Monthly Operating Rept for Sept 1989 for Crystal River Unit 3.W/891012 Ltr
ML19325D195
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/30/1989
From: John Lane, Widell R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1089-06, 3F1089-6, NUDOCS 8910190168
Download: ML19325D195 (5)


Text

.

<4 .

=

COM PO R Allo N 1

October 12, 1989 3F1089-06 W = ant Control Desk U.S. Nuclear Regulatory Ctumission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 /,

,. Operating License No. DFR-72 Monthly Operating Report

/

Dear Sir:

Attached is the Crystal- River Unit 3 Sgtenber 1989 Monthly Operating Report.

. 'Ihis report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

( s RolfiC. Widell, Director Nuclear Operatione Site Support

/wla

' Attachment xc: Regional Administrator, Region II Senior Resident Inspector Ohh!hkh[jj2 FD0 ,

POST OFFICE BOX 219

  • CRYSTAL RIVER, FLORIDA 32629 0219 * (904) 7954486

> A Florida Progress Company

,f

+

l .

OPERATING DATA REPORT  :

DOCKET NO. 50 302 DATE 10 2 89  ;

Jim tane i i COMPLETED BY TELEPHONE (9041795 6486  !

OrfRATING STATUS i 1. . UNIT NAME: CRYSTAL RIVER UNIT 3 l j 2. Reporting Period: 9/1/89 throuah 9/30/89

3. Licensed Thermal Power (MWt): 2544 4., Nameplate Rating (Gross MWe): 890

. $. Design Electrical Rating (Net MWe): 825

6. Maxinun Dependable Capacity (Gross MWe): . 860
7. Maxinun Dependable Capacity (Net MWe): 821
8. If changes occur in Capacity Retings (Items number 3 through 7) since last report, Glve Reasons: '
9. Power levet to which restricted, if any (Net MWe): .N/A
10. Reasons for restrictions, if any: N/A r i THl$ MONTH YR. TO DATE CUMULATIVE-
11. HOUR $ IN REPORTING PERIOD 720.0 6551.0 110.039.0
12. NUMBER Of HOURS REACTOR WAS CRITICAL 0.0 2511.6 69.294.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6

,14 HOUR $ GENERATOR ON LINE 0.0 2461.1 67.854.5 0.0 0.0 I

15. UNIT RESERVE $HUTDOWN HOUR $ 0.0
16. GNOSS THERMAL ENERGY GENERATED (MWH) 0.0 5.251.134.0 152.768.098.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 1.761.401.0 52.199.071.0

' 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 1.669.920.0 49.571.562.0

19. UNIT SERVICE FACTOR 0.0% 37.6% 61.7%
20. UNIT AVAILASILITY FACTOR 0.0% 37.6% 61.7% ,
21. UNIT CAPACITY FACTOP. (Using MDC net) 0.0% 31.0% 56.0%
22. UNIT CAPACITT FA; TOR (Using DER net) 0.04 30.9% 54.6%
23. UNIT FORCED OUTAGE RATE 100.0% 36.2% 21.7% +

l 24. $HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (Type, Date, end Duration of Each):

Refuel VII. March 14. 1990. 74 days.

l.

25. IF $HUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/9/89 l; 26. UNITS lW TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY j INITIAL ELECTRICITY COMMERCIAL OPERAtl0N l

l

- .- _ _ . - __ a

. l'

._ , .O '  ?= >

L~

p-AVERAGE DAILY UNIT POWER LEVEL  !

DOCKET NO, 50-302 UNIT FLCRP-3 ,

DATE 10-2-89  !

COMPLETED BY Jim Lane '

TELEPHONE 1904) 795-C486 ,

4 MONTH SEPTEMBER l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL r (MWE-Net) (MWe-Net) j 1 0 17 0 2 0 18 0  !

3. 0 19 0 4 0 20 0  ;

Si 0 21 0 f

6. 0 22 0 7 0 23 0 t

8 ___ 0 24 0 9 0 25 0

[: 10 0' 26 0 11 _

0 '27 0 c 12' 0 28 0 i 13 0 29 0 14' 0 30 0 15 0 31 16 0-

' INSTRUCTIONS:

10n.-this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, iL- J

- - E y . -c _

7,

- - 2 UNIT SHUTDOWNS AND POWER REDUCTIOM DOCKET NO. 50-302' FLCRP-3

[

UNIT N490E .

DATE i n-9-no -

C REPO?.TRGONTH September 'gg 4

"L 3 g Licensee E Catase & Corret.five No. D.ite g 3g g ,;;; y 5 Event  ? k% "8 Action to

$E E Report

  • NO O Present Recurrence j 6[ g .

6 89-09 890826 F 720.0 D 4- 89-030-00 WB PUMPXX The Plant was brottght off-line to comply with Technical Specifications which require two operable Raw Water Pumps. Raw Water Pump 2-B did not pass its periodic surveillance test.

! The pump has been replaced and the plant is in the process of. starting-up.

1 2 3 4 F: Forced Reason: htfed Exhibit G-Instructisms S: Scheduled A Equipment Failure (Explain) for Preparation of Data B-Maintenance of Test $$*["i3cr,,

, , Entry Sheets for Licensee C-Refueling 3-Auto scram Event Repore ILER) File f NURI G- -,. '

D-Regulatory Restriction 4-conu nued 0161)

E-Operator Training & Ucense Examinatitm 5-Reducvd Load 9-Other F-Administrat'ive

  • G-Operational Error (Explain) Exhibit I - Same Source 19/77) ll other (Explain) 4 y .g g e g- 't *m+

's ' 4e*e **w W- *f

nr r

{e ;4 ,

Q a ;+ . ;.,+ ~

li*

p  :.' - +

MONTHLY OPERATIONAL

SUMMARY

STATEMENT.

-J i

DOCKET NO. 50-302~

  • UNIT FLCRP-3 DATE _10-2-89 -!

COMPLETED BY Jim Lane i TELEPHONE (904) 795-6486 I I!

MONTH SEPTEMBER'

SUMMARY

STATEMENT: .,

1 10n August 26,i1989, Crystal' River Unit 3 was administratively taken out of service to inspect

-. Raw -Water Pump '2B ;after it -failed a surveillance test. The pump was inspected and the E

impeller was found'not to be per design. A new impeller has.been installed in the pump.

i l

^

l u

l 2

I i

r i

i