ML19259A222

From kanterella
Jump to navigation Jump to search

Summary of September 16, 2019, Closed Meeting with Susquehanna Nuclear, LLC Regarding the Transition to Allow the Use of Atrium 11 Fuel for the Susquehanna Steam Electric Station, Units 1 and 2
ML19259A222
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/16/2019
From: Tanya Hood
Plant Licensing Branch 1
To:
Susquehanna
Hood T
References
EPID: L-2019-LLA-0153
Download: ML19259A222 (4)


Text

October 16, 2019 LICENSEE: Susquehanna Nuclear, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 and 2

SUBJECT:

SUMMARY

OF SEPTEMBER 16, 2019, CLOSED MEETING WITH SUSQUEHANNA NUCLEAR, LLC REGARDING THE TRANSITION TO ALLOW THE USE OF ATRIUM 11 FUEL FOR THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (EPID L-2019-LLA-0153)

On September 16, 2019, a closed meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Susquehanna Nuclear, LLC (the licensee) and Framatome Inc. (Framatome) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the Anticipated Transient Without Scram With Instability Analyses to allow the use of ATRIUM 11 fuel for the Susquehanna Steam Electric Station, Units 1 and 2. A list of attendees is provided as .

During the meeting, the NRC staff asked the licensee and Framatome to discuss the impact of the transition to ATRIUM 11 fuel on the Anticipated Transient Without Scram With Instability analysis results including:

a) Changes in core operating characteristics because of the ATRIUM 11 fuel.

b) Changes in operating limits for ATRIUM 11 fuel.

c) Changes that affect the time constant for heat transfer from fuel to coolant.

The licensee gave insight about the distribution of the pressure drop; an understanding about the gap conductance; and what references can be used to locate the comparative stability calculations. No regulatory decisions were made during the meeting.

Members of the public were not in attendance.

Please direct any inquiries to me at (301) 415-1387 or Tanya.Hood@nrc.gov.

Sincerely,

/RA/

Tanya E. Hood, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES SEPTEMBER 16, 2019, CLOSED MEETING WITH SUSQUEHANNA NUCLEAR, LLC REGARDING THE TRANSITION TO ALLOW THE USE OF ATRIUM 11 FUEL FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 Name Organization Ganesh Cheruvenki U.S. Nuclear Regulatory Commission (NRC)

Tanya Hood NRC Scott Krepel NRC Ashley Smith NRC Pete Snyder NRC Jason Hartzell Susquehanna Nuclear, LLC (Susquehanna)

Jeff Hirt Susquehanna Shane Jurek Susquehanna William Kahler Susquehanna Melisa Krick Susquehanna Ronald Vasquez Susquehanna Roland DeSteese Framatome Inc. (Framatome)

Christopher Hoffman Framatome Alan Meginnis Framatome Kevin Quick Framatome Daniel Tinkler Framatome Enclosure

ML19259A222 *by e-mail OFFICE DORL/LPL1/PM DORL/LPL1/LA DSS/STSB/BC* DSS/SNPB/BC NAME THood CSmith VCusumano RLukes DATE 09/16/2019 10/01/2019 10/03/2019 10/02/2019 OFFICE DSS/SRXB/BC DMLR/MVIB/BC DORL/LPL1/BC DORL/LPL1/PM NAME JBorromeo(A) DAlley JDanna THood DATE 10/02/2019 10/02/2019 10/16/2019 10/16/2019