Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24155A0882024-05-30030 May 2024 Email Summary of Verbal Authorization 1RR06 ML24150A3342024-05-29029 May 2024 Official RCIs for Susquehanna Proposed Alternative 1RR06 ML24087A0672024-04-22022 April 2024 Email to Melisa Krick Regarding Exemption Decision for Susquehanna ML24087A0682024-04-17017 April 2024 Email to Melisa Krick Regarding Availability of Environmental Assessment for the Susquehanna Exemption ML24106A0672024-04-12012 April 2024 State of Pennsylvania Input Review of Draft EA for Exemption Request for Susquehanna, Units 1 and 2 ML24103A0012024-04-11011 April 2024 – Summary of Verbal Authorization of 4RR-11 ML24102A1252024-04-10010 April 2024 Request for Additional Information for Susquehanna, Unit 1 Alternative Request 4RR-11 ML24106A0662024-04-10010 April 2024 Request for State Review of Draft EA for an Exemption Request for Susquehanna, Units 1 and 2 ML24082A0922024-03-21021 March 2024 Confirmation Email 3-21-2024 Regarding Exemption Request for Future Loading Only at Susquehanna ML24047A1232024-02-14014 February 2024 NRC Consultation with Commonwealth of PA Proposed NSHC for Susquehanna LAR TSTF-568 and TSF-563 Email ML24029A2732024-01-29029 January 2024 NRC Consultation with Commonwealth of Pennsylvania Re Proposed NSHC for Susquehanna License Amendment Request ML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML23345A0542023-12-0808 December 2023 Email - NRC LIC-109 Acceptance Review Results for Susquehanna License Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML23334A1682023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-01 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23242A2832023-08-30030 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternatives RR01 and RR02 (EPIDs L-2023-LLR-0043 and -0044) ML23230A0712023-08-18018 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative for Valve 251130 ML23188A0802023-07-0707 July 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Control Rod Technical Specifications ML23171A4312023-06-20020 June 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative 5RR-02 ML23103A4702023-04-12012 April 2023 NRR E-mail Capture - Susquehanna Unit 2 - Verbal Authorization of Relief Request 4RR-10 ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23075A0492023-03-16016 March 2023 NRR E-mail Capture - Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 - Indirect License Transfer and Draft Conforming Amendments ML23073A1202023-03-14014 March 2023 NRR E-mail Capture - Evacuation Time Estimate Review ML23013A2082023-01-13013 January 2023 Request for Additional Information ML23012A0012023-01-11011 January 2023 NRC Notification to the State of Pennsylvania Re. Emergency Amendment – Control Rod Technical Specifications ML22293A0882022-10-20020 October 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna License Transfer ML22257A1942022-09-14014 September 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Relocating Staff Qualification Requirements ML22213A2612022-08-0101 August 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Instrumentation and Control Technical Specifications ML22179A2902022-06-28028 June 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - TSTF-505, Risk Informed Completion Times ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22123A1112022-05-0303 May 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Relocate Staff Qualifications ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22084A0222022-03-25025 March 2022 NRR E-mail Capture - Susquehanna Atrium-11 LAR Audit Report ML22038A1062022-02-0404 February 2022 NRR E-mail Capture - Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML22005A0712021-12-21021 December 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna 1 & 2 ECCS TS LAR ML21190A1702021-06-11011 June 2021 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Regarding a Susquehanna Steam Electric Station, Unit 2 Amendment - Unit 1 Transformer Replacement ML21124A2022021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review for Susquehanna TSTF-505 ML20343A3712020-12-0808 December 2020 NRR E-mail Capture - Corrected - Acceptance Review of Susquehanna RR 4RR-02 ML20343A3702020-12-0808 December 2020 NRR E-mail Capture - Acceptance Review of Susquehanna RR 4RR-02 ML20335A5732020-11-30030 November 2020 NRR E-mail Capture - Susquehanna -Acceptance Review Replacement of Unit 1 Transformers ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20261H4272020-09-17017 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20261H4212020-09-16016 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20195B1282020-07-13013 July 2020 NRR E-mail Capture - Acceptance Review for Susquehanna- Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (EPID L-2020-Lla-0139) ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20028F6352020-01-28028 January 2020 NRR E-mail Capture - Acceptance Review of LAR to Revise the Dose Consequence Analysis for a Loss of Coolant Accident ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19234A0342019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for Advanced Framatome Methodologies for Atrium 11 2024-09-04
[Table view] |
Text
From: Klett, Audrey Sent: Friday, March 25, 2022 8:04 AM To: Jurek, Shane
Subject:
Susquehanna Atrium-11 LAR Audit Report (EPID L-2019-LLA-0153)
Attachments: Susquehanna A11 Audit Report 01.docx
- Shane, Attached is the summary report associated with audit the NRC performed in support of Amendment Nos. 279 and 261. The safety evaluation for those amendments references an incorrect record. This email and attachment will be added to ADAMS as an official agency record. Once I obtain the correct ADAMS Accession number, Ill share that with you.
-Audrey
Hearing Identifier: NRR_DRMA Email Number: 1571
Mail Envelope Properties (BLAPR09MB6067635CF7E7753DF6B44577871A9)
Subject:
Susquehanna Atrium-11 LAR Audit Report (EPID L-2019-LLA-0153)
Sent Date: 3/25/2022 8:04:08 AM Received Date: 3/25/2022 8:04:00 AM From: Klett, Audrey
Created By: Audrey.Klett@nrc.gov
Recipients:
"Jurek, Shane" <Shane.Jurek@talenenergy.com>
Tracking Status: None
Post Office: BLAPR09MB6067.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 366 3/25/2022 8:04:00 AM Susquehanna A11 Audit Report 01.docx 46359
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
AUDIT REPORT FOR
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
TO SUPPORT REVIEW OF THE LICENSE AMENDMENT REQUEST
REGARDING APPLICATION OF FRAMATOME METHODOLOGIES
FOR TRANSITION TO ATRIUM 11 FUEL
Facility Docket EPID Susquehanna Steam Electric Station, Unit 1 50-387 L-2019-LLA-0153 Susquehanna Steam Electric Station, Unit 2 50-388
1.0 INTRODUCTION
On November 21-December 11, 2019, the NRC staff conducted an audit of Talen Energys proposed License Amendment Request (LAR) regarding application of Framatome methodologies to support transition to ATRIUM 11 fuel for the Susquehanna Steam Electric Station, Units 1 and 2. The face-to-face portion of the audit was held at the Rockville office of the EXCEL Services Corporation on December 10-11, 2019. The NRC staff reviewed documents related to the submittal through an online portal for the remainder of the audit time.
2.0 BACKGROUND
By letter dated July 15, 2019, Talen Energy submitted a license amendment request for Susquehanna Steam Electric Station, Units 1 and 2 (SSES) to allow application of the Framatome analysis methodologies necessary to support a planned transition to ATRIUM 11 fuel under the currently licensed Maximum Extended Load Line Limit Analysis (MELLLA) operating domain (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML19196A270).
The NRC staff performed a detailed review of the proposed changes requested by Talen Energy. Due to the complexity of the proposed LAR, supporting calculations, and computer-based modelling, the NRC staff determined that an audit of the methodology would support timely resolution of technical issues more quickly than several rounds of requests for additional information requiring follow-up responses from the licensee.
The NRC staff conducted this audit in accordance with the Office of Nuclear Reactor Regulation Office Instruction LIC-111, Regulatory Audits. The NRC staff made no regulatory decisions during the audit.
3.0 AUDIT STAFFING
The NRC audit team was composed of the following members:
- Sujeta Goetz, Susquehanna Project Manager, Plant Licensing Branch II-2, NRR
- Josh Borromeo, Nuclear Systems Performance Branch Chief, NRR
The following personnel represented or supported Talen Energy during the audit:
Jason Hartzell, Talen Energy Michael Stone Talen Energy Dan Tinkler, Framatome Tim Guidotti, Framatome Alan Meginnis, Framatome
4.0 AUDIT SCOPE
The audit covered the following topics related to the LAR:
- Loss-of-Coolant Accident (LOCA) analyses
Audit information discussed for each topic is summarized in the sections that follow.
5.0 CONTAINMENT
During the audit, the containment discussion focused on the evaluations which were completed by the licensee to confirm that the containment mass and energy release analyses of record remain valid.
6.0 AOO/ATWS ANALYSES
The NRC staffs audit of the licensees AOO and ATWS analysis primarily focused on the plant specific implementation of the AURORA-B methodology. The audit discussions clarified many topic areas where questions arose during the NRC staffs initial review of the submittal.
7.0 LOCA ANALYSES
The NRC staff interviewed with Mr. Tim Guidotti (Framatome) and Jason Hartzell (Talen Energy) about the information documented in the Susquehanna LOCA analysis report (ANP-3784) and the supporting documents uploaded in the electronic reading room. We have drafted and clarified four RAI questions to be responded during this audit.
8.0 FUEL MECHANICAL
The NRC staff interviewed with Jason Hartzell (Talen Energy) about the information documented in the Susquehanna Fuel assembly and fuel rod analysis reports (ANP-3745 and 3
ANP-3762)) and the supporting documents uploaded in the electronic reading room. We have drafted and clarified one RAI question to be responded during this audit.
9.0 DOCUMENTS REVIEWED
The following documents provided by the licensee were reviewed by the NRC staff during the audit:
Framatome documents
ANP-3745, ANP-3762, ANP-3784, FS1-0042715, FS1-0042716, FS1-0042511, FS1-0014720, FS1-0042842, FS1-0042817, FS1-0040782, ANP-3592, ANP-3485, Limiting LOCA Input and Output S-RELAP files
Talen Energy documents
NONE
10.0 NEXT STEPS
The NRC staff will continue its review of the proposed LAR. The NRC staff intends to have draft RAIs to address any issues where further information is necessary to complete the review.