05000298/LER-1999-004-01, Forwards LER 99-004-01.Commitments Made by Util Are Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 99-004-01.Commitments Made by Util Are Encl
ML20209B668
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/28/1999
From: Peckham M
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209B674 List:
References
NLS990070, NUDOCS 9907070370
Download: ML20209B668 (2)


LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl
Event date:
Report date:
2981999004R01 - NRC Website

text

y.

-~-$-

I' Nebraska Public Power District Nebraska's Energy Leader l

NLS990070 June 28,1999 l

l b

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 1

Gentlemen:

Subject:

Licensee Event Report No. 1999-004-01 Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Revision 1 to the subject Licensee Event Report is forwarded as an enclosure to this letter.

Sincerely, N

M. F. Peckham Plant Manager

/rlb Enclosure cc: Regional Administrator USNRC - Region IV Senior Project Manager l

USNRC - NRR Project Directorate IV-1

\\

i 1

Senior Resident Inspector USNRC NPG Distribution INPO Records Center

,/ p' %'"

W. Turnbull

[/

MidAmerica Energy 9907070370 990628 PDR ADOCK 05000298 8

PDR U G [.~r O 31-Cooper Nuclear Station Po. Box 98/ Brownville, NE 683210098 1

Telephone: (Ml2) 825-3811/ Fax: (402) 825-5211 l

tw@ //www nppd com i

l' ATTACHMENT 3 LIST OF NRC COMMITMENTS l

Correspondence No:

NLS990070 The following table identifies those actions committed to by the District in this document.

Any other actions discussed in the submittal represent intended or i

l planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE

COMMITMENT

OR OUTAGE CNS will continue to monitor industry efforts for a proven solution to the corrosion bonding phenomenon which N/A results in SRVs lifting outside their Technical Specification Surveillance lift setpoint tolerance.

CNS will assign an individual to investigate the possibility of revising the existing CNS Technical N/A Specification SRV surveillance testing requirements to incorporate an SRV upper bound setpoint salue in the setpoint tolerance criteria.

1 i

l l

l PROCEDURE NUMBER O.42 l

REVISION NUMBER 6 l

PAGE 9 OF 13 l