ML18141A203
| ML18141A203 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/22/2018 |
| From: | James Krafty Reactor Projects Region 1 Branch 4 |
| To: | |
| Krafty J | |
| Shared Package | |
| ML18046A489 | List: |
| References | |
| MN-18-008 | |
| Download: ML18141A203 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 22, 2018 MEETING
SUMMARY
MN-18-008 LICENSEE:
SUSQUEHANNA NUCLEAR, LLC.
FACILITY:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF PUBLIC MEETING On May 17, 2017, at 4:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Susquehanna Energy Information Center in Berwick, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at the Susquehanna Steam Electric Station, Units 1 and 2 for 2017.
A Notice of the open house was issued on April 23, 2018, and was posted on the NRCs external (public) Webpage. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML18102A029. ADAMS is accessible from the NRCs Website at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts during the open house to discuss its assessment of the safety performance of Susquehanna Units 1 and 2 for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession No. ML18047A008). The NRCs poster boards included background information on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Susquehanna, Units 1 and 2 can be found on the NRC's website at https:// www.nrc.gov/ reactors/ operating/ oversight.html Members of the public and press, as well as, Susquehannas employees and local officials attended the open-house and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.
____________/RA/____________
James A. Krafty, Acting Chief Projects Branch 4 Division of Reactor Projects
Enclosure:
Attendee List ADAMS Accession No. ML18141A203
2
SUBJECT:
SUMMARY
OF PUBLIC MEETING FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, MAY 17, 2018, DATED MAY 22, 2018 DISTRIBUTION: (via email)
DLew, RA DCollins, DRA MGray, DRP DPelton, DRP MFerdas, DRP JYerokun, DRS BWelling, DRS JKrafty, BC SBarber, DRP ATurilin, DRP LMicewski, SRI TDaun, DRP, RI AGould, DRP, AA JBowen, RI, OEDO RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1 Resource ROPreports Resource DOCUMENT NAME: G:\\DRP\\BRANCH4\\Communications\\PUBLIC MEETINGS\\2018\\2018 SUSQ Annual Assessment Meeting Summary.docx ADAMS PKG. No. ML18046A489 ADAMS No. ML18141A203 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 5/21/18 5/22/18 OFFICIAL RECORD COPY
Name
- J)!MP /;ifl Mc wv{l-1\\Z
\\JJ I L t,,1 AJ\\/\\ S
-7"'
0
GAN1E/L
(//la /LeS r-z.Lo SUSQUEHANNA STEAM ELECTRIC STATION 2018 Open House ATTENDANCE LIST Organization TOw}.( S#1*f'...
t:: {) I° IL/( (/ I S' o (C
£,JwcA /lk'J/1 / l>L {)JJ.,,. r & c"/.1, VV I-\\ L IV'\\
RA 1) t 0 J1.. E ;- J IL t:!)
/l_ s [-; /.) e. h h /l_?L
'41ftRct-J W SLG'i,Bf,,;;,::,k'.,
'5AI.JE}A lt-u{)
k2c 11721::: I) i?M.A s CA J Ci\\.I\\.
5 c0t w-ftt; f? (C:)
E--1"'L5e_.