Issue date: 02/12/1981
From: Davis S, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003B785 List:
References
LER-81-006-03L, LER-81-6-3L, NUDOCS 8102250521
Download: ML20003B786 (2)


Text

NRC FORM 366 U. S. NUCLEAR REGULATORY COMMISSION

. LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATICN)

I 6 lo l1l8 l9 Ml Ol 7

Cl Cl Nl ll@l UCENSEE CODE 14 01

S Ol -l O l OUCENSE l O iNUMBER 01 O l -l 01 O 25l@l264 l 1LICENSE l 1 l TYPE1l 140l@l57 CAT l 58 l@

CON'T loIti Mu',% l Ll@l Ol 5 l 01010l 3l 1 l 7 l@l 0 l 11 1 l 3 l 8 l 1 l@l 0 l 2 l 1 l 2 I 8 I 1 l@

7 8 60 61 DOCKET NUM8ER 68 69 EVENT DATE 74 75 A EPORT DATE do EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h Io i2I I At 1110 Steam Generator (SG) #11 Level Channel "D" was niaced nut of I lo 1a i i service oer T.S. 3.3.1.1 to correct a oroblem with its reference lea. I l o 141 1 #11 SG Level Channel "0" was returned to service at 1100 on 1-14-81. I Io !sI I The three redundant channels remained operable durino the event. This I lo is 1 I is not a recetitive occurrence. I 1 o 171 l I 1o ta l I l CCDE ODE SL CO E COMPONENT CODE SL 8 CO D'E S ODE ioisi i II Al@ l X I@ LX,j@ l V I A Il I V I E l X l@ IX l@ LZJ @

7 8 9 to 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPCRT AEVISION LE R EVENT YEAR REPORT NO. CCOE TYPE N O.

@ yyg/RO RE 1811l

,21 l-l 1010l6l 24 l/l 1013 l l Ll [,-j 10 l 22 23 26 27 28 29 30 31 32 EN AC O Pt.A T M MOURS 22 S8 I POR S. SUP L E MANUFAC RER lXl@lZl@ lZi@

33 34 35 lZl@

36 l010l0Iul 37 40

[el Y l@ l42N l@ lNl@

43 lFl11210l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS liloll Level transmitter ecualizino valve leak-throuch is believed to have caused I li t i l I an indication deviation' amono redundant safety channels. Both 1-LT-11130 I ii,2, I and parallel-connected 1-LT-1111 (control channel) were affected. Indi- I iii3i l cation returned to normal after blowdown of the shared reference leo and I i i i # 41 l transmitter piping. No preventive action is deemed necessarv. I 7 8 9 80 STA  % PCwER OTHER STATUS 0$ RY DISCOVERY DESCRIPTION Ii 15 I l El@ l 015 l 0 l@l NA l l8l@l Durina Loa Readinos I i ACTIVITY CO TENT l

RELEASE AMOUNT OP ACTIVITY LOCA TION CP RELEASE I i I e I L,Zj @D OP RELEASEW@l NA l l NA l l PERSONNEL EXPOS ES l NUM8ER TYPE DESCRIPTION l li171 1 01 01 Ol@l '

Zl@l" NA l

.ERSONNEi.'iNau' RIES NUMBER DESCRIPTION li la 8l l9 0101 Ol@l 7 11 12 NA 80 I

'OSE ESCR PT ON NA l l l i I 98 l9l Zl@l10 7 50

'SSU E DE CRIPTION @ 8102 25o 5a \

l 2 l o l l N f@l n I  !!IIIIIIIIIIl:1 7 .S 9 10 68 69 30 I h h o

LER NO. 81-06 DOCKET NO. 50-317 LICENSE NO. DPR-53 EVENT DATE 01-13-81 REPORT DATE 02-12-61 ATTACHMENT CAUSE DESCRIPTION AND CORRdCTIVE ACTIONS (CONT'D)

Operators had reported Channel L-lll3D indication deviated from that of the other three safety channels. (1-LIC-Ill3D indicated about 10 inches higher). Investigation showed control Channel L-1111 also was affected.

The transmitters share system connections to #11 Steam Generator. LT-1111 was removed from th! level control circuit.

Both transmitters were removed from service, their reference leg and equalizing lines were blown down. The reference leg was partially re-filled from the variable leg and time was allowed for completing the fill through steam condensation. When placed in service, all ill SG Level Channels were in agreement to within 1 inch.

i It is believed a smcIl leak existed in an equalizing or blowdown valve (less likely, due to redundancy) due to foreign material ca a valve seat.

The valves in question were operated and lines were blown down during the recent refueling outage. Foreign material could have entered a valve during lineup changes as the plant was being started up. No preventive action is deemed necessary due to redundancy of installations which in-clude 6 transmitters divided anong 4 sets of piping connections to the sys tem.