ML19289E780

From kanterella
Jump to navigation Jump to search
Forwards LER 79-004/03L-0
ML19289E780
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/22/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19289E781 List:
References
1-059-28, 1-59-28, NUDOCS 7905290103
Download: ML19289E780 (2)


Text

~ , - ~l 1

./j J

?

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 (501)371-4000 May 22, 1979 1-059-28 2046 559 Office of Inspection & Enforcement Region Four U. S. Nuclear Regulatory Commission 611 Ryan Plaza Dr., Suite 1000 Arlington, TX 76011 Attention: Mr. K. V. Seyfrit Director

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 Licence No. DPR-51 Reportable Occurrence Report No. 50-313/79-004 (File: 0520)

Gen tl emen :

In accordance with Arkansas Nuclear One - Unit 1 Technical Speci-fication 5.12.3.2, we have attached the subject report concerning the inability of the Reactor Building Spray Pump to respond to the ES signal within proper time limits as required by Technical Speci-fications.

Very truly yours, Covdd (.

David C. Trimble Manager, Licensing DCT/BI/lc MEMBE A MtCOLE SOUTH UTILITIES SYSTEM 79,05 2 90 /D3 '

. . ~ .

1-059-28 May 22, 1979 K. V. Seyfrit Attachment cc: 11 r . John G. Davis .

Acting Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Norman Haller Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. W. D. Johnson U. S. Nuclear Regulatory Commission P. O. Box 2090 Russellville, AR 728 046 560

,