2018 Susquehanna Annual Assessment Meeting Summary and Attendance List
ML18141A203
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/22/2018
From: James Krafty
Reactor Projects Region 1 Branch 4
To:
Krafty J
Shared Package
ML18046A489 List:
References
MN-18-008
Download: ML18141A203 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 22, 2018 MEETING

SUMMARY

MN-18-008 LICENSEE: SUSQUEHANNA NUCLEAR, LLC.

FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF PUBLIC MEETING On May 17, 2017, at 4:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Susquehanna Energy Information Center in Berwick, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at the Susquehanna Steam Electric Station, Units 1 and 2 for 2017.

A Notice of the open house was issued on April 23, 2018, and was posted on the NRCs external (public) Webpage. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML18102A029. ADAMS is accessible from the NRCs Website at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and handouts during the open house to discuss its assessment of the safety performance of Susquehanna Units 1 and 2 for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession No. ML18047A008). The NRCs poster boards included background information on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Susquehanna, Units 1 and 2 can be found on the NRC's website at https:// www.nrc.gov/ reactors/ operating/ oversight.html Members of the public and press, as well as, Susquehannas employees and local officials attended the open-house and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.

____________/RA/____________

James A. Krafty, Acting Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

Attendee List ADAMS Accession No. ML18141A203

2

SUBJECT:

SUMMARY

OF PUBLIC MEETING FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, MAY 17, 2018, DATED MAY 22, 2018 DISTRIBUTION: (via email)

DLew, RA ATurilin, DRP DCollins, DRA LMicewski, SRI MGray, DRP TDaun, DRP, RI DPelton, DRP AGould, DRP, AA MFerdas, DRP JBowen, RI, OEDO JYerokun, DRS RidsNrrPMSusquehanna Resource BWelling, DRS RidsNrrDorlLpl1 Resource JKrafty, BC ROPreports Resource SBarber, DRP DOCUMENT NAME: G:\DRP\BRANCH4\Communications\PUBLIC MEETINGS\2018\2018 SUSQ Annual Assessment Meeting Summary.docx ADAMS PKG. No. ML18046A489 ADAMS No. ML18141A203 Non-Sensitive Publicly Available SUNSI Review Non-Publicly Available Sensitive OFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 5/21/18 5/22/18 OFFICIAL RECORD COPY

SUSQUEHANNA STEAM ELECTRIC STATION 2018 Open House ATTENDANCE LIST Name Organization

J)!MP/;ifl -

TOw}.( S#1*f' ...

t:: {) I° IL/( (/ I S' o (C Mc ,wv{l- \JJ I Lt,,1AJ\/\1\ZS £,JwcA /lk'J/1/ l>L {)JJ.,,. r & c"/.1, VV I-\ L IV'\ RA 1) t 0

-7"'

0 GAN1E/L J1.. E ;- J IL t:!)

(//la /LeS r-z.Lo /l_ s [-; /.) e. h h /l_?L

'41ftRct-J W SLG'i,Bf, ,;;,::,k'.,

'5AI.JE}A lt-u{)

k2c 11721::: I) i?M.A s

CA J Ci\ .I\. 5 c0t w-ftt; f? (C:) E--1"'L5e_.