UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 23, 2015 MEETING

SUMMARY

LICENSEE: SUSQUEHANNA NUCLEAR, LLC FACILITY: SUSQUEHANNA STEAM AND ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF PUBLIC MEETING On June 11, 2015 at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Susquehanna Energy Information Center. The NRC conducted the Annual Assessment Meeting open house to discuss its assessment of the safety performance at Susquehanna Steam and Electric Station for 2014.

A public meeting notice was issued on June 1, 2015, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15140A626. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards, provided handouts, and met with members of the public to discuss its assessment of the safety performance of Susquehanna Units 1 and 2 for the period of January 1 through December 31, 2014, as documented in our letter dated March 4, 2015 (ADAMS Accession No. ML15062A232). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, two members of the press, and Talen officials attended the open house and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency for ensuring safe plant operations.

/RA/

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

AAM Attendee List (ML15170A022)

ML15062A232). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, two members of the press, and Talen officials attended the open house and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency for ensuring safe plant operations.

Enclosures:

AAM Attendee List (M15170A022)

Distribution w/encl: M. Fannon, DRP, RI F. Bower, DRP B. Lin, DRP N. Esch, DRP, AA S. Barber, DRP P. Meier, DRP A. Turilin, DRP S. Rutenkroger, DRP, SRI

/RA/

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects DOC NAME: G:\DRP\BRANCH4\COMMUNICATIONS\PUBLIC MEETINGS\2014\2014 SUS AAM\

SUS ANNUAL ASSESSMENT MEETING

SUMMARY