Forwards Proposed Tech Specs 3.14,4.1 & 4.18 Re Hydraulic Shock Suppressors
ML19312B860
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/19/1976
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML19312B861 List:
References
NUDOCS 7911250062
Download: ML19312B860 (4)


Text

as", " ~

s 50 4 69/7 ?o / t#d NRC DISTRIBUTION FOR PAR s' 50 DOCKET MATERI AL TO. FROM: DATE OF DOCUMENT

,.r u 'lus che Duke Power Ccapany .,, 3

?,aleigh, NC ATE RECEIVED

, o, c ,, W 0 2ar.er Jr e

CLETTER INOTORIZ E D PROP INPUT FORM NUMBER OF COPIES RECEIVED C OR IGIN A L B UNCLASSlF:E D 3 Signed OCOPY OESCRIPTION ENCLOSU RE L r notariced 2-lv-75....trans the folleving: /;-d t tool /ChangetoTeCh.$pecs: Consis t;ing of revision t.c tech specs with, regarc to SNUBBERS

.......('.0 cys enc 1 rec'c)

~

"- - , , ~ ' ' ' ~ ,

,) .

1 M M* Cccnce 1-3 -

1

~

SAFETY FOR ACTION /INFORMATION ENVIRO 2-1-76 cor ASSIGNED AD : ASSIGNED AD :

/ BRANCH CHIEF : Purg/g (5j BRANCH CHIEF :

/ PROJECT l'ANAGER: 2e[ h PROJECT MANAGER :. I

/ LIC. ASST. : Sh e p aa r i LIC. ASST. :

- m INTERNAL OISTRIBUTION "T' d SYSTEMS SATETY PT. ANT qvsTFMg vvfTyn .rectr

[/ 4"E NRC PDR uvTMD'.AN TrnFqcn ERNST

/ I&E IM scWR0EDER BENAROYA BALLARD

/ OELD LAINAS SPANGLER _

/ GOSSICK & STAFF ENGINEERING IPPOLITO MIPC MAccAny SITE TECH CASE KNIGHT OPERATING REACTORS GAMMILL HANAUER SIFWEIL STELLO STEPP HARLESS PAWLICKI HULMAN OPERATING TECH PROJECT MANAGEMENT REACTOR SAFETY / EISENHUT SITE ANALYSIS BOYD ROSS / SHA0 V0 LLC.r R P. COLLINS NOVAK / BAER BUNCH HOUSTON ROSZTOCZY f. SCHUENCER J. COLLINS PETERSON CHECK / GRIMES KREGER MELTZ HELTEMES AT & I SITE SAFETY & ENVIRC SKOVil0LT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER EXTERN AL DISTRIBUTION CONTROL NUMBER

/ LPDR; tL) Alha llei , W NATL LAB BROOKHAVEN NATL LAB - i

(/ TIC REG. V-IE ULRIK50N(ORNL)  ! 'j/ t NSIC LA PDR ASLB i CONSULTANTS '

/ ACRS l la "'".rIMC/SE5*r iW at e n - n x /"

T O ' L. h % h e _ e J A ;- L 3 '

=**A Huv(Jk $

~ "- <

h NRC FGs:M 10G (2 7G)

DUKE POWER COMPANY

, ,, Powra Ben.otwo 422 Socru Cnuncu Srazzt, CnAnt.oTTz. N. C. 28242 WILLI AM Q.PARFCR.JR.

%CE Pets DENT ~

TELE *"O'*E: ANE4 70 4 Sec. Decouc* es - ,, 3 7 3-4C 8 3 February 19, 1976

g. W N

Mr. Benard C. Rusche Gy Director of Nuclear Reactor Regulation U ./ 2, i U. S. Nuclear Regulatory Commission / ( fikp ,j Washington, D. C. 20555 '][ 4% .A # -

Attention: Mr. R. A. Purple, Chief k#**

Operating Reactor Branch #1 g V

Re: Oconee Nuclear Station c) iD Docket Nos. 50-269, -270, -287

Dear Sir:

Your letter dated December 18, 1975 indicated various changes to model Technical Specificaricns relating to hydraulic shock suppressors which had previously been transmitted by your letter dated June 30, 1975.

These changes resulted from review of our August 15, 1975 submittal as well as consideration of other licensee submittals and your own further review of the subject.

Pursuant to 10 CFR 50.90, please find attached a proposed amendment to the Technical Specifications for the Oconee Nuclear Station which is in basic agreement with the revised model specifications which you supplied concerning hydraulic shock suppressors. The provision for monthly testing of shock suppressors whose seal material is not compatible with the operating environment has not been included since all Oconee shock suppressors have been determined to be compatible with tae operating environment. The provision for functional testing of the suppressors has not been included in our proposal. Functional testing of suppressors is performed at the vendor's factory to verify proper design, fabrication, and operation. The visual inspection of the suppressor is intended to  !

verify continued operability of the suppressors. It is also considered l that due to the internal design of the suppressors, it is extremely unlikely that a failure could occur. Oconee has not experienced a failure of a I suppressor due to internal failure. In addition, suppressors which require maintenance which could affect a ressor operation will be functionally

^

- tested prior to reinstall g(IL f.p ) ' J,Q q . .., g q.

7 1894 L

W m-*

. . Mr. B: nard C. Ruschs Fsbruary 19, 1976 Page 2

. e ,,

Table 4.18-1 indicates those safety related shock suppressors .-hich are to be considered by this Technical Specification. All suppressors in the Reactor Buildings have been classified as inaccessible during normal operation due to the radiation level and temperature considerations.

Suppressor surveillance will continue as presently required in Oconee Technical Specification 4.1 until such time that this request for amendment of the Facility Operating License is approved. Suppressor surveillance subsequent to approval cf this amendment will be performed within six months of the date of issuance of these technical specifications or within the previous surveillance frequency, whichever is sooner.

Ve truly yours, av' $.

  • William O. Parker, Jr.

MST:mmb Attachment

Mr. Berttrd C. Ruscha Fsbruary 19, 1976 Pcge 3 WILLIAM 0. PARKER,Jk.,beingdulysworn,statesthatbeisVicePresident of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to facility Operating Licenses DPR-38, DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

/

.x > . '

b . aw -

William O. Parker, Jr., Vic IPresident ATTEST b, '

ohn C. Goodman, Jr.

Assistant Secretary (Seal)

Subscribed and sworn to before me this 19th day of February 1976.

-c Notary Public (Notarial Seal)

My Comission Expires:

aH