ML18064A842

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1995 for Palisades Nuclear Plant.W/950703 Ltr
ML18064A842
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/30/1995
From: Beries B, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9507110321
Download: ML18064A842 (5)


Text

'("

~

I consumers Power POWERiNii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 3, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of -Operating Experience for the Palisades Nuclear Plant for the month of June, 1995.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, AL Williams R~actor Engineef CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI.

BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades

  • SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports

(

U\'I I :9507110321 950630 I PDR ADOCK 05000255

. .. R____ ------* --- PD~ '1 A OHS' ENERGY' COMPANY

OPERATING DATA REPORT DOCKET NO 50-255 DATE 07-03-95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 950601-950630
3. LICENSED THERMAL POWER CMWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7 5.

6.

DESIGN ELECTRICAL RATING CNET MWe)

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 805.0

    • 770
  • 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 720.0 4343.0 206270.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL o;o 3394.2 117706.2
13. REACTOR RESERV~ SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 0.0 - 3394.2 113056.3
15. "UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH) 0.0 8384257.0 246674908.0
17. GROSS ELECTRICAL ENERGY GENERATED CMWH) 0.0 2720389.0 78085180.0
18. NET ELECTRICAL ENERGY GENERATED CMWH) 0.0 2587807.0 73684368.0
19. UNIT SERVICE FACTOR 0.0% 78.2% 54.8%
20. UNIT AVAILABILITY FACTOR. . 0.0% 78.2% 54.8%
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 81.6% 52.8%*

i

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 74.0% 44.4%
23. UNIT FORCED OUTAGE RATE 0.0% 4.4% 29.2%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

The 1995 Refuel,ing Outage began on 5/22/95 and is scheduled for. 92 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 8/24/95
26. UNITS IN TEST. STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 07/03/95 COMPLETED BY BWBerles MONTH ---~JU~N=E~-- TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20 .. 0
5. 0 21. 0
6. 0 22. 0
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0
10. 0 26. 0
11. 0 27. 0
12. 0 28. 0

(

13. 0 29. 0
14. 0 30. 0
15. 0 31.
16. 0 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe:NET for each day in the reportin~ month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1995 The unit began the month in a scheduled Refueling Outage and remained off-line for the entire month on June.

I' DOCKET NO 50-255 UN IT Pal is>1des DATE 07 /03./95 COMPLETED BY -,-----,-=BW""'B""e_,_r"""le=s REPORT MONTH ___J~U~N=E~1~9_95_ __ TELEPHONE (616)764-~913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 5 (Hours) Shutting Event Code Code Action to Down Reactor 3 Report # Prevent Recurrence 5/22/95 s c Currently in 92 day refueling outage which began 5/22/95.

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)