

The GE report confirms that the loss of boron based on 50% local boron depletion is predictable, and is not affected by the plant operating parameters.

Sincerely, W

Jay M. Pilant Director of Licensing and Quality Assurance JMP:JDW.cmk cc: NRC Office of Inspection & Enforcement Division of Reactor Operations Inspection k

Washington, DC 20555 f

St O 0108180526 810702 PDR ADOCK 05000298 G