ML18059A673

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1994 for Palisades Nuclear Plant.W/940208 Ltr
ML18059A673
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/31/1994
From: Kluskowski P, Vanwagner M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9402180122
Download: ML18059A673 (5)


Text

i * ...

consumers Power POWERiNii NllCHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 February 8, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of January, 1994.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, PJ Kl uskowski Reactor Engineer CC: DPHoffman, P26-117B JMartin, USNRC JLKuemin, Palisades Resident Inspector, P~lis~des DRHahn; Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission*

Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades

  • GKatt, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 180013 r*. 94021eo122 940131 J*11': \

J.* ;,

PDR

~R ADOCK 05000255 PDR _JJ A CMS' ENER<SY COMPANY

OPERATING DATA REPORT DOCKET NO 50-255 DATE 01-31-94 COMPLETED BY MMVanWagner TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 940101-940131
3. LICENSED THERMAL POWER (MWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744.0 744.0 193911.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 109184.0
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 744.0 744.0 104545.6
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1844112.0 1844112.0 225506931.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 607580.0 607580.0 71226083.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 578503.0 578503.0 67161238.0
19. UNIT SERVICE FACTOR 100.0% 100.0% 53.9%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 53.9%
21. UNIT CAPACITY FACTOR (USING MDC NET) 106.5% 106.5% 51.5%*
22. UNIT CAPACITY FACTOR (USING DER NET) 96.6% 96.6% 43.0%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 29.5%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE.AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 02/07/94 COMPLETED BY MMVanWagner MONTH -----=J-'-"AN'"""'U'"'--'A'-'-'RY'---_ TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 791 17. 793
2. 793 18. 791
3. 793 19. 790
4. 792 20. 789
5. 793 21. 787
6. 796 22. 790
7. 789 23. 789
8. 796 24. 791
9. 790 25. 791
10. 794 26. 791
11. 791 27. 790
12. 792 28. 737
13. 789 29. 665
14. 792 30. 669
15. 790 31. 668
16. 792 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

DOCKET NO UNIT 50-255 Palisades DATE 01[06[94 COMPLETED BY MMVanWagner REPORT MONTH -----'J""A"'"NU=A=R"'--Y-=1=99._4.___ TELEPHONE {616 )764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause & Corrective 4 6 (Hours) Shutting Event Code Code Action to Down Reactor 3 Report # Prevent Recurrence NONE

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

-* . ~* -* .

SUMMARY

OF OPERATING EXPERIENCE FOR JANUARY 1994 The plant operated at full power until January 28. Plant power was reduced to 85% due to turbine control system problems. Power remained at 85% through the end of the month.