Updated LER 79-056/03L-1:on 791108,twenty Fire Barrier Penetrations Were Determined Not Functional.Caused by Improper Interpretation of Procedures.Limiting Conditions for Operation Met
ML19309E652
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/09/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309E636 List:
References
LER-79-056-03L, LER-79-56-3L, NUDOCS 8004220746
Download: ML19309E652 (2)


Text

u..,

, . LICENSEE EVENT REPORT ,

CONTROL BLOCK. l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l0 l t8 l9l A l LICENSEE 7

L l J lCODE M l F l14 1 l@l IS 0 l0 l- l 0LICENSEl0 l0Nut.?pER l0 l0 l f 0 l025l@l4 26 l1LICENSE l1 l1.l1TYPE JG l@l l 57 CA f 5t; l@

37,[ l L l@l 0 l 5 l 0 l 0 l 0 l 3 l 4 18 l@l 1 11 lo l8 l 7 19 l@l 014 lo l 9 l 8 l0 l@

7 8 60 61 DOCKET NUMBER 63 63 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PRO 8ASLE CONSEQUENCES h o 2 l As a result of recent NRC and APCo Operations Quality Assurance Audits, approxiraately [ , ,

g g 20 fire barrier penetrations were determined not to be functional or potentially not l go g4; ; functional On 11/8/79 and.11/9/79. Tech. Spec. 3.7.1.2 requires all fire barrier. l .

l;; 7 ;-) ; penetrations protecting safety related areas to be functional. Tech. Spec. 3. 7.1.2  ;

, o ,, j l action statement requirements were met upon discovery of the problect. The health and [ ,

gsafety of the public were not affected by this event. g t

i O Ia l I I

~ SYSTEM cAUSE CAUSli COVP. . VALVE CODE COOE SUSCODE COMPONENT CODE SUSCODE SUSCOOE l0191 7 8 l AlB l@ yh Wh l Pl El Nl El Tl Rih lX lh y @

9 10 II 12 13 18 19 23 f

SEOUENTIAL CCCURRENCE REPORT F:EVISioN EVENT YE A R REPORT NO. {

LER/Ro CODE TYPE No. '

@ gu aE l7 l9 l

_ 29 22 l-l 23 l 01 Sl 6l 24 26 M

27 10l3l 28 29 lL 30 l l-l 31 W

32 EN ACT ON O PLA T ME HOURS 22 5 6'.tT E FOR b 3. SUPPLIE MAN A TURER Wg l33 Xlgl4X lg 3

l5Z l g 3 l25Zl@ [0 l0 l0 l0 l 31 40 l Ylg 41 42 l A lg l G l 2 l 5 l6 lg 43 44 47  ;

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l3l0llSee Attachment. I li t i l i I It 12 I I I

__l i 131 l I 1: 1411 I 7 8 9 80 ST S  % POWER OTHER STATUS IS O RY DISCOVERY DESCRIPTION

^

I115' l l C l@ ' l0 l0 l0 l@l" NA l (_Dj@l Insnection as a result of audits l AEnvirY COOT'EN T .

83 RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION CF RELEASE 1 6 l2l lZ l l NA l l NA l PERSONNEt ExPOSuAES

** t NUveER TvPE OESCRiPnONO NA l' ITl 'l '0 l 010 l@l Z l@l

l ,

,ERSON~E L ,~,uLS ". Sa NUveER OESCmPTiON@

7 i a 8 9 10l0l0l@l 11 12 NA l

. g3 LOSS OF OR DAMAGE TO FACILtTY TYPE DESCRIPTION NA L2_LJ 7 8 9 l z !@l i 10 E0 ISSU . P4 C USE CNLY ..

L,ED LUF @DE l CRIPTION NA 1 III!Ii!iiii!!i 8 ,0 g .8 ., so ;

rJAME OF PREPARER W. G. Hairste , III B 0 04 9,o7P m 899-5156 g

g, e, LER 79-056/03L-0 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS This event was caused by improper interpretation by plant personnel of which penetrations and walls fall under Technical Specifications and of procedures regarding fire barrier penetration operability which resulted in failure to initiate LCO action requirements.

"~ '

The following corrective actions have been taken:

l. LCO action requirements were met upon discovery of the problem.
2. Action was taken to repair inoperable penetrations.
3. Memoranda have been issued to appropriate plant personnel clari-fying procedural and LCO requirements.

Reinspection of all fire walls and associated penetrations was completed I on 1-25-80. Approximately 739 penetrations were inspected,

, _ , . with 161 needing repair. The majority (approximately 146) of the repairs j ,

were minor in na ture e.g. , surf ace damage to the penetration foam material. All repairs were completed by 2-5-80.

-